The FAR overhaul, side by side
FAR Part 14: Sealed Bidding
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 82 sections, 14,667 words (Part 14 as in force, eCFR as of Oct 29, 2026). Overhaul text: 45 sections, 10,714 words (on acquisition.gov ↗, issued Sep 25, 2025). By number: 2 the same, 21 changed, 59 not in the overhaul (15 with the same heading under another number), 22 new.
14.211-3: New number
Today
No section with this number.
Overhaul text: Procedures.
(a) Step one .
(1) Synopsize requests for technical proposals in accordance with Part 5. The request must include, as a minimum, the following:
(i) A description of the supplies or services required.
(ii) A statement of intent to use the two-step method.
(iii) The requirements of the technical proposal.
(iv) The evaluation criteria, to include all factors and any significant subfactors.
(v) A statement that the technical proposals must not include prices or pricing information.
(vi) The date, or date and hour, by which the technical proposal must be received (see 14.210).
(vii) A statement that, in the second step—
(A) The contracting officer will consider awards based upon bids that have acceptable technical proposals, either initially or as a result of discussions; and
(B) Each technical proposal must be based on the bidder's own technical proposals.
(viii) A statement that—
(A) Bidders should submit technical proposals that are acceptable without additional explanation or information;
(B) The Government may make a final determination regarding a technical proposal's acceptability solely on the basis as submitted; and
(C) The Government may proceed with the second step without requesting further information from any bidder; however, the Government may request additional information from bidders of bids that it considers reasonably susceptible of being made acceptable and may discuss bids with their bidders.
(ix) A statement that a notice of unacceptability will be forwarded to the bidder upon completion of the technical proposal evaluation and final determination of unacceptability.
(x) A statement either that each bidder may only submit one technical proposal or, if authorized, multiple technical proposals. When specifications permit different technical approaches, it is generally in the Government's interest to authorize multiple technical proposals. If multiple technical proposals are authorized, see 14.207(n).
(2) Include information on delivery or performance requirements that may assist bidders in determining whether or not to submit a technical proposal. Indicate that the information is not binding on the Government and that the invitation issued under step two will include actual delivery or performance requirements.
(3) Upon receipt, the contracting officer must—
(i) Safeguard technical proposals against disclosure to unauthorized persons;
(ii) Accept and handle data marked in accordance with part 15 and 27; and
(iii) Remove any reference to price or cost.
(4) The contracting officer must establish a time period for evaluating technical proposals. The period may vary with the complexity and number of technical proposals involved. However, the evaluation should be completed quickly.
(5)
(i) Base evaluations on the criteria in the request for proposals but not consideration of responsibility as defined in part 9. Categorize technical proposals as—
(A) Acceptable;
(B) Reasonably susceptible of being made acceptable; or
(C) Unacceptable.
(ii) Categorize any proposal that modifies, or fails to conform to the essential requirements or specifications of, the request for technical proposals as unacceptable.
(6)
(i) The contracting officer may proceed directly with step two if there are sufficient acceptable proposals to ensure adequate price competition under step two, and if further time, effort and delay to make additional technical proposals acceptable and thereby increase competition would not be in Government's interest. If this is not the case, the contracting officer must request bidders whose technical proposals may be made acceptable to submit additional clarifying or supplementing information. The contracting officer must identify the nature of the deficiencies in the technical proposal or the nature of the additional information required. The contracting officer may also arrange discussions for this purpose. Do not discuss a technical proposal with any bidder other than the submitter.
(ii) When requesting additional information, the contracting officer must establish an appropriate time for bidders to conclude discussions, if any, submit all additional information, and incorporate such additional information as part of their technical proposals. The contracting officer may extend the due date for such submissions at their discretion. If the additional information is incorporated into a technical proposal within the established time, and the contracting officer determines that the technical proposal is acceptable, the contracting officer will update its category to acceptable.
(7) When a technical proposal is found unacceptable (either initially or after clarification), the contracting officer must promptly notify the bidder of the basis of the determination and that a revision of the technical proposal will not be considered. Upon written request, the contracting officer must debrief unsuccessful bidders (see part 15).
(8) Late technical proposals are governed by part 15.
(9) If it is necessary to discontinue two-step sealed bidding, the contracting officer must include a statement of the facts and circumstances in the contract file. The contracting officer must notify each bidder in writing. When step one results in no acceptable technical proposals or only one acceptable technical proposal, the acquisition may be continued by negotiation.
(b) Step two.
(1) Follow sealed bidding procedures except that invitations for bids in step two must—
(i) Be issued only to those bidders that submitted acceptable technical proposals in step one;
(ii) Include the provision prescribed in 14.207(o);
(iii) Clearly state that the bidder must comply with the specifications and the bidder's technical proposal; and
(iv) Not be synopsized through the Governmentwide point of entry (GPE) as an acquisition opportunity nor publicly posted.
(2) List the names of firms that submitted acceptable proposals in step one through the GPE for the benefit of prospective subcontractors (see 5.201).
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 14.000 | Scope of part. | Scope of part. | Changed · 96% alike | 55 → 53 |
| 14.101 | Elements of sealed bidding. | none | Not in the overhaul | 205 → – |
| 14.102 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.103 | Policy. | none | Not in the overhaul | 0 → – |
| 14.103-1 | General. | none | Not in the overhaul | 61 → – |
| 14.103-2 | Limitations. | none | Not in the overhaul | 93 → – |
| 14.104 | Types of contracts. | none | Not in the overhaul | 52 → – |
| 14.105 | Solicitations for informational or planning purposes. | none | Not in the overhaul | 4 → – |
| 14.201 | Preparation of invitations for bids. | Preparation of invitations for bids. | Same | 0 → 0 |
| 14.201-1 | Uniform contract format. | Format. | Changed · 31% alike | 313 → 335 |
| 14.201-2 | Part I—The Schedule. | none | Not in the overhaul | 409 → – |
| 14.201-3 | Part II—Contract clauses. | none | Not in the overhaul | 50 → – |
| 14.201-4 | Part III—Documents, exhibits, and other attachments. | none | Not in the overhaul | 25 → – |
| 14.201-5 | Part IV—Representations and instructions. | none | Not in the overhaul | 128 → – |
| 14.201-6 | Solicitation provisions. | none | Not in the overhaul | 776 → – |
| 14.201-7 | Contract clauses. | none | Not in the overhaul | 486 → – |
| 14.201-8 | Price-related factors. | none | Not in the overhaul | 227 → – |
| 14.201-9 | Simplified contract format. | none | Not in the overhaul | 319 → – |
| 14.202 | General rules for solicitation of bids. | Uniform contract format. | Same | 0 → 0 |
| 14.202-1 | Bidding time. | Part I Schedule. | Changed · 11% alike | 164 → 267 |
| 14.202-2 | [Reserved] | Part II Contract clauses. | Changed · 0% alike | 0 → 8 |
| 14.202-3 | Bid envelopes. | Part III Documents, exhibits, and other attachments. | Changed · 8% alike | 61 → 13 |
| 14.202-4 | Bid samples. | Part IV Representations and instructions. | Changed · 3% alike | 611 → 64 |
| 14.202-5 | Descriptive literature. | none | Not in the overhaul | 360 → – |
| 14.202-6 | Final review of invitations for bids. | none | Not in the overhaul | 36 → – |
| 14.202-7 | Facsimile bids. | none | Not in the overhaul | 118 → – |
