The FAR overhaul, side by side
FAR Part 14: Sealed Bidding
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 82 sections, 14,667 words (Part 14 as in force, eCFR as of Oct 29, 2026). Overhaul text: 45 sections, 10,714 words (on acquisition.gov ↗, issued Sep 25, 2025). By number: 2 the same, 21 changed, 59 not in the overhaul (15 with the same heading under another number), 22 new.
14.304: Changed (0% alike)
Today: Submission, modification, and withdrawal of bids.
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bid (IFB) by the time specified in the IFB. They may use any transmission method authorized by the IFB (i.e., regular mail, electronic commerce, or facsimile). If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late bid would not unduly delay the acquisition; and—
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB, and urgent Government requirements preclude amendment of the bid opening date, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the IFB on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid. Upon withdrawal of an electronically transmitted bid, the data received must not be viewed and, where practicable, must be purged from primary and backup data storage systems.
(f) The contracting officer must promptly notify any bidder if its bid, modification, or withdrawal was received late, and must inform the bidder whether its bid will be considered, unless contract award is imminent and the notices prescribed in 14.409 would suffice.
(g) Late bids and modifications that are not considered must be held unopened, unless opened for identification, until after award and then retained with other unsuccessful bids. However, any bid bond or guarantee must be returned.
(h) If available, the following must be included in the contract files for each late bid, modification, or withdrawal:
(1) The date and hour of receipt.
(2) A statement, with supporting rationale, regarding whether the bid was considered for award.
(3) The envelope, wrapper, or other evidence of the date of receipt.
Overhaul text: Mistakes in bids.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 14.000 | Scope of part. | Scope of part. | Changed · 96% alike | 55 → 53 |
| 14.101 | Elements of sealed bidding. | none | Not in the overhaul | 205 → – |
| 14.102 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.103 | Policy. | none | Not in the overhaul | 0 → – |
| 14.103-1 | General. | none | Not in the overhaul | 61 → – |
| 14.103-2 | Limitations. | none | Not in the overhaul | 93 → – |
| 14.104 | Types of contracts. | none | Not in the overhaul | 52 → – |
| 14.105 | Solicitations for informational or planning purposes. | none | Not in the overhaul | 4 → – |
| 14.201 | Preparation of invitations for bids. | Preparation of invitations for bids. | Same | 0 → 0 |
| 14.201-1 | Uniform contract format. | Format. | Changed · 31% alike | 313 → 335 |
| 14.201-2 | Part I—The Schedule. | none | Not in the overhaul | 409 → – |
| 14.201-3 | Part II—Contract clauses. | none | Not in the overhaul | 50 → – |
| 14.201-4 | Part III—Documents, exhibits, and other attachments. | none | Not in the overhaul | 25 → – |
| 14.201-5 | Part IV—Representations and instructions. | none | Not in the overhaul | 128 → – |
| 14.201-6 | Solicitation provisions. | none | Not in the overhaul | 776 → – |
| 14.201-7 | Contract clauses. | none | Not in the overhaul | 486 → – |
| 14.201-8 | Price-related factors. | none | Not in the overhaul | 227 → – |
| 14.201-9 | Simplified contract format. | none | Not in the overhaul | 319 → – |
| 14.202 | General rules for solicitation of bids. | Uniform contract format. | Same | 0 → 0 |
| 14.202-1 | Bidding time. | Part I Schedule. | Changed · 11% alike | 164 → 267 |
| 14.202-2 | [Reserved] | Part II Contract clauses. | Changed · 0% alike | 0 → 8 |
