The FAR overhaul, side by side
FAR Part 48: Value Engineering
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 13 sections, 4,334 words (Part 48 as in force, eCFR as of Oct 29, 2026). Overhaul text: 5 sections, 1,454 words (on acquisition.gov ↗, issued Aug 28, 2025). By number: 0 the same, 5 changed, 8 not in the overhaul, 0 new.
48.105: Not in the overhaul
Today: Relationship to other incentives.
Contractors should be offered the fullest possible range of motivation, yet the benefits of an accepted VECP should not be rewarded both as value engineering shares and under performance, design-to-cost, or similar incentives of the contract. To that end, when performance, design-to-cost, or similar targets are set and incentivized, the targets of such incentives affected by the VECP are not to be adjusted because of the acceptance of the VECP. Only those benefits of an accepted VECP not rewardable under other incentives are rewarded under a value engineering clause.
Overhaul text
No section with this number.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 48.000 | Scope of part. | none | Not in the overhaul | 15 → – |
| 48.001 | Definitions. | Definitions. | Changed · 90% alike | 771 → 630 |
| 48.101 | General. | General. | Changed · 18% alike | 274 → 36 |
| 48.102 | Policies. | Policies. | Changed · 36% alike | 544 → 173 |
| 48.103 | Processing value engineering change proposals. | none | Not in the overhaul | 314 → – |
| 48.104 | Sharing arrangements. | none | Not in the overhaul | 0 → – |
| 48.104-1 | Determining sharing period. | none | Not in the overhaul | 339 → – |
| 48.104-2 | Sharing acquisition savings. | none | Not in the overhaul | 744 → – |
| 48.104-3 | Sharing collateral savings. | none | Not in the overhaul | 128 → – |
| 48.104-4 | Sharing alternative—no-cost settlement method. | none | Not in the overhaul | 149 → – |
| 48.105 | Relationship to other incentives. | none | Not in the overhaul | 93 → – |
| 48.201 | Clauses for supply or service contracts. | Clauses for supply or service contracts. | Changed · 54% alike | 854 → 551 |
| 48.202 | Clause for construction contracts. | Clause for construction contracts. | Changed · 50% alike | 109 → 64 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress