The FAR overhaul, side by side

FAR Part 6: Competition Requirements

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 34 sections, 6,960 words (Part 6 as in force, eCFR as of Oct 29, 2026). Overhaul text: 21 sections, 3,330 words (on acquisition.gov ↗, issued Jun 27, 2025). By number: 0 the same, 7 changed, 27 not in the overhaul (10 with the same heading under another number), 14 new.

6.305: Not in the overhaul

Today: Availability of the justification.

This section in plain English

(a) The agency shall make publicly available the justification required by 6.303-1 as required by 10 U.S.C. 3204(f) and 41 U.S.C. 3304(f). Except for the circumstances in paragraphs (b) and (c) of this section, the justification shall be made publicly available within 14 days after contract award.

(b) In the case of a contract award permitted under 6.302-2, the justification shall be posted within 30 days after contract award.

(c) In the case of a brand name justification under 6.302-1(c), the justification shall be posted with the solicitation (see 5.102(a)(6)).

(d) The justifications shall be made publicly available—

(1) At the Government Point of Entry (GPE) https://www.sam.gov;

(2) On the website of the agency, which may provide access to the justifications by linking to the GPE; and

(3) Must remain posted for a minimum of 30 days.

(e) Contracting officers shall carefully screen all justifications for contractor proprietary data and remove all such data, and such references and citations as are necessary to protect the proprietary data, before making the justifications available for public inspection. Contracting officers shall also be guided by the exemptions to disclosure of information contained in the Freedom of Information Act (5 U.S.C. 552) and the prohibitions against disclosure in 24.202 in determining whether the justification, or portions of it, are exempt from posting. Although the submitter notice process set out in EO 12600, entitled “Predisclosure Notification Procedures for Confidential Commercial Information,” does not apply, if the justification appears to contain proprietary data, the contracting officer should provide the contractor that submitted the information an opportunity to review the justification for proprietary data, before making the justification available for public inspection, redacted as necessary. This process must not prevent or delay the posting of the justification in accordance with the timeframes required in paragraphs (a) through (c).

(f) The requirements of paragraphs (a) through (d) do not apply if posting the justification would disclose the executive agency's needs and disclosure of such needs would compromise national security or create other security risks.

Overhaul text

No section with this number.

Section by section

SectionTodayOverhaul textStatusWords
6.000Scope of part.Scope of part.Changed · 29% alike66 → 11
6.001Applicability.Applicability.Changed · 86% alike178 → 155
6.002Limitations.Limitations.Changed · 77% alike21 → 18
6.003[Reserved]Advocates for competition.Changed · 0% alike0 → 68
6.100Scope of subpart.noneNot in the overhaul21 → –
6.101Policy.Full and open competition.Changed · 11% alike89 → 265
6.102Use of competitive procedures.Full and open competition after excluding sources.Changed · 11% alike239 → 65
6.102-1noneEstablishing or maintaining alternative sources.New number
Same heading as today's 6.202
– → 270
6.102-2noneSet-asides for small business concerns.New number
Same heading as today's 6.203
– → 47
6.102-3noneSet-asides for local firms during a major disaster or emergency.New number
Same heading as today's 6.208
– → 29
6.103noneOther than full and open competition.New number– → 134
6.103-1noneOnly one responsible source and no other supplies or services will satisfy agency requirements.New number
Same heading as today's 6.302-1
– → 295
6.103-2noneUnusual and compelling urgency.New number
Same heading as today's 6.302-2
– → 271
6.103-3noneIndustrial mobilization; engineering, developmental, or research capability; or expert services.New number
Same heading as today's 6.302-3
– → 121
6.103-4noneInternational agreement.New number
Same heading as today's 6.302-4
– → 103
6.103-5noneAuthorized or required by statute.New number
Same heading as today's 6.302-5
– → 381
6.103-6noneNational security.New number
Same heading as today's 6.302-6
– → 54
6.103-7nonePublic interest.New number
Same heading as today's 6.302-7
– → 104
6.104noneJustification and approval.New number– → 88
6.104-1noneJustification content.New number– → 386
6.104-2noneApproval of justification.New number– → 241
6.200Scope of subpart.noneNot in the overhaul19 → –
6.201Policy.noneNot in the overhaul14 → –
6.202Establishing or maintaining alternative sources.noneNot in the overhaul
Same heading at 6.102-1
267 → –
6.203Set-asides for small business concerns.noneNot in the overhaul
Same heading at 6.102-2
82 → –
6.204Section 8(a) competition.noneNot in the overhaul73 → –
6.205Set-asides for HUBZone small business concerns.noneNot in the overhaul59 → –
6.206Set-asides for service-disabled veteran-owned small business (SDVOSB) concerns eligible under the SDVOSB Program.noneNot in the overhaul75 → –
6.207Set-asides for economically disadvantaged women-owned small business (EDWOSB) concerns or women-owned small business (WOSB) concerns eligible under the WOSB Program.noneNot in the overhaul63 → –
6.208Set-asides for local firms during a major disaster or emergency.noneNot in the overhaul
Same heading at 6.102-3
101 → –
6.300Scope of subpart.noneNot in the overhaul20 → –
6.301Policy.Availability of the justification.Changed · 11% alike227 → 224
6.302Circumstances permitting other than full and open competition.noneNot in the overhaul30 → –
6.302-1Only one responsible source and no other supplies or services will satisfy agency requirements.noneNot in the overhaul
Same heading at 6.103-1
907 → –
6.302-2Unusual and compelling urgency.noneNot in the overhaul
Same heading at 6.103-2
428 → –
6.302-3Industrial mobilization; engineering, developmental, or research capability; or expert services.noneNot in the overhaul
Same heading at 6.103-3
629 → –
6.302-4International agreement.noneNot in the overhaul
Same heading at 6.103-4
191 → –
6.302-5Authorized or required by statute.noneNot in the overhaul
Same heading at 6.103-5
542 → –
6.302-6National security.noneNot in the overhaul
Same heading at 6.103-6
165 → –
6.302-7Public interest.noneNot in the overhaul
Same heading at 6.103-7
195 → –
6.303Justifications.noneNot in the overhaul0 → –
6.303-1Requirements.noneNot in the overhaul297 → –
6.303-2Content.noneNot in the overhaul575 → –
6.304Approval of the justification.noneNot in the overhaul336 → –
6.305Availability of the justification.noneNot in the overhaul349 → –
6.401Sealed bidding and competitive proposals.noneNot in the overhaul187 → –
6.501Requirement.noneNot in the overhaul99 → –
6.502Duties and responsibilities.noneNot in the overhaul416 → –