FAR Part 42: Contract Administration and Audit Services
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 84 sections, 18,724 words (Part 42 as in force, eCFR as of Oct 29, 2026). Overhaul text: 67 sections, 17,612 words (on acquisition.gov ↗, issued Sep 30, 2025, updated Nov 17, 2026). By number: 2 the same, 40 changed, 42 not in the overhaul (19 with the same heading under another number), 25 new.
42.1103: Changed (1% alike)
Today: Policy.
The contractor is responsible for timely contract performance. The Government will maintain surveillance of contractor performance as necessary to protect its interests. When the contracting office retains a contract for administration, the contracting officer administering the contract shall determine the extent of surveillance.
Overhaul text: Procedures.
(a)
(1) Agencies must assign responsibility and management accountability for the completeness of past performance submissions. Agency procedures for the past performance evaluation system must—
(i) Generally, provide for input to the evaluations from the technical office, contracting office, program management office, and, where appropriate, quality assurance and end users of the product or service;
(ii) Identify and assign past performance evaluation roles and responsibilities to those individuals responsible for preparing and reviewing interim evaluations, if prepared, and final evaluations (e.g., contracting officers, contracting officer representatives, project managers, and program managers). Those individuals identified may obtain information for the evaluation of performance from the program office, administrative contracting office, audit office, end users of the product or service, and any other technical or business advisor, as appropriate; and
(iii) Address management controls and appropriate management reviews of past performance evaluations, to include accountability for documenting past performance on CPARS.
(b)
(1)
(i) The evaluation must include a clear, non-technical description of the principal purpose of the contract or order.
(ii) The evaluation must reflect how the contractor performed.
(iii) The evaluation must include clear relevant information that accurately depicts the contractor's performance and be based on objective facts supported by program and contract or order performance data.
(iv) Tailor each evaluation to the contract type, size, content, and complexity of the contractual requirements.
(2) Evaluation factors for each assessment must include, at a minimum, the following:
(i) Technical (quality of product or service);
(ii) Cost control (not applicable for firm-fixed-price or fixed-price with economic price adjustment arrangements);
(iii) Schedule/timeliness;
(iv) Management or business relations;
(v) Small business subcontracting, including reduced or untimely payments to small business subcontractors when part 19 requires a subcontracting plan (as applicable, see Table 42-2); and
(vi) Other (as applicable) (e.g., trafficking violations, tax delinquency, failure to report in accordance with contract terms and conditions, defective cost or pricing data, terminations, suspension and debarments, and failure to comply with limitations on subcontracting).
(3) Evaluation factors may include subfactors.
(4) Each factor and subfactor used must be evaluated and a supporting narrative provided. Each evaluation factor, as listed in this paragraph ((b)(2)), must be rated in accordance with a five-scale rating system ( i.e., exceptional, very good, satisfactory, marginal, and unsatisfactory). The ratings and narratives must reflect the definitions in the tables 42-1 or 42-2 of this section.
(c)
(1) When the contract provides for incentive fees, the incentive-fee contract performance evaluation must be entered into CPARS.
(2) When the contract provides for award fee, the award fee-contract performance adjectival rating as described in part 16 must be entered into CPARS.
(d)
(1) Agency evaluations of contractor performance, including both negative and positive evaluations, prepared under this subpart must be provided to the contractor as soon as practicable after completion of the evaluation. The contractor will receive a CPARS-system generated notification when an evaluation is ready for comment.
(2) Contractors must be afforded up to 14 calendar days from the date of notification of availability of the past performance evaluation to submit comments, rebutting statements, or additional information.
(3) While the evaluation is an agency decision, agencies must provide for review at a level above the contracting officer in the event of disagreements between the parties.
(4) Evaluations of contractor performance developed on contracts awarded prior to April 1, 2026 should be marked “Source Selection Information.”
(5) Evaluations used in determining award or incentive fee payments may also be used to satisfy the requirements of this subpart.
(6) Agencies must provide a copy of the annual or final past performance evaluation to the contractor as soon as it is finalized.
(e)
(1) Agencies must prepare and submit all past performance evaluations electronically in CPARS at https://www.cpars.gov .
(2) The agency must make the past performance evaluation, including any contractor response, including any contractor-submitted information (with indication whether agency review is pending), available to source selection officials in the CPARS system within 14 days after the contractor notification of the evaluation's availability for comment.
(3) Contractors must be given 14 calendar days from notification to submit comments, rebutting statements, or additional information.
(4) The Government must update CPARS with any contractor comments provided within the 14-day timeframe given to contractors in this paragraph (e), as well as any subsequent agency review of comments received.
(5) Past performance evaluations for classified contracts and special access programs must not be reported in CPARS but will be reported as stated in this subpart and in accordance with agency procedures.
(6) Agencies must ensure that appropriate management and technical controls are in place to ensure that only authorized personnel have access to the data and the information safeguarded in accordance with paragraph (d) of this section.
(f) Agencies must use the past performance information in CPARS that is within 3 years (6 years for construction and architect-engineer contracts) of the completion of performance of the evaluated contract or order, and information contained in responsibility/qualification reports in the System Award Management (SAM), at SAM.gov, e.g., terminations for default or cause.
(g)
(1) Agencies use integrity records to support responsibility determinations, as addressed in part 9. Agencies must ensure information is accurately reported in the responsibility/qualification section of SAM within 3 calendar days after a contracting officer—
(i) Issues a final determination that a contractor has submitted defective cost or pricing data;
(ii) Makes a subsequent change to the final determination concerning defective cost or pricing data pursuant to part 15;
(iii) Issues a final termination for cause or default notice;
(iv) Makes a subsequent withdrawal or a conversion of a termination for default to a termination for convenience;
(v) Receives a final determination after an administrative proceeding, in accordance with part 22, that substantiates an allegation of a violation of the trafficking in persons prohibitions in part 22 and 52.222-50(b); or
(vi) Determines that a contractor has a history of three or more unjustified reduced or untimely payments to small business subcontractors under a single contract within a 12-month period (see 42.1102(g)(2)).
(2) The information posted in accordance with this paragraph (g) is information relating to contractor performance but does not constitute a “past performance review”, which would be exempted from public availability in accordance with section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212). Therefore, all such information posted in the responsibility/qualification section of SAM will be publicly available, unless covered by a disclosure exemption under the Freedom of Information Act (see part 9).
(3) Agencies manage users who can report integrity records in SAM.
(4) The contracting officer must follow the procedures in part 9 when handling information that may be covered by a disclosure exemption under the Freedom of Information Act.
Table 42-1—Evaluation Ratings Definitions
Rating Definition Note
(a) Exceptional Performance meets contractual requirements and exceeds many to the Government's benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(b) Very Good Performance meets contractual requirements and exceeds some to the Government's benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.
(c) Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract/order. There should have been NO significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be evaluated with a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
(d) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).
(e) Unsatisfactory Performance does not meet most contractual requirements, and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor's corrective actions appear or were ineffective To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).
Note 1: Plus or minus signs may be used to indicate an improving (+) or worsening (−) trend insufficient to change the evaluation status.
Note 2: N/A (not applicable) should be used if the ratings are not going to be applied to a particular area for evaluation.
Table 42-2—Evaluation Ratings Definitions
[For the small business subcontracting evaluation factor, when 52.219-9 is used]
Rating Definition Note
(a) Exceptional Exceeded all statutory goals or goals as negotiated. Had exceptional success with initiatives to assist, promote, and utilize small business (SB), small disadvantaged business (SDB), women-owned small business (WOSB), HUBZone small business, veteran-owned small business (VOSB) and service disabled veteran owned small business (SDVOSB). Complied with FAR 52.219-8, Utilization of Small Business Concerns. Exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Went above and beyond the required elements of the subcontracting plan and other small business requirements of the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period. To justify an Exceptional rating, identify multiple significant events and state how they were a benefit to small business utilization. A singular benefit, however, could be of such magnitude that it constitutes an Exceptional rating. Small businesses should be given meaningful and innovative work directly related to the contract, and opportunities should not be limited to indirect work such as cleaning offices, supplies, landscaping, etc. Also, there should have been no significant weaknesses identified.
(b) Very Good Met all of the statutory goals or goals as negotiated. Had significant success with initiatives to assist, promote and utilize SB, SDB, WOSB, HUBZone, VOSB, and SDVOSB. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met or exceeded any other small business participation requirements incorporated in the contract/order, including the use of small businesses in mission critical aspects of the program. Endeavored to go above and beyond the required elements of the subcontracting plan. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period. To justify a Very Good rating, identify a significant event and state how it was a benefit to small business utilization. Small businesses should be given meaningful and innovative opportunities to participate as subcontractors for work directly related to the contract, and opportunities should not be limited to indirect work such as cleaning offices, supplies, landscaping, etc. There should be no significant weaknesses identified.
(c) Satisfactory Demonstrated a good faith effort to meet all of the negotiated subcontracting goals in the various socio-economic categories for the current period. Complied with FAR 52.219-8, Utilization of Small Business Concerns. Met any other small business participation requirements included in the contract/order. Fulfilled the requirements of the subcontracting plan included in the contract/order. Completed and submitted Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate and timely manner. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period. To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor has addressed or taken corrective action. There should have been no significant weaknesses identified. A fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract/order.
(d) Marginal Deficient in meeting key subcontracting plan elements. Deficient in complying with FAR 52.219-8, Utilization of Small Business Concerns, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Failed to satisfy one or more requirements of a corrective action plan currently in place; however, does show an interest in bringing performance to a satisfactory level and has demonstrated a commitment to apply the necessary resources to do so. Required a corrective action plan. Did not have a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period. To justify a Marginal rating, identify a significant event that the contractor had trouble overcoming and how it impacted small business utilization. A Marginal rating should be supported by referencing the actions taken by the Government that notified the contractor of the contractual deficiency.
(e) Unsatisfactory Noncompliant with FAR 52.219-8 and 52.219-9, and any other small business participation requirements in the contract/order. Did not submit Individual Subcontract Reports and/or Summary Subcontract Reports in an accurate or timely manner. Showed little interest in bringing performance to a satisfactory level or is generally uncooperative. Required a corrective action plan. Had a history of three or more unjustified reduced or untimely payments to small business subcontractors within a 12-month period. To justify an Unsatisfactory rating, identify multiple significant events that the contractor had trouble overcoming and state how it impacted small business utilization. A singular problem, however, could be of such serious magnitude that it alone constitutes an Unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the actions taken by the Government to notify the contractor of the deficiencies. When an Unsatisfactory rating is justified, the contracting officer must consider whether the contractor made a good faith effort to comply with the requirements of the subcontracting plan required by FAR 52.219-9 and follow the procedures outlined in FAR 52.219-16, Liquidated Damages-Subcontracting Plan.
Note 1: Plus or minus signs may be used to indicate an improving (+) or worsening (-) trend insufficient to change evaluation status.
Note 2: Zero percent is not a goal unless the contracting officer determined when negotiating the subcontracting plan that no subcontracting opportunities exist in a particular socio-economic category. In such cases, the contractor will be considered to have met the goal for any socio-economic category where the goal negotiated in the plan was zero.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 42.000 | Scope of part. | Scope of part. | Same | 16 → 16 |
| 42.001 | [Reserved] | Interagency agreements. | Changed · 0% alike | 0 → 57 |
| 42.002 | Interagency agreements. | Cognizant Federal agency. | Changed · 11% alike | 85 → 117 |
| 42.003 | Cognizant Federal agency. | none | Not in the overhaul | 174 → – |
| 42.101 | Contract audit responsibilities. | Contract audit responsibilities. | Changed · 89% alike | 203 → 178 |
| 42.102 | Assignment of contract audit services. | Assignment of contract audit services. | Changed · 76% alike | 81 → 63 |
| 42.103 | Contract audit services directory. | Contract audit services directory. | Changed · 69% alike | 80 → 68 |
| 42.201 | Contract administration responsibilities. | Contract administration responsibilities. | Changed · 78% alike | 94 → 68 |
| 42.202 | Assignment of contract administration. | Assignment of contract administration. | Changed · 89% alike | 581 → 542 |
| 42.203 | Contract administration services directory. | Contract administration services directory. | Changed · 70% alike | 76 → 52 |
| 42.301 | General. | General. | Changed · 94% alike | 48 → 48 |
| 42.302 | Contract administration functions. | Contract administration functions. | Changed · 91% alike | 2160 → 2091 |
| 42.401 | Contract correspondence. | General. | Changed · 12% alike | 79 → 68 |
| 42.402 | Visits to contractors' facilities. | Assignment and location. | Changed · 4% alike | 287 → 156 |
| 42.403 | Evaluation of contract administration offices. | Responsibilities. | Changed · 8% alike | 35 → 123 |
| 42.500 | Scope of subpart. | Scope of subpart. | Changed · 40% alike | 28 → 17 |
| 42.501 | General. | Definition. | Changed · 4% alike | 185 → 34 |
| 42.502 | Selecting contracts for postaward orientation. | Purpose. | Changed · 4% alike | 176 → 71 |
| 42.503 | Postaward conferences. | General. | Same | 0 → 0 |
| 42.503-1 | Postaward conference arrangements. | Policy. | Changed · 9% alike | 91 → 203 |
| 42.503-2 | Postaward conference procedure. | Certificate of indirect costs. | Changed · 8% alike | 132 → 396 |
| 42.503-3 | Postaward conference report. | none | Not in the overhaul | 66 → – |
| 42.504 | Postaward letters. | Billing rates. | Changed · 8% alike | 58 → 349 |
| 42.505 | Postaward subcontractor conferences. | Final indirect cost rates. | Changed · 10% alike | 127 → 197 |
| 42.505-1 | none | Contracting officer determination procedure. | New number Same heading as today's 42.705-1 | – → 888 |
| 42.505-2 | none | Auditor determination procedure. | New number Same heading as today's 42.705-2 | – → 327 |
| 42.505-3 | none | Educational institutions. | New number Same heading as today's 42.705-3 | – → 643 |
| 42.505-4 | none | State and local governments. | New number Same heading as today's 42.705-4 | – → 74 |
| 42.505-5 | none | Nonprofit organizations other than educational institutions and state and local governments. | New number | – → 49 |
| 42.506 | none | Cost-sharing rates and limitations on indirect cost rates. | New number Same heading as today's 42.707 | – → 184 |
| 42.507 | none | Quick-closeout procedure. | New number Same heading as today's 42.708 | – → 313 |
| 42.508 | none | Penalties for Unallowable Costs. | New number Same heading as today's 42.709 | – → 0 |
| 42.508-1 | none | Scope. | New number | – → 84 |
| 42.508-2 | none | General. | New number | – → 147 |
| 42.508-3 | none | Responsibilities. | New number | – → 107 |
| 42.508-4 | none | Assessing the penalty. | New number Same heading as today's 42.709-4 | – → 234 |
| 42.508-5 | none | Computing Interest. | New number Same heading as today's 42.709-5 | – → 108 |
| 42.508-6 | none | Waiver of the penalty. | New number Same heading as today's 42.709-6 | – → 150 |
| 42.508-7 | none | Contract clause. | New number Same heading as today's 42.709-7 | – → 72 |
| 42.600 | none | Scope of subpart. | New number | – → 26 |
| 42.601 | General. | Notice of intent to disallow costs. | Changed · 5% alike | 74 → 407 |
| 42.602 | Assignment and location. | Contract clause. | Changed · 4% alike | 295 → 39 |
| 42.603 | Responsibilities. | Disallowing costs after incurrence. | Changed · 5% alike | 123 → 220 |
| 42.700 | Scope of subpart. | Scope of subpart. | Changed · 27% alike | 17 → 49 |
| 42.701 | Definition. | General. | Changed · 7% alike | 34 → 24 |
| 42.702 | Purpose. | Procedures. | Changed · 4% alike | 71 → 117 |
| 42.703 | General. | Solicitation provision and contract clause. | Changed · 0% alike | 0 → 21 |
| 42.703-1 | Policy. | none | Not in the overhaul | 234 → – |
| 42.703-2 | Certificate of indirect costs. | none | Not in the overhaul | 406 → – |
| 42.704 | Billing rates. | none | Not in the overhaul | 369 → – |
| 42.705 | Final indirect cost rates. | none | Not in the overhaul | 200 → – |
| 42.705-1 | Contracting officer determination procedure. | none | Not in the overhaul Same heading at 42.505-1 | 846 → – |
| 42.705-2 | Auditor determination procedure. | none | Not in the overhaul Same heading at 42.505-2 | 299 → – |
| 42.705-3 | Educational institutions. | none | Not in the overhaul Same heading at 42.505-3 | 779 → – |
| 42.705-4 | State and local governments. | none | Not in the overhaul Same heading at 42.505-4 | 85 → – |
| 42.705-5 | Nonprofit organizations other than educational and state and local governments. | none | Not in the overhaul | 27 → – |
| 42.706 | Distribution of documents. | none | Not in the overhaul | 81 → – |
| 42.707 | Cost-sharing rates and limitations on indirect cost rates. | none | Not in the overhaul Same heading at 42.506 | 257 → – |
| 42.708 | Quick-closeout procedure. | none | Not in the overhaul Same heading at 42.507 | 330 → – |
| 42.709 | Penalties for Unallowable Costs. | none | Not in the overhaul Same heading at 42.508 | 0 → – |
| 42.709-1 | Scope. | none | Not in the overhaul | 84 → – |
| 42.709-2 | General. | none | Not in the overhaul | 152 → – |
| 42.709-3 | Responsibilities. | none | Not in the overhaul | 146 → – |
| 42.709-4 | Assessing the penalty. | none | Not in the overhaul Same heading at 42.508-4 | 226 → – |
| 42.709-5 | Computing interest. | none | Not in the overhaul Same heading at 42.508-5 | 113 → – |
| 42.709-6 | Waiver of the penalty. | none | Not in the overhaul Same heading at 42.508-6 | 247 → – |
| 42.709-7 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 72 → – |
| 42.800 | Scope of subpart. | none | Not in the overhaul | 26 → – |
| 42.801 | Notice of intent to disallow costs. | General. | Changed · 5% alike | 386 → 47 |
| 42.802 | Contract clause. | Applicability. | Changed · 7% alike | 39 → 15 |
| 42.803 | Disallowing costs after incurrence. | Surveillance requirements. | Changed · 7% alike | 291 → 170 |
| 42.804 | none | Assignment of criticality designator. | New number Same heading as today's 42.1105 | – → 103 |
| 42.805 | none | Contract clause. | New number Same heading as today's 42.709-7 | – → 48 |
| 42.900 | Scope of subpart. | Scope of subpart. | Changed · 24% alike | 54 → 48 |
| 42.901 | General. | Responsibility for executing agreements. | Changed · 5% alike | 29 → 167 |
| 42.902 | Procedures. | Processing agreements. | Changed · 10% alike | 117 → 508 |
| 42.903 | Solicitation provision and contract clause. | Applicability of novation agreements. | Changed · 1% alike | 21 → 1986 |
| 42.904 | none | Agreement to recognize contractor’s change of name. | New number Same heading as today's 42.1205 | – → 555 |
| 42.1001 | none | General. | New number | – → 22 |
| 42.1002 | none | Suspension of work. | New number Same heading as today's 42.1302 | – → 45 |
| 42.1003 | none | Stop-work orders. | New number Same heading as today's 42.1303 | – → 291 |
| 42.1004 | none | Government delay of work. | New number Same heading as today's 42.1304 | – → 176 |
| 42.1005 | none | Contract clauses. | New number Same heading as today's 42.1305 | – → 151 |
| 42.1100 | none | Scope of subpart. | New number | – → 14 |
| 42.1101 | General. | General. | Changed · 5% alike | 48 → 224 |
| 42.1102 | Applicability. | Policy. | Changed · 2% alike | 31 → 703 |
| 42.1103 | Policy. | Procedures. | Changed · 1% alike | 43 → 2674 |
| 42.1104 | Surveillance requirements. | Contract clause. | Changed · 3% alike | 170 → 26 |
| 42.1105 | Assignment of criticality designator. | none | Not in the overhaul Same heading at 42.804 | 21 → – |
| 42.1106 | Reporting requirements. | none | Not in the overhaul | 167 → – |
| 42.1107 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 60 → – |
| 42.1200 | Scope of subpart. | none | Not in the overhaul | 48 → – |
| 42.1201 | [Reserved] | General. | Changed · 0% alike | 0 → 93 |
| 42.1202 | Responsibility for executing agreements. | none | Not in the overhaul | 165 → – |
| 42.1203 | Processing agreements. | none | Not in the overhaul | 504 → – |
| 42.1204 | Applicability of novation agreements. | none | Not in the overhaul | 1987 → – |
| 42.1205 | Agreement to recognize contractor's change of name. | none | Not in the overhaul Same heading at 42.904 | 550 → – |
| 42.1301 | General. | Procedures. | Changed · 5% alike | 48 → 349 |
| 42.1302 | Suspension of work. | none | Not in the overhaul Same heading at 42.1002 | 45 → – |
| 42.1303 | Stop-work orders. | none | Not in the overhaul Same heading at 42.1003 | 291 → – |
| 42.1304 | Government delay of work. | none | Not in the overhaul Same heading at 42.1004 | 176 → – |
| 42.1305 | Contract clauses. | none | Not in the overhaul Same heading at 42.1005 | 137 → – |
| 42.1500 | Scope of subpart. | none | Not in the overhaul | 66 → – |
| 42.1501 | General. | none | Not in the overhaul | 222 → – |
| 42.1502 | Policy. | none | Not in the overhaul | 699 → – |
| 42.1503 | Procedures. | none | Not in the overhaul | 1371 → – |
| 42.1504 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 26 → – |
| 42.1601 | General. | none | Not in the overhaul | 95 → – |
| 42.1701 | Procedures. | none | Not in the overhaul | 362 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress