The FAR overhaul, side by side
FAR Part 42: Contract Administration and Audit Services
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 84 sections, 18,724 words (Part 42 as in force, eCFR as of Oct 29, 2026). Overhaul text: 67 sections, 17,620 words (on acquisition.gov ↗, issued Sep 30, 2025). By number: 2 the same, 40 changed, 42 not in the overhaul (19 with the same heading under another number), 25 new.
42.302: Changed (91% alike)
Today: Contract administration functions.
(a) The contracting officer normally delegates the following contract administration functions to a CAO. The contracting officer may retain any of these functions, except those in paragraphs (a)(5), (a)(9), (a)(11), and (a)(12) of this section, unless the cognizant Federal agency (see 2.101) has designated the contracting officer to perform these functions.
(1) Review the contractor's compensation structure.
(2) Review the contractor's insurance plans.
(3) Conduct post-award orientation conferences.
(4) Review and evaluate contractors' proposals under subpart 15.4 and, when negotiation will be accomplished by the contracting officer, furnish comments and recommendations to that officer.
(5) Negotiate forward pricing rate agreements (see 15.407-3).
(6) Negotiate advance agreements applicable to treatment of costs under contracts currently assigned for administration (see 31.109).
(7) Determine the allowability of costs suspended or disapproved as required (see subpart 42.8), direct the suspension or disapproval of costs when there is reason to believe they should be suspended or disapproved, and approve final vouchers.
(8) Issue Notices of Intent to Disallow or not Recognize Costs (see subpart 42.8).
(9) Establish final indirect cost rates and billing rates for those contractors meeting the criteria for contracting officer determination in subpart 42.7.
(10) Attempt to resolve issues in controversy, using ADR procedures when appropriate (see subpart 33.2); prepare findings of fact and issue decisions under the Disputes clause on matters in which the administrative contracting officer (ACO) has the authority to take definitive action.
(11) In connection with Cost Accounting Standards (see 48 CFR 30.601 and 48 CFR chapter 99)—
(i) Determine the adequacy of the contractor's disclosure statements;
(ii) Determine whether disclosure statements are in compliance with Cost Accounting Standards and part 31;
(iii) Determine the contractor's compliance with Cost Accounting Standards and disclosure statements, if applicable; and
(iv) Negotiate price adjustments and execute supplemental agreements under the Cost Accounting Standards clauses at 48 CFR 52.230-2, 52.230-3, 52.230-4, 52.230-5, and 52.230-6.
(12) Determine the adequacy of the contractor's accounting system. The contractor's accounting system should be adequate during the entire period of contract performance. The adequacy of the contractor's accounting system and its associated internal control system, as well as contractor compliance with the Cost Accounting Standards (CAS), affect the quality and validity of the contractor data upon which the Government must rely for its management oversight of the contractor and contract performance.
(13) Review and approve or disapprove the contractor's requests for payments under the progress payments or performance-based payments clauses.
(14) Make payments on assigned contracts when prescribed in agency acquisition regulations.
(15) Manage special bank accounts.
(16) Ensure timely notification by the contractor of any anticipated overrun or underrun of the estimated cost under cost-reimbursement contracts.
(17) Monitor the contractor's financial condition and advise the contracting officer when it jeopardizes contract performance.
(18) Analyze quarterly limitation on payments statements and take action in accordance with Subpart 32.6 to recover overpayments from the contractor.
(19) Issue tax exemption forms.
(20) Ensure processing and execution of duty-free entry certificates.
(21) For classified contracts, administer those portions of the applicable industrial security program delegated to the CAO (see Subpart 4.4).
(22) Issue work requests under maintenance, overhaul, and modification contracts.
(23) Negotiate prices and execute supplemental agreements for spare parts and other items selected through provisioning procedures when prescribed by agency acquisition regulations.
(24) Negotiate and execute contractual documents for settlement of partial and complete contract terminations for convenience, except as otherwise prescribed by part 49.
(25) Negotiate and execute contractual documents settling cancellation charges under multi-year contracts.
(26) Process and execute novation and change of name agreements under subpart 42.12.
(27) Perform property administration (see part 45).
(28) Perform necessary screening, redistribution, and disposal of contractor inventory.
(29) Issue contract modifications requiring the contractor to provide packing, crating, and handling services on excess Government property. When the ACO determines it to be in the Government's interests, the services may be secured from a contractor other than the contractor in possession of the property.
(30) When contractors request Government property—
(i) Evaluate the contractor's requests for Government property and for changes to existing Government property and provide appropriate recommendations to the contracting officer;
(ii) Ensure required screening of Government property before acquisition by the contractor;
(iii) Evaluate the use of Government property on a non-interference basis in accordance with the clause at 52.245-9, Use and Charges;
(iv) Ensure payment by the contractor of any rental due; and
(v) Modify contracts to reflect the addition of Government-furnished property and ensure appropriate consideration.
(31) Perform production support, surveillance, and status reporting, including timely reporting of potential and actual slippages in contract delivery schedules.
(32) Perform preaward surveys (see Subpart 9.1).
(33) Advise and assist contractors regarding their priorities and allocations responsibilities and assist contracting offices in processing requests for special assistance and for priority ratings for privately owned capital equipment.
(34) Monitor contractor industrial labor relations matters under the contract; apprise the contracting officer and, if designated by the agency, the cognizant labor relations advisor, of actual or potential labor disputes; and coordinate the removal of urgently required material from the strikebound contractor's plant upon instruction from, and authorization of, the contracting officer.
(35) Perform traffic management services, including issuance and control of Government bills of lading and other tran portation documents.
(36) Review the adequacy of the contractor's traffic operations.
(37) Review and evaluate preservation, packaging, and packing.
(38) Ensure contractor compliance with contractual quality assurance requirements (see part 46).
(39) Ensure contractor compliance with contractual safety requirements.
(40) Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production.
(41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development, production, engineering changes, subcontractors, tests, management of engineering resources, reliability and maintainability, data control systems, configuration management, and independent research and development.
(42) Review and evaluate for technical adequacy the contractor's logistics support, maintenance, and modification programs.
(43) Report to the contracting office any inadequacies noted in specifications.
(44) Perform engineering analyses of contractor cost proposals.
(45) Review and analyze contractor-proposed engineering and design studies and submit comments and recommendations to the contracting office, as required.
(46) Review engineering change proposals for proper classification, and when required, for need, technical adequacy of design, producibility, and impact on quality, reliability, schedule, and cost; submit comments to the contracting office.
(47) Assist in evaluating and make recommendations for acceptance or rejection of waivers and deviations.
(48) Evaluate and monitor the contractor's procedures for complying with procedures regarding restrictive markings on data.
(49) Monitor the contractor's value engineering program.
(50) Review, approve or disapprove, and maintain surveillance of the contractor's purchasing system (see part 44).
(51) Consent to the placement of subcontracts.
(52) Review, evaluate, and approve plant or division-wide small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business master subcontracting plans.
(53) Obtain the contractor's currently approved company- or division-wide plans for small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting for its commercial products, or, if there is no currently approved plan, assist the contracting officer in evaluating the plans for those products.
(54) Assist the contracting officer, upon request, in evaluating an offeror's proposed small, small disadvantaged women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans, including documentation of compliance with similar plans under prior contracts.
(55) By periodic surveillance, ensure the contractor's compliance with small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans and any labor surplus area contractual requirements; maintain documentation of the contractor's performance under and compliance with these plans and requirements; and provide advice and assistance to the firms involved, as appropriate.
(56) Maintain surveillance of flight operations.
(57) Assign and perform supporting contract administration.
(58) Ensure timely submission of required reports.
(59) Issue administrative changes, correcting errors or omissions in typing, contractor address, facility or activity code, remittance address, computations, which do not require additional contract funds, and other such changes (see 43.101).
(60) Cause release of shipments from contractor's plants according to the shipping instructions. When applicable, the order of assigned priority shall be followed; shipments within the same priority shall be determined by date of the instruction.
(61) Obtain contractor proposals for any contract price adjustments resulting from amended shipping instructions. Review all amended shipping instructions on a periodic, consolidated basis to ensure that adjustments are timely made. Except when the ACO has settlement authority, the ACO shall forward the proposal to the contracting officer for contract modification. The ACO shall not delay shipments pending completion and formalization of negotiations of revised shipping instructions.
(62) Negotiate and/or execute supplemental agreements, as required, making changes in packaging subcontractors or contract shipping points.
(63) Cancel unilateral purchase orders when notified of nonacceptance by the contractor. The CAO shall notify the contracting officer when the purchase order is canceled.
(64) Negotiated and execute one-time supplemental agreements providing for the extension of contract delivery schedules up to 90 days on contracts with an assigned Critically Designator of C (see 42.1105). Notification that the contract delivery schedule is being extended shall be provided to the contracting office. Subsequent extensions on any individual contract shall be authorized only upon concurrence of the contracting office.
(65) Accomplish administrative closeout procedures (see 4.804-5).
(66) Determine that the contractor has a drug-free workplace program and drug free awareness program (see subpart 26.5).
(67) Support the program, product, and project offices regarding program reviews, program status, program performance and actual or anticipated program problems.
(68) Monitor the contractor's environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract. ACO responsibilities include—
(i) Requesting environmental technical assistance, if needed;
(ii) Monitoring contractor compliance with specifications or other contractual requirements requiring the delivery, use, or furnishing of sustainable products and services (as defined in 2.101) in accordance with the clause at 52.223-23. This must occur as part of the quality assurance procedures set forth in part 46; and
(iii) As required in the contract, ensuring that the contractor complies with the reporting requirements relating to recovered material content (see 52.223-9) and biobased products (see 52.223-2) utilized in contract performance.
(69) Administer commercial financing provisions and monitor contractor security to ensure its continued adequacy to cover outstanding payments, when on-site review is required.
(70) Deobligate excess funds after final price determination.
(71) Ensure that the contractor has implemented the requirements of 52.203-13, Contractor Code of Business Ethics and Conduct.
(b) The CAO shall perform the following functions only when and to the extent specifically authorized by the contracting office:
(1) Negotiate or negotiate and execute supplemental agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.
(2) Negotiate prices and execute priced exhibits for unpriced orders issued by the contracting officer under basic ordering agreements.
(3) Negotiate or negotiate and execute supplemental agreements changing contract delivery schedules.
(4) Negotiate or negotiate and execute supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements.
(5) Issue amended shipping instructions and, when necessary, negotiate and execute supplemental agreements incorporating contractor proposals resulting from these instructions.
(6) Negotiate changes to interim billing prices.
(7) Negotiate and definitize adjustments to contract prices resulting from exercise of an economic price adjustment clause (see subpart 16.2).
(8) Issue change orders and negotiate and execute resulting supplemental agreements under contracts for ship construction, conversion, and repair.
(9) Execute supplemental agreements on firm-fixed price supply contracts to reduce required line item quantities and deobligate excess funds when notified by the contractor of an inconsequential delivery shortage, and it is determined that such action is in the best interests of the Government, notwithstanding the default provisions of the contract. Such action will be taken only upon the written request of the contractor and, in no event shall the total downward contract price adjustment resulting from an inconsequential delivery shortage exceed $250.00 or 5 percent of the contract price, whichever is less.
(10) Execute supplemental agreements to permit a chance in place of inspection at origin specified in firm fixed-price supply contracts awarded to nonmanufacturers, as deemed necessary to protect the Government's interests.
(11) Prepare evaluations of contractor performance in accordance with subpart 42.15.
(c) Any additional contract administration functions not listed in 42.302(a) and (b), or not otherwise delegated, remain the responsibility of the contracting office.
Overhaul text: Contract administration functions.
(a) The contracting officer normally delegates the following contract administration functions to a CAO. The contracting officer may retain any of these functions, except those in paragraphs (a)(5), (a)(9), (a)(11), and (a)(12) of this section, which must be performed by the cognizant Federal agency.
(1) Review the contractor’s compensation structure.
(2) Review the contractor’s insurance plans.
(3) Conduct post-award orientation conferences.
(4) Review and evaluate contractors' proposals under subpart 15.4 and, when the contracting officer will conduct negotiations, furnish comments and recommendations to that officer.
(5) Negotiate forward pricing rate agreements (see part 15 and subpart 42.13).
(6) Negotiate advance agreements pursuant to the contract cost principles in part 31.
(7) Determine the allowability of costs suspended or disapproved as required (see subpart 42.6), direct the suspension or disapproval of costs when there is reason to believe they should be suspended or disapproved, and approve final vouchers.
(8) Issue Notices of Intent to Disallow or not Recognize Costs (see subpart 42.6).
(9) Establish final indirect cost rates and billing rates for contractors meeting the criteria for contracting officer determination in subpart 42.5.
(10) Attempt to resolve issues in controversy, using alternative dispute resolution (ADR) procedures when appropriate (see part 33); prepare findings of fact; and issue decisions under the Disputes clause on matters in which the administrative contracting officer (ACO) has the authority to take definitive action.
(11) In connection with Cost Accounting Standards (CAS) (see part 30 and 48 CFR chapter 99)-
(i) Determine the adequacy of the contractor’s disclosure statements;
(ii) Determine whether disclosure statements are in compliance with CAS and part 31;
(iii) Determine the contractor’s compliance with CAS and disclosure statements, if applicable; and
(iv) Negotiate price adjustments and execute supplemental agreements under the CAS clauses at 52.230-2, 52.230-3, 52.230-4, 52.230-5, and 52.230-6.
(12) Determine the adequacy of the contractor’s accounting system. The contractor’s accounting system should be adequate during the entire period of contract performance. The adequacy of the contractor’s accounting system and its associated internal control system, as well as contractor compliance with the CAS, affects the quality and validity of the contractor data the Government relies on for contractor oversight.
(13) Review and approve or disapprove contractor requests for financing payments (see part 32).
(14) Make payments on assigned contracts when prescribed in agency acquisition regulations.
(15) Manage special bank accounts.
(16) Ensure the contractor notifies the contracting officer in a timely manner of any anticipated overrun or underrun of the estimated cost under cost-reimbursement contracts.
(17) Monitor the contractor’s financial condition and advise the contracting officer when it jeopardizes contract performance.
(18) Analyze quarterly limitation on payments statements and act in accordance with part 32 to recover overpayments from the contractor.
(19) Issue tax exemption forms.
(20) Ensure processing and execution of duty-free entry certificates.
(21) For classified contracts, administer delegated portions of the industrial security program delegated to the CAO (see part 40).
(22) Review and negotiate supplemental agreements in response to contractor work requests under maintenance, overhaul, modification, and repair contracts.
(23) Negotiate prices and execute supplemental agreements for spare parts and other items selected through provisioning procedures when prescribed by agency acquisition regulations.
(24) Negotiate and execute settlement of partial and complete contract terminations for convenience, unless stated otherwise by part 49.
(25) Negotiate and execute settlements of cancellation charges under multiyear contracts.
(26) Process and execute novation and change of name agreements under subpart 42.9.
(27) Perform property administration (see part 45).
(28) Perform necessary screening, redistribution, and disposal of contractor inventory.
(29) Issue contract modifications requiring the contractor to provide packing, crating, and handling services on excess Government property.
(30) When contractors request Government property-
(i) Evaluate contractor’s requests for Government property and for changes to existing Government property, and provide appropriate recommendations to the contracting officer;
(ii) Ensure required screening of Government property before acquisition by the contractor;
(iii) Evaluate the use of Government property on a non-interference basis in accordance with the clause at 52.245-9, Use and Charges;
(iv) Ensure contractor payment of any rental due; and
(v) Modify contracts to reflect the addition of Government-furnished property and ensure appropriate consideration.
(31) Perform production support, surveillance, and status reporting, including timely reporting of potential and actual slippages in contract delivery schedules.
(32) Perform preaward surveys (see part 9).
(33) Advise and assist contractors regarding their priorities and allocations responsibilities and assist contracting offices in processing requests for special assistance and for priority ratings for privately owned capital equipment (see part 11).
(34) Monitor contractor industrial labor relations matters under the contract; apprise the contracting officer and, if designated by the agency, the cognizant labor relations advisor, of actual or potential labor disputes; and coordinate the removal of urgently required material from the strikebound contractor’s plant upon instruction from, and authorization of, the contracting officer.
(35) Perform traffic management services, including issuance and control of Government bills of lading and other transportation documents.
(36) Review the adequacy of the contractor’s traffic operations.
(37) Review and evaluate preservation, packaging, and packing.
(38) Ensure contractor compliance with contractual quality assurance requirements (see part 46).
(39) Ensure contractor compliance with contractual safety requirements.
(40) Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production.
(41) Evaluate for adequacy and perform surveillance of contractor engineering efforts and management systems that relate to design, development, production, engineering changes, subcontractors, tests, management of engineering resources, reliability and maintainability, data control systems, configuration management, and independent research and development.
(42) Review and evaluate for technical adequacy, the contractor’s logistics support, maintenance, and modification programs.
(43) Report to the contracting office any inadequacies noted in specifications.
(44) Perform engineering analyses of contractor cost proposals.
(45) Review and analyze contractor-proposed engineering and design studies and submit comments and recommendations to the contracting office, as required.
(46) Review engineering change proposals for proper classification, and when required, for need, technical adequacy of design, producibility, and impact on quality, reliability, schedule, and cost; submit comments to the contracting office.
(47) Assist in evaluating and make recommendations for acceptance or rejection of waivers and deviations.
(48) Evaluate and monitor the contractor’s procedures for complying with procedures regarding restrictive markings on data.
(49) Monitor the contractor’s value engineering program.
(50) Review, approve or disapprove, and maintain surveillance of the contractor’s purchasing system (see part 44).
(51) Consent to the placement of subcontracts (see part 44).
(52) Review, evaluate, and approve plant or division-wide small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business master subcontracting plans.
(53) Obtain the contractor’s currently approved company- or division-wide plans for small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting for its commercial products. If there is no currently approved plan, assist the contracting officer in evaluating the plans for those products.
(54) Assist the contracting officer, upon request, in evaluating an offeror’s proposed small, small disadvantaged women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans, including documentation of compliance with similar plans under prior contracts.
(55) By periodic surveillance, ensure the contractor’s compliance with small, small disadvantaged, women-owned, veteran-owned, HUBZone, and service-disabled veteran-owned small business subcontracting plans and any labor surplus area contractual requirements; maintain documentation of the contractor’s performance under and compliance with these plans and requirements; and provide advice and assistance to the firms involved, as appropriate.
(56) Maintain surveillance of flight operations.
(57) Assign and perform supporting contract administration.
(58) Ensure timely submission of required reports.
(59) Issue administrative changes, correcting errors or omissions in typing, contractor address, facility or activity code, remittance address, computations which do not require additional contract funds, and other such changes (see part 43).
(60) Administer and release shipments from the contractor’s plants according to the shipping instructions. When applicable, the order of assigned priority must be followed; shipments within the same priority will be determined by date of the instruction.
(61) Obtain contractor proposals for any contract price adjustments resulting from amended shipping instructions. Review all amended shipping instructions on a periodic, consolidated basis to ensure that adjustments are timely. Except when the ACO has settlement authority, the ACO will forward the proposal to the contracting officer for contract modification. The ACO will not delay shipments pending completion and formalization of negotiations of revised shipping instructions.
(62) Negotiate and/or execute supplemental agreements making changes in packaging subcontractors or contract shipping points.
(63) Cancel unilateral purchase orders when rejected by the contractor. The CAO must notify the contracting officer when the purchase order is canceled.
(64) Negotiate and execute one-time supplemental agreements providing for the extension of contract delivery schedules up to 90 days on contracts with an assigned Criticality Designator of C (see 42.804). The CAO must provide notification that the contract delivery schedule is being extended to the contracting office. Subsequent extensions on any individual contract must have concurrence of the contracting office.
(65) Perform administrative closeout procedures (see part 4).
(66) Determine that the contractor has a drug-free workplace program and drug-free awareness program (see part 26).
(67) Support the program, product, and project offices for program reviews, program status, program performance and actual or anticipated program problems.
(68) Monitor the contractor’s environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract. ACO responsibilities include-
(i) Requesting environmental technical assistance, if needed;
(ii) Monitoring contractor compliance with specifications or other contractual requirements requiring the delivery, use, or furnishing of sustainable products in accordance with the clause at 52.223-23. This occurs as part of the quality assurance procedures set forth in part 46; and
(iii) As required in the contract, ensuring that the contractor complies with the reporting requirements relating to recovered material content (see 52.223-9) and biobased products (see 52.223-2) utilized in contract performance.
(69) Administer commercial financing provisions and monitor contractor security to ensure its continued adequacy to cover outstanding payments, when on-site review is required (see part 32).
(70) Deobligate excess funds after final price determination.
(71) Ensure that the contractor has implemented the requirements of 52.203-13, Contractor Code of Business Ethics and Conduct.
(b) The CAO may perform the following functions only when and to the extent specifically authorized by the contracting office:
(1) Negotiate and execute supplementals agreements incorporating contractor proposals resulting from change orders issued under the Changes clause. Before completing negotiations, coordinate any delivery schedule change with the contracting office.
(2) Negotiate prices and execute priced exhibits for unpriced orders issued by the contracting officer under basic ordering agreements.
(3) Negotiate and execute supplementals agreements changing contract delivery schedules.
(4) Negotiate and execute supplemental agreements providing for the deobligation of unexpended dollar balances considered excess to known contract requirements.
(5) Issue amended shipping instructions and, when necessary, negotiate and execute resultant supplemental agreements incorporating contractor proposals.
(6) Negotiate changes to interim billing prices.
(7) Negotiate and definitize adjustments to contract prices resulting from exercise of an economic price adjustment clause (see part 16).
(8) Issue change orders and negotiate and execute resulting supplemental agreements under contracts for ship construction, conversion, and repair.
(9) Execute supplementals agreements on firm-fixed-price supply contracts to reduce required line item quantities and deobligate excess funds when notified by the contractor of an inconsequential delivery shortage, but only when the action is—
(i) Determined to be in the best interests of the Government;
(ii) Supported by a written request of the contractor; and
(iii) A total downward contract price adjustment resulting from an inconsequential delivery shortage. This action must not exceed $250.00 or 5 percent of the contract price, whichever is less.
(10) Execute supplementals agreements to permit a change in place of inspection at origin specified in firm-fixed-price supply contracts awarded to nonmanufacturers, as deemed necessary to protect the Government’s interests.
(11) Prepare evaluations of contractor performance in accordance with subpart 42.11.
(c) Any additional contract administration functions not listed in 42.302(a) and (b), or not otherwise delegated, remain the responsibility of the contracting office unless in accordance with 42.202 Assignment of contract administration(c).
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 42.000 | Scope of part. | Scope of part. | Same | 16 → 16 |
| 42.001 | [Reserved] | Interagency agreements. | Changed · 0% alike | 0 → 57 |
| 42.002 | Interagency agreements. | Cognizant Federal agency. | Changed · 11% alike | 85 → 117 |
| 42.003 | Cognizant Federal agency. | none | Not in the overhaul | 174 → – |
| 42.101 | Contract audit responsibilities. | Contract audit responsibilities. | Changed · 89% alike | 203 → 178 |
| 42.102 | Assignment of contract audit services. | Assignment of contract audit services. | Changed · 76% alike | 81 → 63 |
| 42.103 | Contract audit services directory. | Contract audit services directory. | Changed · 69% alike | 80 → 68 |
| 42.201 | Contract administration responsibilities. | Contract administration responsibilities. | Changed · 78% alike | 94 → 68 |
| 42.202 | Assignment of contract administration. | Assignment of contract administration. | Changed · 89% alike | 581 → 542 |
| 42.203 | Contract administration services directory. | Contract administration services directory. | Changed · 70% alike | 76 → 52 |
| 42.301 | General. | General. | Changed · 94% alike | 48 → 48 |
| 42.302 | Contract administration functions. | Contract administration functions. | Changed · 91% alike | 2160 → 2091 |
| 42.401 | Contract correspondence. | General. | Changed · 12% alike | 79 → 68 |
| 42.402 | Visits to contractors' facilities. | Assignment and location. | Changed · 4% alike | 287 → 156 |
| 42.403 | Evaluation of contract administration offices. | Responsibilities. | Changed · 8% alike | 35 → 123 |
| 42.500 | Scope of subpart. | Scope of subpart. | Changed · 40% alike | 28 → 17 |
| 42.501 | General. | Definition. | Changed · 4% alike | 185 → 34 |
| 42.502 | Selecting contracts for postaward orientation. | Purpose. | Changed · 4% alike | 176 → 71 |
| 42.503 | Postaward conferences. | General. | Same | 0 → 0 |
| 42.503-1 | Postaward conference arrangements. | Policy. | Changed · 9% alike | 91 → 203 |
| 42.503-2 | Postaward conference procedure. | Certificate of indirect costs. | Changed · 8% alike | 132 → 396 |
| 42.503-3 | Postaward conference report. | none | Not in the overhaul | 66 → – |
| 42.504 | Postaward letters. | Billing rates. | Changed · 8% alike | 58 → 349 |
| 42.505 | Postaward subcontractor conferences. | Final indirect cost rates. | Changed · 10% alike | 127 → 197 |
| 42.505-1 | none | Contracting officer determination procedure. | New number Same heading as today's 42.705-1 | – → 888 |
| 42.505-2 | none | Auditor determination procedure. | New number Same heading as today's 42.705-2 | – → 327 |
| 42.505-3 | none | Educational institutions. | New number Same heading as today's 42.705-3 | – → 643 |
| 42.505-4 | none | State and local governments. | New number Same heading as today's 42.705-4 | – → 74 |
| 42.505-5 | none | Nonprofit organizations other than educational institutions and state and local governments. | New number | – → 49 |
| 42.506 | none | Cost-sharing rates and limitations on indirect cost rates. | New number Same heading as today's 42.707 | – → 184 |
| 42.507 | none | Quick-closeout procedure. | New number Same heading as today's 42.708 | – → 313 |
| 42.508 | none | Penalties for Unallowable Costs. | New number Same heading as today's 42.709 | – → 0 |
| 42.508-1 | none | Scope. | New number | – → 84 |
| 42.508-2 | none | General. | New number | – → 147 |
| 42.508-3 | none | Responsibilities. | New number | – → 107 |
| 42.508-4 | none | Assessing the penalty. | New number Same heading as today's 42.709-4 | – → 234 |
| 42.508-5 | none | Computing Interest. | New number Same heading as today's 42.709-5 | – → 108 |
| 42.508-6 | none | Waiver of the penalty. | New number Same heading as today's 42.709-6 | – → 150 |
| 42.508-7 | none | Contract clause. | New number Same heading as today's 42.709-7 | – → 72 |
| 42.600 | none | Scope of subpart. | New number | – → 26 |
| 42.601 | General. | Notice of intent to disallow costs. | Changed · 5% alike | 74 → 407 |
| 42.602 | Assignment and location. | Contract clause. | Changed · 4% alike | 295 → 39 |
| 42.603 | Responsibilities. | Disallowing costs after incurrence. | Changed · 5% alike | 123 → 220 |
| 42.700 | Scope of subpart. | Scope of subpart. | Changed · 27% alike | 17 → 49 |
| 42.701 | Definition. | General. | Changed · 7% alike | 34 → 24 |
| 42.702 | Purpose. | Procedures. | Changed · 4% alike | 71 → 117 |
| 42.703 | General. | Solicitation provision and contract clause. | Changed · 0% alike | 0 → 21 |
| 42.703-1 | Policy. | none | Not in the overhaul | 234 → – |
| 42.703-2 | Certificate of indirect costs. | none | Not in the overhaul | 406 → – |
| 42.704 | Billing rates. | none | Not in the overhaul | 369 → – |
| 42.705 | Final indirect cost rates. | none | Not in the overhaul | 200 → – |
| 42.705-1 | Contracting officer determination procedure. | none | Not in the overhaul Same heading at 42.505-1 | 846 → – |
| 42.705-2 | Auditor determination procedure. | none | Not in the overhaul Same heading at 42.505-2 | 299 → – |
| 42.705-3 | Educational institutions. | none | Not in the overhaul Same heading at 42.505-3 | 779 → – |
| 42.705-4 | State and local governments. | none | Not in the overhaul Same heading at 42.505-4 | 85 → – |
| 42.705-5 | Nonprofit organizations other than educational and state and local governments. | none | Not in the overhaul | 27 → – |
| 42.706 | Distribution of documents. | none | Not in the overhaul | 81 → – |
| 42.707 | Cost-sharing rates and limitations on indirect cost rates. | none | Not in the overhaul Same heading at 42.506 | 257 → – |
| 42.708 | Quick-closeout procedure. | none | Not in the overhaul Same heading at 42.507 | 330 → – |
| 42.709 | Penalties for Unallowable Costs. | none | Not in the overhaul Same heading at 42.508 | 0 → – |
| 42.709-1 | Scope. | none | Not in the overhaul | 84 → – |
| 42.709-2 | General. | none | Not in the overhaul | 152 → – |
| 42.709-3 | Responsibilities. | none | Not in the overhaul | 146 → – |
| 42.709-4 | Assessing the penalty. | none | Not in the overhaul Same heading at 42.508-4 | 226 → – |
| 42.709-5 | Computing interest. | none | Not in the overhaul Same heading at 42.508-5 | 113 → – |
| 42.709-6 | Waiver of the penalty. | none | Not in the overhaul Same heading at 42.508-6 | 247 → – |
| 42.709-7 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 72 → – |
| 42.800 | Scope of subpart. | none | Not in the overhaul | 26 → – |
| 42.801 | Notice of intent to disallow costs. | General. | Changed · 5% alike | 386 → 47 |
| 42.802 | Contract clause. | Applicability. | Changed · 7% alike | 39 → 15 |
| 42.803 | Disallowing costs after incurrence. | Surveillance requirements. | Changed · 7% alike | 291 → 170 |
| 42.804 | none | Assignment of criticality designator. | New number Same heading as today's 42.1105 | – → 103 |
| 42.805 | none | Contract clause. | New number Same heading as today's 42.709-7 | – → 48 |
| 42.900 | Scope of subpart. | Scope of subpart. | Changed · 24% alike | 54 → 48 |
| 42.901 | General. | Responsibility for executing agreements. | Changed · 5% alike | 29 → 167 |
| 42.902 | Procedures. | Processing agreements. | Changed · 10% alike | 117 → 508 |
| 42.903 | Solicitation provision and contract clause. | Applicability of novation agreements. | Changed · 1% alike | 21 → 1986 |
| 42.904 | none | Agreement to recognize contractor’s change of name. | New number Same heading as today's 42.1205 | – → 555 |
| 42.1001 | none | General. | New number | – → 22 |
| 42.1002 | none | Suspension of work. | New number Same heading as today's 42.1302 | – → 45 |
| 42.1003 | none | Stop-work orders. | New number Same heading as today's 42.1303 | – → 291 |
| 42.1004 | none | Government delay of work. | New number Same heading as today's 42.1304 | – → 176 |
| 42.1005 | none | Contract clauses. | New number Same heading as today's 42.1305 | – → 151 |
| 42.1100 | none | Scope of subpart. | New number | – → 14 |
| 42.1101 | General. | General. | Changed · 5% alike | 48 → 224 |
| 42.1102 | Applicability. | Policy. | Changed · 2% alike | 31 → 703 |
| 42.1103 | Policy. | Procedures. | Changed · 1% alike | 43 → 2682 |
| 42.1104 | Surveillance requirements. | Contract clause. | Changed · 3% alike | 170 → 26 |
| 42.1105 | Assignment of criticality designator. | none | Not in the overhaul Same heading at 42.804 | 21 → – |
| 42.1106 | Reporting requirements. | none | Not in the overhaul | 167 → – |
| 42.1107 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 60 → – |
| 42.1200 | Scope of subpart. | none | Not in the overhaul | 48 → – |
| 42.1201 | [Reserved] | General. | Changed · 0% alike | 0 → 93 |
| 42.1202 | Responsibility for executing agreements. | none | Not in the overhaul | 165 → – |
| 42.1203 | Processing agreements. | none | Not in the overhaul | 504 → – |
| 42.1204 | Applicability of novation agreements. | none | Not in the overhaul | 1987 → – |
| 42.1205 | Agreement to recognize contractor's change of name. | none | Not in the overhaul Same heading at 42.904 | 550 → – |
| 42.1301 | General. | Procedures. | Changed · 5% alike | 48 → 349 |
| 42.1302 | Suspension of work. | none | Not in the overhaul Same heading at 42.1002 | 45 → – |
| 42.1303 | Stop-work orders. | none | Not in the overhaul Same heading at 42.1003 | 291 → – |
| 42.1304 | Government delay of work. | none | Not in the overhaul Same heading at 42.1004 | 176 → – |
| 42.1305 | Contract clauses. | none | Not in the overhaul Same heading at 42.1005 | 137 → – |
| 42.1500 | Scope of subpart. | none | Not in the overhaul | 66 → – |
| 42.1501 | General. | none | Not in the overhaul | 222 → – |
| 42.1502 | Policy. | none | Not in the overhaul | 699 → – |
| 42.1503 | Procedures. | none | Not in the overhaul | 1371 → – |
| 42.1504 | Contract clause. | none | Not in the overhaul Same heading at 42.508-7 | 26 → – |
| 42.1601 | General. | none | Not in the overhaul | 95 → – |
| 42.1701 | Procedures. | none | Not in the overhaul | 362 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.