The FAR overhaul, side by side
FAR Part 14: Sealed Bidding
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 82 sections, 14,667 words (Part 14 as in force, eCFR as of Oct 29, 2026). Overhaul text: 45 sections, 10,714 words (on acquisition.gov ↗, issued Sep 25, 2025). By number: 2 the same, 21 changed, 59 not in the overhaul (15 with the same heading under another number), 22 new.
14.402-3: Not in the overhaul
Today: Postponement of openings.
(a) A bid opening may be postponed even after the time scheduled for bid opening (but otherwise in accordance with 14.208) and—
(1) The contracting officer has reason to believe that the bids of an important segment of bidders have been delayed in the mails, or in the communications system specified for transmission of bids, for causes beyond their control and without their fault or negligence (e.g., flood, fire, accident, weather conditions, strikes, or Government equipment blackout or malfunction when bids are due); or
(2) Emergency or unanticipated events interrupt normal governmental processes so that the conduct of bid openings as scheduled is impractical.
(b) At the time of a determination to postpone a bid opening under subparagraph (a)(1) above, an announcement of the determination shall be publicly posted. If practical before issuance of a formal amendment of the invitation, the determination shall be otherwise communicated to prospective bidders who are likely to attend the scheduled bid opening.
(c) In the case of paragraph (a)(2) of this section, and when urgent Government requirements preclude amendment of the solicitation as prescribed in 14.208, the time specified for opening of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume. In such cases, the time of actual bid opening shall be deemed to be the time set for bid opening for the purpose of determining “late bids” under 14.304. A note should be made on the abstract of bids or otherwise added to the file explaining the circumstances of the postponement.
Overhaul text
No section with this number.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 14.000 | Scope of part. | Scope of part. | Changed · 96% alike | 55 → 53 |
| 14.101 | Elements of sealed bidding. | none | Not in the overhaul | 205 → – |
| 14.102 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.103 | Policy. | none | Not in the overhaul | 0 → – |
| 14.103-1 | General. | none | Not in the overhaul | 61 → – |
| 14.103-2 | Limitations. | none | Not in the overhaul | 93 → – |
| 14.104 | Types of contracts. | none | Not in the overhaul | 52 → – |
| 14.105 | Solicitations for informational or planning purposes. | none | Not in the overhaul | 4 → – |
| 14.201 | Preparation of invitations for bids. | Preparation of invitations for bids. | Same | 0 → 0 |
| 14.201-1 | Uniform contract format. | Format. | Changed · 31% alike | 313 → 335 |
| 14.201-2 | Part I—The Schedule. | none | Not in the overhaul | 409 → – |
| 14.201-3 | Part II—Contract clauses. | none | Not in the overhaul | 50 → – |
| 14.201-4 | Part III—Documents, exhibits, and other attachments. | none | Not in the overhaul | 25 → – |
| 14.201-5 | Part IV—Representations and instructions. | none | Not in the overhaul | 128 → – |
| 14.201-6 | Solicitation provisions. | none | Not in the overhaul | 776 → – |
| 14.201-7 | Contract clauses. | none | Not in the overhaul | 486 → – |
| 14.201-8 | Price-related factors. | none | Not in the overhaul | 227 → – |
| 14.201-9 | Simplified contract format. | none | Not in the overhaul | 319 → – |
| 14.202 | General rules for solicitation of bids. | Uniform contract format. | Same | 0 → 0 |
| 14.202-1 | Bidding time. | Part I Schedule. | Changed · 11% alike | 164 → 267 |
| 14.202-2 | [Reserved] | Part II Contract clauses. | Changed · 0% alike | 0 → 8 |
| 14.202-3 | Bid envelopes. | Part III Documents, exhibits, and other attachments. | Changed · 8% alike | 61 → 13 |
| 14.202-4 | Bid samples. | Part IV Representations and instructions. | Changed · 3% alike | 611 → 64 |
| 14.202-5 | Descriptive literature. | none | Not in the overhaul | 360 → – |
| 14.202-6 | Final review of invitations for bids. | none | Not in the overhaul | 36 → – |
| 14.202-7 | Facsimile bids. | none | Not in the overhaul | 118 → – |
| 14.202-8 | Electronic bids. | none | Not in the overhaul | 35 → – |
| 14.203 | Methods of soliciting bids. | Requirements. | Changed · 0% alike | 0 → 87 |
| 14.203-1 | Transmittal to prospective bidders. | none | Not in the overhaul | 49 → – |
| 14.203-2 | Dissemination of information concerning invitations for bids. | none | Not in the overhaul | 37 → – |
| 14.203-3 | Master solicitation. | none | Not in the overhaul | 63 → – |
| 14.204 | Records of invitations for bids and records of bids. | Economic purchase quantities (supplies). | Changed · 12% alike | 94 → 42 |
| 14.205 | Presolicitation notices. | Bid samples. | Changed · 7% alike | 113 → 399 |
| 14.206 | [Reserved] | Descriptive literature. | Changed · 0% alike | 0 → 341 |
| 14.207 | Pre-bid conference. | Solicitation Provisions. | Changed · 2% alike | 71 → 731 |
| 14.208 | Amendment of invitation for bids. | Contract clauses. | Changed · 9% alike | 218 → 285 |
| 14.209 | Cancellation of invitations before opening. | Soliciting bids. | Changed · 28% alike | 215 → 555 |
| 14.210 | Qualified products. | Submission of Bids. | Changed · 6% alike | 3 → 60 |
| 14.211 | Release of acquisition information. | Two-step sealed bidding. | Changed · 0% alike | 218 → 0 |
| 14.211-1 | none | General. | New number | – → 212 |
| 14.211-2 | none | Conditions for use. | New number Same heading as today's 14.502 | – → 247 |
| 14.211-3 | none | Procedures. | New number Same heading as today's 14.503 | – → 901 |
| 14.212 | Economic purchase quantities (supplies). | none | Not in the overhaul | 42 → – |
| 14.213-14.214 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.301 | Responsiveness of bids. | Submission, modification, or withdrawal of bids. | Changed · 11% alike | 156 → 664 |
| 14.302 | Bid submission. | Receipt of an unreadable electronic bid. | Changed · 14% alike | 30 → 85 |
| 14.303 | Modification or withdrawal of bids. | Bid opening. | Changed · 10% alike | 209 → 487 |
| 14.304 | Submission, modification, and withdrawal of bids. | Mistakes in bids. | Changed · 0% alike | 633 → 0 |
| 14.304-1 | none | General. | New number | – → 107 |
| 14.304-2 | none | Apparent clerical mistakes. | New number Same heading as today's 14.407-2 | – → 79 |
| 14.304-3 | none | Other mistakes disclosed before award. | New number Same heading as today's 14.407-3 | – → 1077 |
| 14.305 | none | Cancellation of invitations after opening. | New number Same heading as today's 14.404-1 | – → 512 |
| 14.306 | none | Evaluation. | New number | – → 0 |
| 14.306-1 | none | Responsiveness of bids. | New number | – → 143 |
| 14.306-2 | none | Responsible bidder—reasonableness of price. | New number Same heading as today's 14.408-2 | – → 84 |
| 14.306-3 | none | Rejection of individual bids. | New number Same heading as today's 14.404-2 | – → 559 |
| 14.306-4 | none | Rejection of all bids. | New number | – → 29 |
| 14.306-5 | none | Restrictions on disclosure of descriptive literature. | New number Same heading as today's 14.404-4 | – → 96 |
| 14.306-6 | none | All or none qualifications. | New number Same heading as today's 14.404-5 | – → 59 |
| 14.306-7 | none | Minor informalities or irregularities in bids. | New number Same heading as today's 14.405 | – → 357 |
| 14.306-8 | none | Prompt payment discounts. | New number Same heading as today's 14.408-3 | – → 12 |
| 14.306-9 | none | Economic price adjustment. | New number Same heading as today's 14.408-4 | – → 300 |
| 14.307 | none | Award. | New number | – → 389 |
| 14.308 | none | Award of equal low bids. | New number | – → 167 |
| 14.309 | none | Information to bidders. | New number Same heading as today's 14.409 | – → 0 |
| 14.309-1 | none | Award of unclassified contracts. | New number Same heading as today's 14.409-1 | – → 149 |
| 14.309-2 | none | Award of classified contracts. | New number Same heading as today's 14.409-2 | – → 71 |
| 14.400 | Scope of subpart. | none | Not in the overhaul | 22 → – |
| 14.401 | Receipt and safeguarding of bids. | Mistakes after award. | Changed · 12% alike | 246 → 677 |
| 14.402 | Opening of bids. | Pricing modifications. | Changed · 0% alike | 0 → 11 |
| 14.402-1 | Unclassified bids. | none | Not in the overhaul | 192 → – |
| 14.402-2 | Classified bids. | none | Not in the overhaul | 69 → – |
| 14.402-3 | Postponement of openings. | none | Not in the overhaul | 269 → – |
| 14.403 | Recording of bids. | none | Not in the overhaul | 227 → – |
| 14.404 | Rejection of bids. | none | Not in the overhaul | 0 → – |
| 14.404-1 | Cancellation of invitations after opening. | none | Not in the overhaul Same heading at 14.305 | 689 → – |
| 14.404-2 | Rejection of individual bids. | none | Not in the overhaul Same heading at 14.306-3 | 586 → – |
| 14.404-3 | Notice to bidders of rejection of all bids. | none | Not in the overhaul | 30 → – |
| 14.404-4 | Restrictions on disclosure of descriptive literature. | none | Not in the overhaul Same heading at 14.306-5 | 105 → – |
| 14.404-5 | All or none qualifications. | none | Not in the overhaul Same heading at 14.306-6 | 58 → – |
| 14.405 | Minor informalities or irregularities in bids. | none | Not in the overhaul Same heading at 14.306-7 | 363 → – |
| 14.406 | Receipt of an unreadable electronic bid. | none | Not in the overhaul | 85 → – |
| 14.407 | Mistakes in bids. | none | Not in the overhaul | 0 → – |
| 14.407-1 | General. | none | Not in the overhaul | 79 → – |
| 14.407-2 | Apparent clerical mistakes. | none | Not in the overhaul Same heading at 14.304-2 | 160 → – |
| 14.407-3 | Other mistakes disclosed before award. | none | Not in the overhaul Same heading at 14.304-3 | 1147 → – |
| 14.407-4 | Mistakes after award. | none | Not in the overhaul | 687 → – |
| 14.408 | Award. | none | Not in the overhaul | 0 → – |
| 14.408-1 | General. | none | Not in the overhaul | 414 → – |
| 14.408-2 | Responsible bidder—reasonableness of price. | none | Not in the overhaul Same heading at 14.306-2 | 84 → – |
| 14.408-3 | Prompt payment discounts. | none | Not in the overhaul Same heading at 14.306-8 | 82 → – |
| 14.408-4 | Economic price adjustment. | none | Not in the overhaul Same heading at 14.306-9 | 304 → – |
| 14.408-5 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.408-6 | Equal low bids. | none | Not in the overhaul | 175 → – |
| 14.408-7 | Documentation of award. | none | Not in the overhaul | 67 → – |
| 14.408-8 | Protests against award. | none | Not in the overhaul | 4 → – |
| 14.409 | Information to bidders. | none | Not in the overhaul Same heading at 14.309 | 0 → – |
| 14.409-1 | Award of unclassified contracts. | none | Not in the overhaul Same heading at 14.309-1 | 325 → – |
| 14.409-2 | Award of classified contracts. | none | Not in the overhaul Same heading at 14.309-2 | 70 → – |
| 14.501 | General. | none | Not in the overhaul | 213 → – |
| 14.502 | Conditions for use. | none | Not in the overhaul Same heading at 14.211-2 | 245 → – |
| 14.503 | Procedures. | none | Not in the overhaul Same heading at 14.211-3 | 0 → – |
| 14.503-1 | Step one. | none | Not in the overhaul | 828 → – |
| 14.503-2 | Step two. | none | Not in the overhaul | 103 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress