The FAR overhaul, side by side

FAR Part 15: Contracting by Negotiation

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 81 sections, 32,499 words (Part 15 as in force, eCFR as of Oct 29, 2026). Overhaul text: 91 sections, 28,441 words (on acquisition.gov ↗, issued Sep 30, 2025). By number: 1 the same, 44 changed, 36 not in the overhaul (10 with the same heading under another number), 46 new.

15.304: Changed (5% alike)

Today: Evaluation factors and significant subfactors.

This section in plain English

(a) The award decision is based on evaluation factors and significant subfactors that are tailored to the acquisition.

(b) Evaluation factors and significant subfactors must—

(1) Represent the key areas of importance and emphasis to be considered in the source selection decision; and

(2) Support meaningful comparison and discrimination between and among competing proposals.

(c) The evaluation factors and significant subfactors that apply to an acquisition and their relative importance are within the broad discretion of agency acquisition officials, subject to the following requirements:

(1)(i) Price or cost to the Government shall be evaluated in every source selection (10 U.S.C. 3206(c)(1)(B) and 41 U.S.C. 3306(c)(1)(B)) (also see part 36 for architect-engineer contracts), subject to the exception listed in paragraph (c)(1)(ii)(A) of this section for use by DoD, NASA, and the Coast Guard.

(ii) In accordance with 10 U.S.C. 3206(c), for DoD, NASA, and the Coast Guard—

(A) The contracting officer may choose not to include price or cost as an evaluation factor for award when a solicitation—

(1) Has an estimated value above the simplified acquisition threshold;

(2) Will result in multiple-award contracts (see subpart 16.5) that are for the same or similar services; and

(3) States that the Government intends to make an award to each and all qualifying offerors (see 2.101).

(B) If the contracting officer chooses not to include price or cost as an evaluation factor for the contract award, in accordance with paragraph (c)(1)(ii)(A) of this section, the contracting officer shall consider price or cost as one of the factors in the selection decision for each order placed under the contract.

(C) The exception in paragraph (c)(1)(ii)(A) of this section shall not apply to solicitations for multiple-award contracts that provide for sole source orders pursuant to section 8(a) of the Small Business Act (15 U.S.C. 637(a)).

(2) The quality of the product or service shall be addressed in every source selection through consideration of one or more non-cost evaluation factors such as past performance, compliance with solicitation requirements, technical excellence, management capability, personnel qualifications, and prior experience ((10 U.S.C. 3206(c)(1)(A)and 41 U.S.C. 3306(c)(1)(A)).

(3)(i) Past performance, except as set forth in paragraph (c)(3)(iii) of this section, shall be evaluated in all source selections for negotiated competitive acquisitions expected to exceed the simplified acquisition threshold.

(ii) For solicitations that are not set aside for small business concerns, involving consolidation or bundling, that offer a significant opportunity for subcontracting, the contracting officer shall include a factor to evaluate past performance indicating the extent to which the offeror attained applicable goals for small business participation under contracts that required subcontracting plans (15 U.S.C. 637(d)(4)(G)(ii)).

(iii) Past performance need not be evaluated if the contracting officer documents the reason past performance is not an appropriate evaluation factor for the acquisition.

(4) For solicitations, that are not set aside for small business concerns, involving consolidation or bundling, that offer a significant opportunity for subcontracting, the contracting officer shall include proposed small business subcontracting participation in the subcontracting plan as an evaluation factor (15 U.S.C. 637(d)(4)(G)(i)).

(5) If telecommuting is not prohibited, agencies shall not unfavorably evaluate an offer that includes telecommuting unless the contracting officer executes a written determination in accordance with FAR 7.108(b).

(d) All factors and significant subfactors that will affect contract award and their relative importance shall be stated clearly in the solicitation (10 U.S.C. 3206(b)(1) and 41 U.S.C. 3306(b)(1) (see 15.204-5(c)). The rating method need not be disclosed in the solicitation. The general approach for evaluating past performance information shall be described.

(e) Unless the exception at paragraph (c)(1)(ii)(A) of this section applies, the solicitation shall also state, at a minimum, whether all evaluation factors other than cost or price, when combined, are—

(1) Significantly more important than cost or price;

(2) Approximately equal to cost or price; or

(3) Significantly less important than cost or price (10 U.S.C. 3206(c)(1)(C) and 41 U.S.C. 3306(c)(1)(C)).

Overhaul text: Defective certified cost or pricing data after award.

On acquisition.gov ↗

(a)(1) If, after award, certified cost or pricing data are found to be inaccurate, incomplete, or noncurrent as of the date of final agreement on price or an earlier date agreed upon by the parties given on the contractor's or subcontractor's Certificate of Current Cost or Pricing Data, the Government is entitled to a price adjustment, including profit or fee, of any significant amount by which the price was increased because of the defective data.

(i) This entitlement is ensured by including in the contract one of the clauses prescribed in 15.110(j) and (k), and is set forth in the clauses at 52.215-10, Price Reduction for Defective Certified Cost or Pricing Data , and 52.215-11, Price Reduction for Defective Certified Cost or Pricing Data—Modifications .

(ii) The clauses give the Government the right to a price adjustment for defects in certified cost or pricing data submitted by the contractor, a prospective subcontractor, or an actual subcontractor.

(2) In arriving at a price adjustment, contracting officers must consider the time by which the certified cost or pricing data became reasonably available to the contractor, and the extent to which the Government relied upon the defective data.

(3) The clauses referred to in paragraph (a)(1)(i) of this subsection recognize that the Government's right to a price adjustment is not affected by any of the following circumstances:

(i) The contractor or subcontractor was a sole source supplier or otherwise was in a superior bargaining position;

(ii) The contracting officer should have known that the certified cost or pricing data in issue were defective even though the contractor or subcontractor took no affirmative action to bring the character of the data to the attention of the contracting officer;

(iii) The contract was based on an agreement about the total cost of the contract and there was no agreement about the cost of each item procured under such contract; or

(iv) Certified cost or pricing data were required; however, the contractor or subcontractor did not submit a Certificate of Current Cost or Pricing Data relating to the contract.

(4) Subject to paragraphs (a)(5) and (6) of this subsection, contracting officers must allow an offset for any understated certified cost or pricing data submitted in support of price negotiations, up to the amount of the Government's claim for overstated pricing data arising out of the same pricing action (e.g., the initial pricing of the same contract or the pricing of the same change order).

(5) An offset must be allowed only in an amount supported by the facts and if the contractor—

(i) Certifies to the contracting officer that, to the best of the contractor's knowledge and belief, the contractor is entitled to the offset in the amount requested; and

(ii) Proves that the certified cost or pricing data were available before the “as of” date specified on the Certificate of Current Cost or Pricing Data but were not submitted. Such offsets need not be in the same cost groupings (e.g., material, direct labor, or indirect costs).

(6) An offset must not be allowed if—

(i) The understated data were known by the contractor to be understated before the “as of” date specified on the Certificate of Current Cost or Pricing Data; or

(ii) The Government proves that the facts demonstrate that the price would not have increased in the amount to be offset even if the available data had been submitted before the “as of” date specified on the Certificate of Current Cost or Pricing Data.

(7)(i) In addition to the price adjustment, the Government is entitled to recovery of any overpayment plus interest on the overpayments. The Government is also entitled to penalty amounts on certain of these overpayments. Overpayment occurs only when payment is made for supplies or services accepted by the Government. Overpayments do not result from amounts paid for contract financing, as defined in part 32.

(ii) In calculating the interest amount due, contracting officers must—

(A) Determine the defective pricing amounts that have been overpaid to the contractor;

(B) Consider the date of each overpayment (the date of overpayment for this interest calculation must be the date payment was made for the related completed and accepted contract items; or for subcontract defective pricing, the date payment was made to the prime contractor, based on prime contract progress billings or deliveries, which included payments for a completed and accepted subcontract item); and

(C) Apply the underpayment interest rate(s) in effect for each quarter from the time of overpayment to the time of repayment, utilizing rate(s) prescribed by the Secretary of the Treasury under 26 U.S.C. 6621(a)(2).

(iii) In arriving at the amount due for penalties on contracts where the submission of defective certified cost or pricing data was a knowing submission, contracting officers must obtain an amount equal to the amount of overpayment made. Before taking any contractual actions concerning penalties, the contracting officer must obtain the advice of counsel.

(iv) In the demand letter, contracting officers must separately include—

(A) The repayment amount;

(B) The penalty amount (if any);

(C) The interest amount through a specified date; and

(D) A statement that interest will continue to accrue until repayment is made.

(b) If, after award, the contracting officer learns or suspects that the data furnished were not accurate, complete, and current, or were not adequately verified by the contractor as of the time of negotiation, the contracting officer must request an audit to evaluate the accuracy, completeness, and currency of the data. The Government may evaluate the profit-cost relationships only if the audit reveals that the data certified by the contractor were defective. Contracting officers must not reprice the contract solely because the profit was greater than forecast or because a contingency specified in the submission failed to materialize.

(c) For each advisory audit received based on a postaward review that indicates defective pricing, contracting officers must make a determination as to whether or not the data submitted were defective and relied upon. Before making such a determination, contracting officers should give the contractor an opportunity to support the accuracy, completeness, and currency of the data in question. Contracting officers must prepare a memorandum documenting both the determination and any corrective action taken as a result. Contracting officers must send one copy of this memorandum to the auditor and, if the contract has been assigned for administration, one copy to the administrative contracting officer (ACO). A copy of the memorandum or other notice of the contracting officer's determination must be provided to the contractor. When the contracting officer determines that the contractor submitted defective cost or pricing data, the contracting officer, in accordance with agency procedures, must ensure that information relating to the contracting officer's final determination is reported as part of the contractor’s performance information in accordance with part 42. Agencies must ensure updated information that changes a contracting officer's prior final determination is reported into the FAPIIS module of Contractor Performance Assessment Reporting System (CPARS) in the event of a—

(1) Contracting officer's decision in accordance with the Contract Disputes statute;

(2) Board of Contract Appeals decision; or

(3) Court decision.

(d) If both the contractor and subcontractor submitted, and the contractor certified, or should have certified, cost or pricing data, the Government has the right, under the clauses at 52.215-10, Price Reduction for Defective Certified Cost or Pricing Data , and 52.215-11, Price Reduction for Defective Certified Cost or Pricing Data—Modifications , to reduce the prime contract price if it was significantly increased because a subcontractor submitted defective data. This right applies whether these data supported subcontract cost estimates or supported firm agreements between subcontractor and contractor.

(e) If Government audit discloses defective subcontractor certified cost or pricing data, the information necessary to support a reduction in prime contract and subcontract prices may be available only from the Government. To the extent necessary to secure a prime contract price reduction, contracting officers should make this information available to the prime contractor or appropriate subcontractors, upon request. If release of the information would compromise Government security or disclose trade secrets or confidential business information, the contracting officers must release it only under conditions that will protect it from improper disclosure. Information made available under this paragraph must be limited to that used as the basis for the prime contract price reduction. In order to afford an opportunity for corrective action, contracting officers should give the prime contractor reasonable advance notice before determining to reduce the prime contract price.

(1) When a prime contractor includes defective subcontract data in arriving at the price but later awards the subcontract to a lower priced subcontractor (or does not subcontract for the work), any adjustment in the prime contract price due to defective subcontract data is limited to the difference (plus applicable indirect cost and profit markups) between the subcontract price used for pricing the prime contract, and either the actual subcontract price or the actual cost to the contractor, if not subcontracted, provided the data on which the actual subcontract price is based are not themselves defective.

(2) Under cost-reimbursement contracts and under all fixed-price contracts except firm-fixed-price contracts and fixed-price contracts with economic price adjustment, payments to subcontractors that are higher than they would be had there been no defective subcontractor certified cost or pricing data must be the basis for disallowance or nonrecognition of costs under the clauses prescribed in 15.110(j) and (k). The Government has a continuing and direct financial interest in such payments that is unaffected by the initial agreement on prime contract price.

Section by section

SectionTodayOverhaul textStatusWords
15.000Scope of part.Scope.Changed · 35% alike28 → 46
15.001Definitions.Definitions.Changed · 75% alike136 → 149
15.002Types of negotiated acquisition.Types of negotiated acquisition.Changed · 47% alike94 → 121
15.100Scope of subpart.Scope.Changed · 17% alike27 → 32
15.101Best value continuum.Early exchanges with industry.Changed · 5% alike95 → 452
15.101-1Tradeoff process.noneNot in the overhaul153 → –
15.101-2Lowest price technically acceptable source selection process.noneNot in the overhaul555 → –
15.101-3Tiered evaluation of small business offers.noneNot in the overhaul28 → –
15.102Oral presentations.Structuring a request for proposals.Changed · 8% alike550 → 330
15.103noneDeveloping a competitive source selection approach.New number– → 82
15.103-1noneTradeoff approach.New number– → 64
15.103-2noneLowest price technically acceptable approach.New number– → 385
15.103-3noneHighest technically rated with a fair and reasonable price approachNew number– → 238
15.103-4nonePhased acquisition.New number– → 101
15.104noneEstablishing competitive evaluation factors and significant subfactors.New number– → 709
15.105noneOther considerations.New number– → 0
15.105-1noneOral presentations.New number– → 76
15.105-2noneNegotiations disclosure.New number– → 50
15.105-3noneLimitation on tiered evaluations for multiple award contracts.New number– → 35
15.105-4noneRequest for cost or pricing data.New number– → 261
15.105-5noneMake-or-buy decision.New number– → 515
15.105-6noneShould-cost review.New number
Same heading as today's 15.407-4
– → 28
15.105-7noneUnit prices.New number– → 55
15.106noneAmending a request for proposal.New number– → 328
15.107noneSubmission, modification, revision, and withdrawal of proposals.New number
Same heading as today's 15.208
– → 593
15.108noneReceiving proposals.New number– → 143
15.109noneUniform contract format.New number– → 74
15.109-1nonePart I - The Schedule.New number– → 317
15.109-2nonePart II - Contract Clauses.New number
Same heading as today's 15.204-3
– → 55
15.109-3nonePart III - List of Documents, Exhibits, and Other Attachments.New number
Same heading as today's 15.204-4
– → 37
15.109-4nonePart IV - Representations and Instructions.New number
Same heading as today's 15.204-5
– → 155
15.110noneSolicitation provisions and contract clauses.New number
Same heading as today's 15.209
– → 1609
15.200Scope of subpart.Scope.Changed · 35% alike36 → 15
15.201Exchanges with industry before receipt of proposals.Source selection responsibilities.Changed · 7% alike527 → 352
15.202Advisory multi-step process.Evaluating competitive proposals.Changed · 9% alike250 → 735
15.203Requests for proposals.Competitive award without negotiation.Changed · 6% alike566 → 64
15.204Contract format.Competitive award with negotiation.Changed · 0% alike93 → 0
15.204-1Uniform contract format.Establishing a competitive range.Changed · 12% alike108 → 139
15.204-2Part I—The Schedule.Competitive negotiations.Changed · 6% alike359 → 409
15.204-3Part II—Contract Clauses.noneNot in the overhaul
Same heading at 15.109-2
61 → –
15.204-4Part III—List of Documents, Exhibits, and Other Attachments.noneNot in the overhaul
Same heading at 15.109-3
37 → –
15.204-5Part IV—Representations and Instructions.noneNot in the overhaul
Same heading at 15.109-4
189 → –
15.205Issuing solicitations.Source selection decision.Changed · 7% alike40 → 72
15.206Amending the solicitation.Preaward notices and debriefings.Changed · 5% alike305 → 69
15.206-1nonePreaward notices.New number– → 189
15.206-2nonePreaward debriefing.New number– → 411
15.207Handling proposals and information.Award.Changed · 0% alike195 → 0
15.207-1noneAward to successful offeror.New number– → 185
15.207-2noneAward notice.New number– → 249
15.208Submission, modification, revision, and withdrawal of proposals.noneNot in the overhaul
Same heading at 15.107
611 → –
15.209Solicitation provisions and contract clauses.noneNot in the overhaul
Same heading at 15.110
509 → –
15.210Forms.noneNot in the overhaul90 → –
15.300Scope of subpart.Scope.Changed · 17% alike17 → 64
15.301[Reserved]Postaward debriefing of offerors.Changed · 0% alike0 → 15
15.301-1noneDebriefing process.New number– → 597
15.301-2noneOpportunity for follow-up questions.New number– → 22
15.302Source selection objective.Protests against award.Changed · 9% alike15 → 169
15.303Responsibilities.Discovery of mistakes.Changed · 6% alike211 → 27
15.304Evaluation factors and significant subfactors.Defective certified cost or pricing data after award.Changed · 5% alike712 → 1622
15.305Proposal evaluation.Estimating systems.Changed · 6% alike703 → 109
15.306Exchanges with offerors after receipt of proposals.noneNot in the overhaul1314 → –
15.307Proposal revisions.noneNot in the overhaul116 → –
15.308Source selection decision.noneNot in the overhaul101 → –
15.400Scope of subpart.Scope of subpart.Changed · 95% alike29 → 28
15.401Definitions.Definitions.Changed · 98% alike57 → 57
15.402Pricing policy.General.Changed · 51% alike440 → 232
15.403Obtaining certified cost or pricing data.Obtaining cost or pricing data.Same0 → 0
15.403-1Prohibition on obtaining certified cost or pricing data (10 U.S.C. chapter 271 and 41 U.S.C. chapter 35).Data other than certified cost or pricing data.Changed · 12% alike1320 → 708
15.403-2Other circumstances where certified cost or pricing data are not required.Prohibitions on obtaining certified cost or pricing data.Changed · 4% alike47 → 1218
15.403-3Requiring data other than certified cost or pricing data.Certified cost or pricing data.Changed · 7% alike847 → 752
15.403-4Requiring certified cost or pricing data (10 U.S.C. chapter 271 and 41 U.S.C. chapter 35).Certificate of current cost or pricing data.Changed · 12% alike809 → 500
15.403-5Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data.noneNot in the overhaul258 → –
15.404Proposal analysis.Cost and/or price analysis.Changed · 0% alike0 → 287
15.404-1Proposal analysis techniques.Price analysis.Changed · 28% alike2546 → 481
15.404-2Data to support proposal analysis.Cost analysis.Changed · 7% alike909 → 411
15.404-3Subcontract pricing considerations.Cost realism analysis.Changed · 9% alike456 → 276
15.404-4Profit.Technical cost or price analysis.Changed · 4% alike1730 → 201
15.404-5noneUnit prices.New number– → 164
15.404-6noneUnbalanced pricing.New number– → 213
15.404-7noneReview and justification of pass-through contracts.New number– → 180
15.404-8noneSubcontract pricing considerations.New number– → 467
15.404-9noneProfit.New number– → 1489
15.405Price negotiation.Special cost or pricing areas.Changed · 0% alike369 → 0
15.405-1noneInaccurate, incomplete, or noncurrent cost or pricing data.New number– → 99
15.405-2noneMake-or-buy programs.New number
Same heading as today's 15.407-2
– → 359
15.405-3noneForward pricing rate agreements.New number
Same heading as today's 15.407-3
– → 200
15.405-4noneShould-cost review.New number
Same heading as today's 15.407-4
– → 804
15.406Documentation.Data to support proposal analysis.Changed · 0% alike0 → 777
15.406-1Prenegotiation objectives.noneNot in the overhaul
Same heading at 15.408-1
132 → –
15.406-2Certificate of current cost or pricing data.noneNot in the overhaul540 → –
15.406-3Documenting the negotiation.noneNot in the overhaul
Same heading at 15.408-2
444 → –
15.407Special cost or pricing areas.Price negotiation.Changed · 0% alike0 → 301
15.407-1Defective certified cost or pricing data.noneNot in the overhaul1720 → –
15.407-2Make-or-buy programs.noneNot in the overhaul
Same heading at 15.405-2
1060 → –
15.407-3Forward pricing rate agreements.noneNot in the overhaul
Same heading at 15.405-3
249 → –
15.407-4Should-cost review.noneNot in the overhaul
Same heading at 15.105-6
852 → –
15.407-5Estimating systems.noneNot in the overhaul140 → –
15.408Solicitation provisions and contract clauses.Documentation.Changed · 0% alike4305 → 0
15.408-1nonePrenegotiation objectives.New number
Same heading as today's 15.406-1
– → 89
15.408-2noneDocumenting the negotiation.New number
Same heading as today's 15.406-3
– → 3301
15.500noneScope of subpart.New number– → 18
15.501Definition.Definitions.Changed · 8% alike13 → 145
15.502Applicability.General.Changed · 2% alike52 → 374
15.503Notifications to unsuccessful offerors.Preparing unsolicited proposals.Changed · 0% alike538 → 0
15.503-1noneScope of proposals.New number– → 167
15.503-2noneContent of proposals.New number– → 296
15.503-3noneRestricting use and disclosure of data.New number– → 232
15.504Award to successful offeror.Receipt and initial review of unsolicited proposals.Changed · 10% alike225 → 79
15.504-1noneInitial Review.New number– → 151
15.504-2noneHandling use and disclosure of data restrictions.New number– → 516
15.505Preaward debriefing of offerors.Evaluation of unsolicited proposals.Changed · 7% alike414 → 258
15.506Postaward debriefing of offerors.Criteria for acceptance and negotiation of an unsolicited proposal.Changed · 4% alike458 → 57
15.507Protests against award.noneNot in the overhaul170 → –
15.508Discovery of mistakes.noneNot in the overhaul27 → –
15.509Forms.noneNot in the overhaul76 → –
15.600Scope of subpart.noneNot in the overhaul19 → –
15.601Definitions.noneNot in the overhaul145 → –
15.602Policy.noneNot in the overhaul72 → –
15.603General.noneNot in the overhaul228 → –
15.604Agency points of contact.noneNot in the overhaul198 → –
15.605Content of unsolicited proposals.noneNot in the overhaul298 → –
15.606Agency procedures.noneNot in the overhaul69 → –
15.606-1Receipt and initial review.noneNot in the overhaul159 → –
15.606-2Evaluation.noneNot in the overhaul161 → –
15.607Criteria for acceptance and negotiation of an unsolicited proposal.noneNot in the overhaul169 → –
15.608Prohibitions.noneNot in the overhaul120 → –
15.609Limited use of data.noneNot in the overhaul798 → –