| 14.202-3 | Bid envelopes. | Part III Documents, exhibits, and other attachments. | Changed · 8% alike | 61 → 13 |
| 14.202-4 | Bid samples. | Part IV Representations and instructions. | Changed · 3% alike | 611 → 64 |
| 14.202-5 | Descriptive literature. | none | Not in the overhaul | 360 → – |
| 14.202-6 | Final review of invitations for bids. | none | Not in the overhaul | 36 → – |
| 14.202-7 | Facsimile bids. | none | Not in the overhaul | 118 → – |
| 14.202-8 | Electronic bids. | none | Not in the overhaul | 35 → – |
| 14.203 | Methods of soliciting bids. | Requirements. | Changed · 0% alike | 0 → 87 |
| 14.203-1 | Transmittal to prospective bidders. | none | Not in the overhaul | 49 → – |
| 14.203-2 | Dissemination of information concerning invitations for bids. | none | Not in the overhaul | 37 → – |
| 14.203-3 | Master solicitation. | none | Not in the overhaul | 63 → – |
| 14.204 | Records of invitations for bids and records of bids. | Economic purchase quantities (supplies). | Changed · 12% alike | 94 → 42 |
| 14.205 | Presolicitation notices. | Bid samples. | Changed · 7% alike | 113 → 399 |
| 14.206 | [Reserved] | Descriptive literature. | Changed · 0% alike | 0 → 341 |
| 14.207 | Pre-bid conference. | Solicitation Provisions. | Changed · 2% alike | 71 → 731 |
| 14.208 | Amendment of invitation for bids. | Contract clauses. | Changed · 9% alike | 218 → 285 |
| 14.209 | Cancellation of invitations before opening. | Soliciting bids. | Changed · 28% alike | 215 → 555 |
| 14.210 | Qualified products. | Submission of Bids. | Changed · 6% alike | 3 → 60 |
| 14.211 | Release of acquisition information. | Two-step sealed bidding. | Changed · 0% alike | 218 → 0 |
| 14.211-1 | none | General. | New number | – → 212 |
| 14.211-2 | none | Conditions for use. | New number Same heading as today's 14.502 | – → 247 |
| 14.211-3 | none | Procedures. | New number Same heading as today's 14.503 | – → 901 |
| 14.212 | Economic purchase quantities (supplies). | none | Not in the overhaul | 42 → – |
| 14.213-14.214 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.301 | Responsiveness of bids. | Submission, modification, or withdrawal of bids. | Changed · 11% alike | 156 → 664 |
| 14.302 | Bid submission. | Receipt of an unreadable electronic bid. | Changed · 14% alike | 30 → 85 |
| 14.303 | Modification or withdrawal of bids. | Bid opening. | Changed · 10% alike | 209 → 487 |
| 14.304 | Submission, modification, and withdrawal of bids. | Mistakes in bids. | Changed · 0% alike | 633 → 0 |
| 14.304-1 | none | General. | New number | – → 107 |
| 14.304-2 | none | Apparent clerical mistakes. | New number Same heading as today's 14.407-2 | – → 79 |
| 14.304-3 | none | Other mistakes disclosed before award. | New number Same heading as today's 14.407-3 | – → 1077 |
| 14.305 | none | Cancellation of invitations after opening. | New number Same heading as today's 14.404-1 | – → 512 |
| 14.306 | none | Evaluation. | New number | – → 0 |
| 14.306-1 | none | Responsiveness of bids. | New number | – → 143 |
| 14.306-2 | none | Responsible bidder—reasonableness of price. | New number Same heading as today's 14.408-2 | – → 84 |
| 14.306-3 | none | Rejection of individual bids. | New number Same heading as today's 14.404-2 | – → 559 |
| 14.306-4 | none | Rejection of all bids. | New number | – → 29 |
| 14.306-5 | none | Restrictions on disclosure of descriptive literature. | New number Same heading as today's 14.404-4 | – → 96 |
| 14.306-6 | none | All or none qualifications. | New number Same heading as today's 14.404-5 | – → 59 |
| 14.306-7 | none | Minor informalities or irregularities in bids. | New number Same heading as today's 14.405 | – → 357 |
| 14.306-8 | none | Prompt payment discounts. | New number Same heading as today's 14.408-3 | – → 12 |
| 14.306-9 | none | Economic price adjustment. | New number Same heading as today's 14.408-4 | – → 300 |
| 14.307 | none | Award. | New number | – → 389 |
| 14.308 | none | Award of equal low bids. | New number | – → 167 |
| 14.309 | none | Information to bidders. | New number Same heading as today's 14.409 | – → 0 |
| 14.309-1 | none | Award of unclassified contracts. | New number Same heading as today's 14.409-1 | – → 149 |
| 14.309-2 | none | Award of classified contracts. | New number Same heading as today's 14.409-2 | – → 71 |
| 14.400 | Scope of subpart. | none | Not in the overhaul | 22 → – |
| 14.401 | Receipt and safeguarding of bids. | Mistakes after award. | Changed · 12% alike | 246 → 677 |
| 14.402 | Opening of bids. | Pricing modifications. | Changed · 0% alike | 0 → 11 |
| 14.402-1 | Unclassified bids. | none | Not in the overhaul | 192 → – |
| 14.402-2 | Classified bids. | none | Not in the overhaul | 69 → – |
| 14.402-3 | Postponement of openings. | none | Not in the overhaul | 269 → – |
| 14.403 | Recording of bids. | none | Not in the overhaul | 227 → – |
| 14.404 | Rejection of bids. | none | Not in the overhaul | 0 → – |
| 14.404-1 | Cancellation of invitations after opening. | none | Not in the overhaul Same heading at 14.305 | 689 → – |
| 14.404-2 | Rejection of individual bids. | none | Not in the overhaul Same heading at 14.306-3 | 586 → – |
| 14.404-3 | Notice to bidders of rejection of all bids. | none | Not in the overhaul | 30 → – |
| 14.404-4 | Restrictions on disclosure of descriptive literature. | none | Not in the overhaul Same heading at 14.306-5 | 105 → – |
| 14.404-5 | All or none qualifications. | none | Not in the overhaul Same heading at 14.306-6 | 58 → – |
| 14.405 | Minor informalities or irregularities in bids. | none | Not in the overhaul Same heading at 14.306-7 | 363 → – |
| 14.406 | Receipt of an unreadable electronic bid. | none | Not in the overhaul | 85 → – |
| 14.407 | Mistakes in bids. | none | Not in the overhaul | 0 → – |
| 14.407-1 | General. | none | Not in the overhaul | 79 → – |
| 14.407-2 | Apparent clerical mistakes. | none | Not in the overhaul Same heading at 14.304-2 | 160 → – |
| 14.407-3 | Other mistakes disclosed before award. | none | Not in the overhaul Same heading at 14.304-3 | 1147 → – |
| 14.407-4 | Mistakes after award. | none | Not in the overhaul | 687 → – |
| 14.408 | Award. | none | Not in the overhaul | 0 → – |
| 14.408-1 | General. | none | Not in the overhaul | 414 → – |
| 14.408-2 | Responsible bidder—reasonableness of price. | none | Not in the overhaul Same heading at 14.306-2 | 84 → – |
| 14.408-3 | Prompt payment discounts. | none | Not in the overhaul Same heading at 14.306-8 | 82 → – |
| 14.408-4 | Economic price adjustment. | none | Not in the overhaul Same heading at 14.306-9 | 304 → – |
| 14.408-5 | [Reserved] | none | Not in the overhaul | 0 → – |
| 14.408-6 | Equal low bids. | none | Not in the overhaul | 175 → – |
| 14.408-7 | Documentation of award. | none | Not in the overhaul | 67 → – |
| 14.408-8 | Protests against award. | none | Not in the overhaul | 4 → – |
| 14.409 | Information to bidders. | none | Not in the overhaul Same heading at 14.309 | 0 → – |
| 14.409-1 | Award of unclassified contracts. | none | Not in the overhaul Same heading at 14.309-1 | 325 → – |
| 14.409-2 | Award of classified contracts. | none | Not in the overhaul Same heading at 14.309-2 | 70 → – |
| 14.501 | General. | none | Not in the overhaul | 213 → – |
| 14.502 | Conditions for use. | none | Not in the overhaul Same heading at 14.211-2 | 245 → – |
| 14.503 | Procedures. | none | Not in the overhaul Same heading at 14.211-3 | 0 → – |
| 14.503-1 | Step one. | none | Not in the overhaul | 828 → – |
| 14.503-2 | Step two. | none | Not in the overhaul | 103 → – |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress