The FAR overhaul, side by side

FAR Part 15: Contracting by Negotiation

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 81 sections, 32,499 words (Part 15 as in force, eCFR as of Oct 29, 2026). Overhaul text: 91 sections, 28,441 words (on acquisition.gov ↗, issued Sep 30, 2025). By number: 1 the same, 44 changed, 36 not in the overhaul (10 with the same heading under another number), 46 new.

15.404-4: Changed (4% alike)

Today: Profit.

This section in plain English

(a) General. This subsection prescribes policies for establishing the profit or fee portion of the Government prenegotiation objective in price negotiations based on cost analysis.

(1) Profit or fee prenegotiation objectives do not necessarily represent net income to contractors. Rather, they represent that element of the potential total remuneration that contractors may receive for contract performance over and above allowable costs. This potential remuneration element and the Government's estimate of allowable costs to be incurred in contract performance together equal the Government's total prenegotiation objective. Just as actual costs may vary from estimated costs, the contractor's actual realized profit or fee may vary from negotiated profit or fee, because of such factors as efficiency of performance, incurrence of costs the Government does not recognize as allowable, and the contract type.

(2) It is in the Government's interest to offer contractors opportunities for financial rewards sufficient to stimulate efficient contract performance, attract the best capabilities of qualified large and small business concerns to Government contracts, and maintain a viable industrial base.

(3) Both the Government and contractors should be concerned with profit as a motivator of efficient and effective contract performance. Negotiations aimed merely at reducing prices by reducing profit, without proper recognition of the function of profit, are not in the Government's interest. Negotiation of extremely low profits, use of historical averages, or automatic application of predetermined percentages to total estimated costs do not provide proper motivation for optimum contract performance.

(b) Policy. (1) Structured approaches (see paragraph (d) of this subsection) for determining profit or fee prenegotiation objectives provide a discipline for ensuring that all relevant factors are considered. Subject to the authorities in 1.301(c), agencies making noncompetitive contract awards over $100,000 totaling $50 million or more a year—

(i) Shall use a structured approach for determining the profit or fee objective in those acquisitions that require cost analysis; and

(ii) May prescribe specific exemptions for situations in which mandatory use of a structured approach would be clearly inappropriate.

(2) Agencies may use another agency's structured approach.

(c) Contracting officer responsibilities. (1) When the price negotiation is not based on cost analysis, contracting officers are not required to analyze profit.

(2) When the price negotiation is based on cost analysis, contracting officers in agencies that have a structured approach shall use it to analyze profit. When not using a structured approach, contracting officers shall comply with paragraph (d)(1) of this subsection in developing profit or fee prenegotiation objectives.

(3) Contracting officers shall use the Government prenegotiation cost objective amounts as the basis for calculating the profit or fee prenegotiation objective. Before applying profit or fee factors, the contracting officer shall exclude from the pre-negotiation cost objective amounts the purchase cost of contractor-acquired property that is categorized as equipment, as defined in FAR 45.101, and where such equipment is to be charged directly to the contract. Before applying profit or fee factors, the contracting officer shall exclude any facilities capital cost of money included in the cost objective amounts. If the prospective contractor fails to identify or propose facilities capital cost of money in a proposal for a contract that will be subject to the cost principles for contracts with commercial organizations (see subpart 31.2), facilities capital cost of money will not be an allowable cost in any resulting contract (see 15.408(i)).

(4)(i) The contracting officer shall not negotiate a price or fee that exceeds the following statutory limitations, imposed by 10 U.S.C. 3322(b) and 41 U.S.C. 3905):

(A) For experimental, developmental, or research work performed under a cost-plus-fixed-fee contract, the fee shall not exceed 15 percent of the contract's estimated cost, excluding fee.

(B) For architect-engineer services for public works or utilities, the contract price or the estimated cost and fee for production and delivery of designs, plans, drawings, and specifications shall not exceed 6 percent of the estimated cost of construction of the public work or utility, excluding fees.

(C) For other cost-plus-fixed-fee contracts, the fee shall not exceed 10 percent of the contract's estimated cost, excluding fee.

(ii) The contracting officer's signature on the price negotiation memorandum or other documentation supporting determination of fair and reasonable price documents the contracting officer's determination that the statutory price or fee limitations have not been exceeded.

(5) The contracting officer shall not require any prospective contractor to submit breakouts or supporting rationale for its profit or fee objective but may consider it, if it is submitted voluntarily.

(6) If a change or modification calls for essentially the same type and mix of work as the basic contract and is of relatively small dollar value compared to the total contract value, the contracting officer may use the basic contract's profit or fee rate as the prenegotiation objective for that change or modification.

(d) Profit-analysis factors—(1) Common factors. Unless it is clearly inappropriate or not applicable, each factor outlined in paragraphs (d)(1)(i) through (vi) of this subsection shall be considered by agencies in developing their structured approaches and by contracting officers in analyzing profit, whether or not using a structured approach.

(i) Contractor effort. This factor measures the complexity of the work and the resources required of the prospective contractor for contract performance. Greater profit opportunity should be provided under contracts requiring a high degree of professional and managerial skill and to prospective contractors whose skills, facilities, and technical assets can be expected to lead to efficient and economical contract performance. The subfactors in paragraphs (d)(1)(i) (A) through (D) of this subsection shall be considered in determining contractor effort, but they may be modified in specific situations to accommodate differences in the categories used by prospective contractors for listing costs—

(A) Material acquisition. This subfactor measures the managerial and technical effort needed to obtain the required purchased parts and material, subcontracted items, and special tooling. Considerations include the complexity of the items required, the number of purchase orders and subcontracts to be awarded and administered, whether established sources are available or new or second sources must be developed, and whether material will be obtained through routine purchase orders or through complex subcontracts requiring detailed specifications. Profit consideration should correspond to the managerial and technical effort involved.

(B) Conversion direct labor. This subfactor measures the contribution of direct engineering, manufacturing, and other labor to converting the raw materials, data, and subcontracted items into the contract items. Considerations include the diversity of engineering, scientific, and manufacturing labor skills required and the amount and quality of supervision and coordination needed to perform the contract task.

(C) Conversion-related indirect costs. This subfactor measures how much the indirect costs contribute to contract performance. The labor elements in the allocable indirect costs should be given the profit consideration they would receive if treated as direct labor. The other elements of indirect costs should be evaluated to determine whether they merit only limited profit consideration because of their routine nature, or are elements that contribute significantly to the proposed contract.

(D) General management. This subfactor measures the prospective contractor's other indirect costs and general and administrative (G&A) expense, their composition, and how much they contribute to contract performance. Considerations include how labor in the overhead pools would be treated if it were direct labor, whether elements within the pools are routine expenses or instead are elements that contribute significantly to the proposed contract, and whether the elements require routine as opposed to unusual managerial effort and attention.

(ii) Contract cost risk. (A) This factor measures the degree of cost responsibility and associated risk that the prospective contractor will assume as a result of the contract type contemplated and considering the reliability of the cost estimate in relation to the complexity and duration of the contract task. Determination of contract type should be closely related to the risks involved in timely, cost-effective, and efficient performance. This factor should compensate contractors proportionately for assuming greater cost risks.

(B) The contractor assumes the greatest cost risk in a closely priced firm-fixed-price contract under which it agrees to perform a complex undertaking on time and at a predetermined price. Some firm-fixed-price contracts may entail substantially less cost risk than others because, for example, the contract task is less complex or many of the contractor's costs are known at the time of price agreement, in which case the risk factor should be reduced accordingly. The contractor assumes the least cost risk in a cost-plus-fixed-fee level-of-effort contract, under which it is reimbursed those costs determined to be allocable and allowable, plus the fixed fee.

(C) In evaluating assumption of cost risk, contracting officers shall, except in unusual circumstances, treat time-and-materials, labor-hour, and firm-fixed-price, level-of-effort term contracts as cost-plus-fixed-fee contracts.

(iii) Federal socioeconomic programs. This factor measures the degree of support given by the prospective contractor to Federal socioeconomic programs, such as those involving small business concerns, small business concerns owned and controlled by socially and economically disadvantaged individuals, women-owned small business concerns, veteran-owned, HUBZone, service-disabled veteran-owned small business concerns, sheltered workshops for workers with disabilities, and energy conservation. Greater profit opportunity should be provided contractors that have displayed unusual initiative in these programs.

(iv) Capital investments. This factor takes into account the contribution of contractor investments to efficient and economical contract performance.

(v) Cost-control and other past accomplishments. This factor allows additional profit opportunities to a prospective contractor that has previously demonstrated its ability to perform similar tasks effectively and economically. In addition, consideration should be given to measures taken by the prospective contractor that result in productivity improvements, and other cost-reduction accomplishments that will benefit the Government in follow-on contracts.

(vi) Independent development. Under this factor, the contractor may be provided additional profit opportunities in recognition of independent development efforts relevant to the contract end item without Government assistance. The contracting officer should consider whether the development cost was recovered directly or indirectly from Government sources.

(2) Additional factors. In order to foster achievement of program objectives, each agency may include additional factors in its structured approach or take them into account in the profit analysis of individual contract actions.

Overhaul text: Technical cost or price analysis.

On acquisition.gov ↗

(a) Labor and materials . At a minimum, the technical analysis must examine the types and quantities of material proposed and the need for the types and quantities of labor hours and the labor mix. Any other data that may be pertinent to an assessment of the offeror's ability to accomplish the technical requirements or to the cost or price analysis of the service or product being proposed should also be included in the analysis.

(b) Technical assistance . Contracting officers should request:

(1) Personnel having specialized knowledge, skills, experience, or capability in engineering, science, or management perform a technical analysis of the proposed types and quantities of materials, labor, processes, special tooling, equipment or real property, the reasonableness of scrap and spoilage, and other associated factors set forth in the proposal(s) in order to determine the need for and reasonableness of the proposed resources, assuming reasonable economy and efficiency.

(2) Technical assistance in evaluating pricing related to items that are “similar to” items being purchased, or commercial products or commercial services that are “of a type”, or requiring minor modifications for commercial products, to ascertain the magnitude of changes required and to assist in pricing the required changes.

Section by section

SectionTodayOverhaul textStatusWords
15.000Scope of part.Scope.Changed · 35% alike28 → 46
15.001Definitions.Definitions.Changed · 75% alike136 → 149
15.002Types of negotiated acquisition.Types of negotiated acquisition.Changed · 47% alike94 → 121
15.100Scope of subpart.Scope.Changed · 17% alike27 → 32
15.101Best value continuum.Early exchanges with industry.Changed · 5% alike95 → 452
15.101-1Tradeoff process.noneNot in the overhaul153 → –
15.101-2Lowest price technically acceptable source selection process.noneNot in the overhaul555 → –
15.101-3Tiered evaluation of small business offers.noneNot in the overhaul28 → –
15.102Oral presentations.Structuring a request for proposals.Changed · 8% alike550 → 330
15.103noneDeveloping a competitive source selection approach.New number– → 82
15.103-1noneTradeoff approach.New number– → 64
15.103-2noneLowest price technically acceptable approach.New number– → 385
15.103-3noneHighest technically rated with a fair and reasonable price approachNew number– → 238
15.103-4nonePhased acquisition.New number– → 101
15.104noneEstablishing competitive evaluation factors and significant subfactors.New number– → 709
15.105noneOther considerations.New number– → 0
15.105-1noneOral presentations.New number– → 76
15.105-2noneNegotiations disclosure.New number– → 50
15.105-3noneLimitation on tiered evaluations for multiple award contracts.New number– → 35
15.105-4noneRequest for cost or pricing data.New number– → 261
15.105-5noneMake-or-buy decision.New number– → 515
15.105-6noneShould-cost review.New number
Same heading as today's 15.407-4
– → 28
15.105-7noneUnit prices.New number– → 55
15.106noneAmending a request for proposal.New number– → 328
15.107noneSubmission, modification, revision, and withdrawal of proposals.New number
Same heading as today's 15.208
– → 593
15.108noneReceiving proposals.New number– → 143
15.109noneUniform contract format.New number– → 74
15.109-1nonePart I - The Schedule.New number– → 317
15.109-2nonePart II - Contract Clauses.New number
Same heading as today's 15.204-3
– → 55
15.109-3nonePart III - List of Documents, Exhibits, and Other Attachments.New number
Same heading as today's 15.204-4
– → 37
15.109-4nonePart IV - Representations and Instructions.New number
Same heading as today's 15.204-5
– → 155
15.110noneSolicitation provisions and contract clauses.New number
Same heading as today's 15.209
– → 1609
15.200Scope of subpart.Scope.Changed · 35% alike36 → 15
15.201Exchanges with industry before receipt of proposals.Source selection responsibilities.Changed · 7% alike527 → 352
15.202Advisory multi-step process.Evaluating competitive proposals.Changed · 9% alike250 → 735
15.203Requests for proposals.Competitive award without negotiation.Changed · 6% alike566 → 64
15.204Contract format.Competitive award with negotiation.Changed · 0% alike93 → 0
15.204-1Uniform contract format.Establishing a competitive range.Changed · 12% alike108 → 139
15.204-2Part I—The Schedule.Competitive negotiations.Changed · 6% alike359 → 409
15.204-3Part II—Contract Clauses.noneNot in the overhaul
Same heading at 15.109-2
61 → –
15.204-4Part III—List of Documents, Exhibits, and Other Attachments.noneNot in the overhaul
Same heading at 15.109-3
37 → –
15.204-5Part IV—Representations and Instructions.noneNot in the overhaul
Same heading at 15.109-4
189 → –
15.205Issuing solicitations.Source selection decision.Changed · 7% alike40 → 72
15.206Amending the solicitation.Preaward notices and debriefings.Changed · 5% alike305 → 69
15.206-1nonePreaward notices.New number– → 189
15.206-2nonePreaward debriefing.New number– → 411
15.207Handling proposals and information.Award.Changed · 0% alike195 → 0
15.207-1noneAward to successful offeror.New number– → 185
15.207-2noneAward notice.New number– → 249
15.208Submission, modification, revision, and withdrawal of proposals.noneNot in the overhaul
Same heading at 15.107
611 → –
15.209Solicitation provisions and contract clauses.noneNot in the overhaul
Same heading at 15.110
509 → –
15.210Forms.noneNot in the overhaul90 → –
15.300Scope of subpart.Scope.Changed · 17% alike17 → 64
15.301[Reserved]Postaward debriefing of offerors.Changed · 0% alike0 → 15
15.301-1noneDebriefing process.New number– → 597
15.301-2noneOpportunity for follow-up questions.New number– → 22
15.302Source selection objective.Protests against award.Changed · 9% alike15 → 169
15.303Responsibilities.Discovery of mistakes.Changed · 6% alike211 → 27
15.304Evaluation factors and significant subfactors.Defective certified cost or pricing data after award.Changed · 5% alike712 → 1622
15.305Proposal evaluation.Estimating systems.Changed · 6% alike703 → 109
15.306Exchanges with offerors after receipt of proposals.noneNot in the overhaul1314 → –
15.307Proposal revisions.noneNot in the overhaul116 → –
15.308Source selection decision.noneNot in the overhaul101 → –
15.400Scope of subpart.Scope of subpart.Changed · 95% alike29 → 28
15.401Definitions.Definitions.Changed · 98% alike57 → 57
15.402Pricing policy.General.Changed · 51% alike440 → 232
15.403Obtaining certified cost or pricing data.Obtaining cost or pricing data.Same0 → 0
15.403-1Prohibition on obtaining certified cost or pricing data (10 U.S.C. chapter 271 and 41 U.S.C. chapter 35).Data other than certified cost or pricing data.Changed · 12% alike1320 → 708
15.403-2Other circumstances where certified cost or pricing data are not required.Prohibitions on obtaining certified cost or pricing data.Changed · 4% alike47 → 1218
15.403-3Requiring data other than certified cost or pricing data.Certified cost or pricing data.Changed · 7% alike847 → 752
15.403-4Requiring certified cost or pricing data (10 U.S.C. chapter 271 and 41 U.S.C. chapter 35).Certificate of current cost or pricing data.Changed · 12% alike809 → 500
15.403-5Instructions for submission of certified cost or pricing data and data other than certified cost or pricing data.noneNot in the overhaul258 → –
15.404Proposal analysis.Cost and/or price analysis.Changed · 0% alike0 → 287
15.404-1Proposal analysis techniques.Price analysis.Changed · 28% alike2546 → 481
15.404-2Data to support proposal analysis.Cost analysis.Changed · 7% alike909 → 411
15.404-3Subcontract pricing considerations.Cost realism analysis.Changed · 9% alike456 → 276
15.404-4Profit.Technical cost or price analysis.Changed · 4% alike1730 → 201
15.404-5noneUnit prices.New number– → 164
15.404-6noneUnbalanced pricing.New number– → 213
15.404-7noneReview and justification of pass-through contracts.New number– → 180
15.404-8noneSubcontract pricing considerations.New number– → 467
15.404-9noneProfit.New number– → 1489
15.405Price negotiation.Special cost or pricing areas.Changed · 0% alike369 → 0
15.405-1noneInaccurate, incomplete, or noncurrent cost or pricing data.New number– → 99
15.405-2noneMake-or-buy programs.New number
Same heading as today's 15.407-2
– → 359
15.405-3noneForward pricing rate agreements.New number
Same heading as today's 15.407-3
– → 200
15.405-4noneShould-cost review.New number
Same heading as today's 15.407-4
– → 804
15.406Documentation.Data to support proposal analysis.Changed · 0% alike0 → 777
15.406-1Prenegotiation objectives.noneNot in the overhaul
Same heading at 15.408-1
132 → –
15.406-2Certificate of current cost or pricing data.noneNot in the overhaul540 → –
15.406-3Documenting the negotiation.noneNot in the overhaul
Same heading at 15.408-2
444 → –
15.407Special cost or pricing areas.Price negotiation.Changed · 0% alike0 → 301
15.407-1Defective certified cost or pricing data.noneNot in the overhaul1720 → –
15.407-2Make-or-buy programs.noneNot in the overhaul
Same heading at 15.405-2
1060 → –
15.407-3Forward pricing rate agreements.noneNot in the overhaul
Same heading at 15.405-3
249 → –
15.407-4Should-cost review.noneNot in the overhaul
Same heading at 15.105-6
852 → –
15.407-5Estimating systems.noneNot in the overhaul140 → –
15.408Solicitation provisions and contract clauses.Documentation.Changed · 0% alike4305 → 0
15.408-1nonePrenegotiation objectives.New number
Same heading as today's 15.406-1
– → 89
15.408-2noneDocumenting the negotiation.New number
Same heading as today's 15.406-3
– → 3301
15.500noneScope of subpart.New number– → 18
15.501Definition.Definitions.Changed · 8% alike13 → 145
15.502Applicability.General.Changed · 2% alike52 → 374
15.503Notifications to unsuccessful offerors.Preparing unsolicited proposals.Changed · 0% alike538 → 0
15.503-1noneScope of proposals.New number– → 167
15.503-2noneContent of proposals.New number– → 296
15.503-3noneRestricting use and disclosure of data.New number– → 232
15.504Award to successful offeror.Receipt and initial review of unsolicited proposals.Changed · 10% alike225 → 79
15.504-1noneInitial Review.New number– → 151
15.504-2noneHandling use and disclosure of data restrictions.New number– → 516
15.505Preaward debriefing of offerors.Evaluation of unsolicited proposals.Changed · 7% alike414 → 258
15.506Postaward debriefing of offerors.Criteria for acceptance and negotiation of an unsolicited proposal.Changed · 4% alike458 → 57
15.507Protests against award.noneNot in the overhaul170 → –
15.508Discovery of mistakes.noneNot in the overhaul27 → –
15.509Forms.noneNot in the overhaul76 → –
15.600Scope of subpart.noneNot in the overhaul19 → –
15.601Definitions.noneNot in the overhaul145 → –
15.602Policy.noneNot in the overhaul72 → –
15.603General.noneNot in the overhaul228 → –
15.604Agency points of contact.noneNot in the overhaul198 → –
15.605Content of unsolicited proposals.noneNot in the overhaul298 → –
15.606Agency procedures.noneNot in the overhaul69 → –
15.606-1Receipt and initial review.noneNot in the overhaul159 → –
15.606-2Evaluation.noneNot in the overhaul161 → –
15.607Criteria for acceptance and negotiation of an unsolicited proposal.noneNot in the overhaul169 → –
15.608Prohibitions.noneNot in the overhaul120 → –
15.609Limited use of data.noneNot in the overhaul798 → –