The FAR overhaul, side by side
FAR Part 14: Sealed Bidding
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 82 sections, 14,667 words (Part 14 as in force, eCFR as of Oct 29, 2026). Overhaul text: 45 sections, 10,714 words (on acquisition.gov ↗, issued Sep 25, 2025). By number: 2 the same, 21 changed, 59 not in the overhaul (15 with the same heading under another number), 22 new.
14.304-3: New number
Today
No section with this number.
Overhaul text: Other mistakes disclosed before award.
(a) A bidder may request in writing permission from the contracting officer to correct a mistake after providing clear and convincing evidence that establishes both the existence of the mistake, and the bid actually intended.
(1) If the contracting officer accepts the clear and convincing evidence and the correction does not cause the bidder to outbid other lower bids, the contracting officer may allow the correction.
(2) If the correction causes the bidder to outbid one or more otherwise lower bids, the head of the agency may make a determination to permit the correction only if the mistake and intended bid are obvious from the final bid documents.
(b) If a bidder requests permission to withdraw a bid rather than correct it, the evidence is clear and convincing both as to the existence of a mistake and as to the bid actually intended, and the bid, both as uncorrected and as corrected, is the lowest received, the head of the agency may make a determination to correct the bid and not permit its withdrawal.
(c) If, under paragraph (a) or (b) of this section—
(1) The evidence of a mistake is clear and convincing only as to the mistake but not as to the intended bid, or
(2) The evidence reasonably supports the existence of a mistake but is not clear and convincing, an official above the contracting officer, unless otherwise provided by agency procedures, may make a determination permitting the bidder to withdraw the bid.
(d) If the evidence does not warrant a determination under paragraph (a), (b), or (c) above, the head of the agency may make a determination that the bid be neither withdrawn nor corrected.
(e) Heads of agencies may delegate their authority to make the determinations under paragraphs (a), (b), (c), and (d) of this section to a central authority, or a limited number of authorities as necessary, in their agencies, without power of redelegation.
(f) Before issuance of the determinations in this section, legal counsel within the respective agency must provide concurrence.
(g) Process Government suspected or alleged mistakes in bids as follows:
(1) A mere statement by the administrative officials that they are satisfied that an error was made is insufficient.
(2) The contracting officer must immediately request that the bidder verify its bid.
(i) Actions taken to verify bids must be sufficient to reasonably assure the contracting officer that the bid as confirmed is without error, or to elicit the allegation of a mistake by the bidder.
(ii) To assure that the bidder will be put on notice of a suspected mistake by the contracting officer, the bidder should be advised as appropriate—
(A) That its bid is so much lower than the other bids or the Government's estimate as to indicate a possibility of error;
(B) Of important or unusual characteristics of the specifications;
(C) Of changes in requirements from previous purchases of a similar item; or
(D) Of any other information, proper for disclosure, that leads the contracting officer to believe that there is a mistake in bid.
(3) If the bid is verified, the contracting officer must consider the bid as originally submitted.
(4) If the time for acceptance of bids is likely to expire before a decision can be made, the contracting officer must request all bidders whose bids may become eligible for award to extend the time for acceptance of their bids.
(5) If the bidder whose bid is believed erroneous does not (or cannot) grant an extension of time, the bid must be considered as originally submitted (but see paragraph (8) below).
(6) If the bidder alleges a mistake, the contracting officer must advise the bidder to make a written request to withdraw or modify the bid. The request must be supported by statements (sworn statements, if possible) and must include all pertinent evidence such as the bidder’s file copy of the bid, the original worksheets and other data used in preparing the bid, subcontractors’ quotations, if any, published price lists, and any other evidence that establishes the existence of the error, the manner in which it occurred, and the bid actually intended.
(7) When the bidder furnishes evidence supporting an alleged mistake, the contracting officer must refer the case to the appropriate authority together with the following data:
(i) A signed copy of the bid involved.
(ii) A copy of the invitation for bids and any specifications or drawings relevant to the alleged mistake.
(iii) An abstract or record of the bids received.
(iv) The bidder’s written request to withdraw or modify the bid, together with the bidder's written statement and supporting evidence.
(v) A written statement by the contracting officer providing—
(A) A description of the supplies or services involved;
(B) The expiration date of the bid in question and of the other bids submitted;
(C) Specific information as to how and when the mistake was alleged;
(D) A summary of the evidence submitted by the bidder;
(E) In the event only one bid was received, a quotation of the most recent contract price for the supplies or services involved or, in the absence of a recent comparable contract, the contracting officer's estimate of a fair price for the supplies or services;
(F) Any additional pertinent evidence; and
(G) A recommendation to consider the bid as submitted or to authorize the bidder to withdraw or modify its bid.
(8) Where the bidder fails or refuses to furnish evidence in support of a suspected or alleged mistake, the contracting officer must consider the bid as submitted unless—
(i) The amount of the bid is so far out of line with the amounts of other bids received, or with the amount estimated by the agency or determined by the contracting officer to be reasonable; or
(ii) There are other indications of error which are so clear, as to reasonably justify the conclusion that acceptance of the bid would be unfair to the bidder or to other bona fide bidders. The contracting officer must document all attempts made to obtain the information required and the action taken with respect to the correct the bid.
(h) Each agency must maintain records of all determinations made in accordance with this section, the facts involved, and the action taken in each case. Include copies of all such determinations in the file.
(i) Nothing contained in this section prevents an agency from submitting doubtful cases to the Comptroller General for advance decision.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 14.000 | Scope of part. | Scope of part. | Changed · 96% alike | 55 → 53 |
| 14.101 | Elements of sealed bidding. | none | Not in the overhaul | 205 → – |
| 14.102 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.103 | Policy. | none | Not in the overhaul | 0 → – |
| 14.103-1 | General. | none | Not in the overhaul | 61 → – |
| 14.103-2 | Limitations. | none | Not in the overhaul | 93 → – |
| 14.104 | Types of contracts. | none | Not in the overhaul | 52 → – |
| 14.105 | Solicitations for informational or planning purposes. | none | Not in the overhaul | 4 → – |
| 14.201 | Preparation of invitations for bids. | Preparation of invitations for bids. | Same | 0 → 0 |
| 14.201-1 | Uniform contract format. | Format. | Changed · 31% alike | 313 → 335 |
| 14.201-2 | Part I—The Schedule. | none | Not in the overhaul | 409 → – |
| 14.201-3 | Part II—Contract clauses. | none | Not in the overhaul | 50 → – |
| 14.201-4 | Part III—Documents, exhibits, and other attachments. | none | Not in the overhaul | 25 → – |
| 14.201-5 | Part IV—Representations and instructions. | none | Not in the overhaul | 128 → – |
| 14.201-6 | Solicitation provisions. | none | Not in the overhaul | 776 → – |
| 14.201-7 | Contract clauses. | none | Not in the overhaul | 486 → – |
| 14.201-8 | Price-related factors. | none | Not in the overhaul | 227 → – |
| 14.201-9 | Simplified contract format. | none | Not in the overhaul | 319 → – |
| 14.202 | General rules for solicitation of bids. | Uniform contract format. | Same | 0 → 0 |
| 14.202-1 | Bidding time. | Part I Schedule. | Changed · 11% alike | 164 → 267 |
| 14.202-2 | [Reserved] | Part II Contract clauses. | Changed · 0% alike | 0 → 8 |
| 14.202-3 | Bid envelopes. | Part III Documents, exhibits, and other attachments. | Changed · 8% alike | 61 → 13 |
| 14.202-4 | Bid samples. | Part IV Representations and instructions. | Changed · 3% alike | 611 → 64 |
| 14.202-5 | Descriptive literature. | none | Not in the overhaul | 360 → – |
| 14.202-6 | Final review of invitations for bids. | none | Not in the overhaul | 36 → – |
| 14.202-7 | Facsimile bids. | none | Not in the overhaul | 118 → – |
| 14.202-8 | Electronic bids. | none | Not in the overhaul | 35 → – |
| 14.203 | Methods of soliciting bids. | Requirements. | Changed · 0% alike | 0 → 87 |
| 14.203-1 | Transmittal to prospective bidders. | none | Not in the overhaul | 49 → – |
| 14.203-2 | Dissemination of information concerning invitations for bids. | none | Not in the overhaul | 37 → – |
| 14.203-3 | Master solicitation. | none | Not in the overhaul | 63 → – |
| 14.204 | Records of invitations for bids and records of bids. | Economic purchase quantities (supplies). | Changed · 12% alike | 94 → 42 |
| 14.205 | Presolicitation notices. | Bid samples. | Changed · 7% alike | 113 → 399 |
| 14.206 | [Reserved] | Descriptive literature. | Changed · 0% alike | 0 → 341 |
| 14.207 | Pre-bid conference. | Solicitation Provisions. | Changed · 2% alike | 71 → 731 |
| 14.208 | Amendment of invitation for bids. | Contract clauses. | Changed · 9% alike | 218 → 285 |
| 14.209 | Cancellation of invitations before opening. | Soliciting bids. | Changed · 28% alike | 215 → 555 |
| 14.210 | Qualified products. | Submission of Bids. | Changed · 6% alike | 3 → 60 |
| 14.211 | Release of acquisition information. | Two-step sealed bidding. | Changed · 0% alike | 218 → 0 |
| 14.211-1 | none | General. | New number | – → 212 |
| 14.211-2 | none | Conditions for use. | New number Same heading as today's 14.502 | – → 247 |
| 14.211-3 | none | Procedures. | New number Same heading as today's 14.503 | – → 901 |
| 14.212 | Economic purchase quantities (supplies). | none | Not in the overhaul | 42 → – |
| 14.213-14.214 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.301 | Responsiveness of bids. | Submission, modification, or withdrawal of bids. | Changed · 11% alike | 156 → 664 |
| 14.302 | Bid submission. | Receipt of an unreadable electronic bid. | Changed · 14% alike | 30 → 85 |
| 14.303 | Modification or withdrawal of bids. | Bid opening. | Changed · 10% alike | 209 → 487 |
| 14.304 | Submission, modification, and withdrawal of bids. | Mistakes in bids. | Changed · 0% alike | 633 → 0 |
| 14.304-1 | none | General. | New number | – → 107 |
| 14.304-2 | none | Apparent clerical mistakes. | New number Same heading as today's 14.407-2 | – → 79 |
| 14.304-3 | none | Other mistakes disclosed before award. | New number Same heading as today's 14.407-3 | – → 1077 |
| 14.305 | none | Cancellation of invitations after opening. | New number Same heading as today's 14.404-1 | – → 512 |
| 14.306 | none | Evaluation. | New number | – → 0 |
| 14.306-1 | none | Responsiveness of bids. | New number | – → 143 |
| 14.306-2 | none | Responsible bidder—reasonableness of price. | New number Same heading as today's 14.408-2 | – → 84 |
| 14.306-3 | none | Rejection of individual bids. | New number Same heading as today's 14.404-2 | – → 559 |
| 14.306-4 | none | Rejection of all bids. | New number | – → 29 |
| 14.306-5 | none | Restrictions on disclosure of descriptive literature. | New number Same heading as today's 14.404-4 | – → 96 |
| 14.306-6 | none | All or none qualifications. | New number Same heading as today's 14.404-5 | – → 59 |
| 14.306-7 | none | Minor informalities or irregularities in bids. | New number Same heading as today's 14.405 | – → 357 |
| 14.306-8 | none | Prompt payment discounts. | New number Same heading as today's 14.408-3 | – → 12 |
| 14.306-9 | none | Economic price adjustment. | New number Same heading as today's 14.408-4 | – → 300 |
| 14.307 | none | Award. | New number | – → 389 |
| 14.308 | none | Award of equal low bids. | New number | – → 167 |
| 14.309 | none | Information to bidders. | New number Same heading as today's 14.409 | – → 0 |
| 14.309-1 | none | Award of unclassified contracts. | New number Same heading as today's 14.409-1 | – → 149 |
| 14.309-2 | none | Award of classified contracts. | New number Same heading as today's 14.409-2 | – → 71 |
| 14.400 | Scope of subpart. | none | Not in the overhaul | 22 → – |
| 14.401 | Receipt and safeguarding of bids. | Mistakes after award. | Changed · 12% alike | 246 → 677 |
| 14.402 | Opening of bids. | Pricing modifications. | Changed · 0% alike | 0 → 11 |
| 14.402-1 | Unclassified bids. | none | Not in the overhaul | 192 → – |
| 14.402-2 | Classified bids. | none | Not in the overhaul | 69 → – |
| 14.402-3 | Postponement of openings. | none | Not in the overhaul | 269 → – |
| 14.403 | Recording of bids. | none | Not in the overhaul | 227 → – |
| 14.404 | Rejection of bids. | none | Not in the overhaul | 0 → – |
| 14.404-1 | Cancellation of invitations after opening. | none | Not in the overhaul Same heading at 14.305 | 689 → – |
| 14.404-2 | Rejection of individual bids. | none | Not in the overhaul Same heading at 14.306-3 | 586 → – |
| 14.404-3 | Notice to bidders of rejection of all bids. | none | Not in the overhaul | 30 → – |
| 14.404-4 | Restrictions on disclosure of descriptive literature. | none | Not in the overhaul Same heading at 14.306-5 | 105 → – |
| 14.404-5 | All or none qualifications. | none | Not in the overhaul Same heading at 14.306-6 | 58 → – |
| 14.405 | Minor informalities or irregularities in bids. | none | Not in the overhaul Same heading at 14.306-7 | 363 → – |
| 14.406 | Receipt of an unreadable electronic bid. | none | Not in the overhaul | 85 → – |
| 14.407 | Mistakes in bids. | none | Not in the overhaul | 0 → – |
| 14.407-1 | General. | none | Not in the overhaul | 79 → – |
| 14.407-2 | Apparent clerical mistakes. | none | Not in the overhaul Same heading at 14.304-2 | 160 → – |
| 14.407-3 | Other mistakes disclosed before award. | none | Not in the overhaul Same heading at 14.304-3 | 1147 → – |
| 14.407-4 | Mistakes after award. | none | Not in the overhaul | 687 → – |
| 14.408 | Award. | none | Not in the overhaul | 0 → – |
| 14.408-1 | General. | none | Not in the overhaul | 414 → – |
| 14.408-2 | Responsible bidder—reasonableness of price. | none | Not in the overhaul Same heading at 14.306-2 | 84 → – |
| 14.408-3 | Prompt payment discounts. | none | Not in the overhaul Same heading at 14.306-8 | 82 → – |
| 14.408-4 | Economic price adjustment. | none | Not in the overhaul Same heading at 14.306-9 | 304 → – |
| 14.408-5 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.408-6 | Equal low bids. | none | Not in the overhaul | 175 → – |
| 14.408-7 | Documentation of award. | none | Not in the overhaul | 67 → – |
| 14.408-8 | Protests against award. | none | Not in the overhaul | 4 → – |
| 14.409 | Information to bidders. | none | Not in the overhaul Same heading at 14.309 | 0 → – |
| 14.409-1 | Award of unclassified contracts. | none | Not in the overhaul Same heading at 14.309-1 | 325 → – |
| 14.409-2 | Award of classified contracts. | none | Not in the overhaul Same heading at 14.309-2 | 70 → – |
| 14.501 | General. | none | Not in the overhaul | 213 → – |
| 14.502 | Conditions for use. | none | Not in the overhaul Same heading at 14.211-2 | 245 → – |
| 14.503 | Procedures. | none | Not in the overhaul Same heading at 14.211-3 | 0 → – |
| 14.503-1 | Step one. | none | Not in the overhaul | 828 → – |
| 14.503-2 | Step two. | none | Not in the overhaul | 103 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.