| 14.202-8 | Electronic bids. | none | Not in the overhaul | 35 → – |
| 14.203 | Methods of soliciting bids. | Requirements. | Changed · 0% alike | 0 → 87 |
| 14.203-1 | Transmittal to prospective bidders. | none | Not in the overhaul | 49 → – |
| 14.203-2 | Dissemination of information concerning invitations for bids. | none | Not in the overhaul | 37 → – |
| 14.203-3 | Master solicitation. | none | Not in the overhaul | 63 → – |
| 14.204 | Records of invitations for bids and records of bids. | Economic purchase quantities (supplies). | Changed · 12% alike | 94 → 42 |
| 14.205 | Presolicitation notices. | Bid samples. | Changed · 7% alike | 113 → 399 |
| 14.206 | [Reserved] | Descriptive literature. | Changed · 0% alike | 0 → 341 |
| 14.207 | Pre-bid conference. | Solicitation Provisions. | Changed · 2% alike | 71 → 731 |
| 14.208 | Amendment of invitation for bids. | Contract clauses. | Changed · 9% alike | 218 → 285 |
| 14.209 | Cancellation of invitations before opening. | Soliciting bids. | Changed · 28% alike | 215 → 555 |
| 14.210 | Qualified products. | Submission of Bids. | Changed · 6% alike | 3 → 60 |
| 14.211 | Release of acquisition information. | Two-step sealed bidding. | Changed · 0% alike | 218 → 0 |
| 14.211-1 | none | General. | New number | – → 212 |
| 14.211-2 | none | Conditions for use. | New number Same heading as today's 14.502 | – → 247 |
| 14.211-3 | none | Procedures. | New number Same heading as today's 14.503 | – → 901 |
| 14.212 | Economic purchase quantities (supplies). | none | Not in the overhaul | 42 → – |
| 14.213-14.214 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.301 | Responsiveness of bids. | Submission, modification, or withdrawal of bids. | Changed · 11% alike | 156 → 664 |
| 14.302 | Bid submission. | Receipt of an unreadable electronic bid. | Changed · 14% alike | 30 → 85 |
| 14.303 | Modification or withdrawal of bids. | Bid opening. | Changed · 10% alike | 209 → 487 |
| 14.304 | Submission, modification, and withdrawal of bids. | Mistakes in bids. | Changed · 0% alike | 633 → 0 |
| 14.304-1 | none | General. | New number | – → 107 |
| 14.304-2 | none | Apparent clerical mistakes. | New number Same heading as today's 14.407-2 | – → 79 |
| 14.304-3 | none | Other mistakes disclosed before award. | New number Same heading as today's 14.407-3 | – → 1077 |
| 14.305 | none | Cancellation of invitations after opening. | New number Same heading as today's 14.404-1 | – → 512 |
| 14.306 | none | Evaluation. | New number | – → 0 |
| 14.306-1 | none | Responsiveness of bids. | New number | – → 143 |
| 14.306-2 | none | Responsible bidder—reasonableness of price. | New number Same heading as today's 14.408-2 | – → 84 |
| 14.306-3 | none | Rejection of individual bids. | New number Same heading as today's 14.404-2 | – → 559 |
| 14.306-4 | none | Rejection of all bids. | New number | – → 29 |
| 14.306-5 | none | Restrictions on disclosure of descriptive literature. | New number Same heading as today's 14.404-4 | – → 96 |
| 14.306-6 | none | All or none qualifications. | New number Same heading as today's 14.404-5 | – → 59 |
| 14.306-7 | none | Minor informalities or irregularities in bids. | New number Same heading as today's 14.405 | – → 357 |
| 14.306-8 | none | Prompt payment discounts. | New number Same heading as today's 14.408-3 | – → 12 |
| 14.306-9 | none | Economic price adjustment. | New number Same heading as today's 14.408-4 | – → 300 |
| 14.307 | none | Award. | New number | – → 389 |
| 14.308 | none | Award of equal low bids. | New number | – → 167 |
| 14.309 | none | Information to bidders. | New number Same heading as today's 14.409 | – → 0 |
| 14.309-1 | none | Award of unclassified contracts. | New number Same heading as today's 14.409-1 | – → 149 |
| 14.309-2 | none | Award of classified contracts. | New number Same heading as today's 14.409-2 | – → 71 |
| 14.400 | Scope of subpart. | none | Not in the overhaul | 22 → – |
| 14.401 | Receipt and safeguarding of bids. | Mistakes after award. | Changed · 12% alike | 246 → 677 |
| 14.402 | Opening of bids. | Pricing modifications. | Changed · 0% alike | 0 → 11 |
| 14.402-1 | Unclassified bids. | none | Not in the overhaul | 192 → – |
| 14.402-2 | Classified bids. | none | Not in the overhaul | 69 → – |
| 14.402-3 | Postponement of openings. | none | Not in the overhaul | 269 → – |
| 14.403 | Recording of bids. | none | Not in the overhaul | 227 → – |
| 14.404 | Rejection of bids. | none | Not in the overhaul | 0 → – |
| 14.404-1 | Cancellation of invitations after opening. | none | Not in the overhaul Same heading at 14.305 | 689 → – |
| 14.404-2 | Rejection of individual bids. | none | Not in the overhaul Same heading at 14.306-3 | 586 → – |
| 14.404-3 | Notice to bidders of rejection of all bids. | none | Not in the overhaul | 30 → – |
| 14.404-4 | Restrictions on disclosure of descriptive literature. | none | Not in the overhaul Same heading at 14.306-5 | 105 → – |
| 14.404-5 | All or none qualifications. | none | Not in the overhaul Same heading at 14.306-6 | 58 → – |
| 14.405 | Minor informalities or irregularities in bids. | none | Not in the overhaul Same heading at 14.306-7 | 363 → – |
| 14.406 | Receipt of an unreadable electronic bid. | none | Not in the overhaul | 85 → – |
| 14.407 | Mistakes in bids. | none | Not in the overhaul | 0 → – |
| 14.407-1 | General. | none | Not in the overhaul | 79 → – |
| 14.407-2 | Apparent clerical mistakes. | none | Not in the overhaul Same heading at 14.304-2 | 160 → – |
| 14.407-3 | Other mistakes disclosed before award. | none | Not in the overhaul Same heading at 14.304-3 | 1147 → – |
| 14.407-4 | Mistakes after award. | none | Not in the overhaul | 687 → – |
| 14.408 | Award. | none | Not in the overhaul | 0 → – |
| 14.408-1 | General. | none | Not in the overhaul | 414 → – |
| 14.408-2 | Responsible bidder—reasonableness of price. | none | Not in the overhaul Same heading at 14.306-2 | 84 → – |
| 14.408-3 | Prompt payment discounts. | none | Not in the overhaul Same heading at 14.306-8 | 82 → – |
| 14.408-4 | Economic price adjustment. | none | Not in the overhaul Same heading at 14.306-9 | 304 → – |
| 14.408-5 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.408-6 | Equal low bids. | none | Not in the overhaul | 175 → – |
| 14.408-7 | Documentation of award. | none | Not in the overhaul | 67 → – |
| 14.408-8 | Protests against award. | none | Not in the overhaul | 4 → – |
| 14.409 | Information to bidders. | none | Not in the overhaul Same heading at 14.309 | 0 → – |
| 14.409-1 | Award of unclassified contracts. | none | Not in the overhaul Same heading at 14.309-1 | 325 → – |
| 14.409-2 | Award of classified contracts. | none | Not in the overhaul Same heading at 14.309-2 | 70 → – |
| 14.501 | General. | none | Not in the overhaul | 213 → – |
| 14.502 | Conditions for use. | none | Not in the overhaul Same heading at 14.211-2 | 245 → – |
| 14.503 | Procedures. | none | Not in the overhaul Same heading at 14.211-3 | 0 → – |
| 14.503-1 | Step one. | none | Not in the overhaul | 828 → – |
| 14.503-2 | Step two. | none | Not in the overhaul | 103 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress