The FAR overhaul, side by side

FAR Part 48: Value Engineering

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 13 sections, 4,334 words (Part 48 as in force, eCFR as of Oct 29, 2026). Overhaul text: 5 sections, 1,454 words (on acquisition.gov ↗, issued Aug 28, 2025). By number: 0 the same, 5 changed, 8 not in the overhaul, 0 new.

48.101: Changed (18% alike)

Today: General.

This section in plain English

(a) Value engineering is the formal technique by which contractors may (1) voluntarily suggest methods for performing more economically and share in any resulting savings or (2) be required to establish a program to identify and submit to the Government methods for performing more economically. Value engineering attempts to eliminate, without impairing essential functions or characteristics, anything that increases acquisition, operation, or support costs.

(b) There are two value engineering approaches:

(1) The first is an incentive approach in which contractor participation is voluntary and the contractor uses its own resources to develop and submit any value engineering change proposals (VECP's). The contract provides for sharing of savings and for payment of the contractor's allowable development and implementation costs only if a VECP is accepted. This voluntary approach should not in itself increase costs to the Government.

(2) The second approach is a mandatory program in which the Government requires and pays for a specific value engineering program effort. The contractor must perform value engineering of the scope and level of effort required by the Government's program plan and included as a separately priced item of work in the contract Schedule. No value engineering (VE) sharing is permitted in architect-engineer contracts. All other contracts with a program clause share in savings on accepted VECP's, but at a lower percentage rate than under the voluntary approach. The objective of this value engineering program requirement is to ensure that the contractor's value engineering effort is applied to areas of the contract that offer opportunities for considerable savings consistent with the functional requirements of the end item of the contract.

Overhaul text: General.

On acquisition.gov ↗

Value engineering is a formal technique where contractors may (1) voluntarily suggest more economical methods and share resulting savings or (2) be required to create programs to identify and submit more economical methods to the Government.

Section by section

SectionTodayOverhaul textStatusWords
48.000Scope of part.noneNot in the overhaul15 → –
48.001Definitions.Definitions.Changed · 90% alike771 → 630
48.101General.General.Changed · 18% alike274 → 36
48.102Policies.Policies.Changed · 36% alike544 → 173
48.103Processing value engineering change proposals.noneNot in the overhaul314 → –
48.104Sharing arrangements.noneNot in the overhaul0 → –
48.104-1Determining sharing period.noneNot in the overhaul339 → –
48.104-2Sharing acquisition savings.noneNot in the overhaul744 → –
48.104-3Sharing collateral savings.noneNot in the overhaul128 → –
48.104-4Sharing alternative—no-cost settlement method.noneNot in the overhaul149 → –
48.105Relationship to other incentives.noneNot in the overhaul93 → –
48.201Clauses for supply or service contracts.Clauses for supply or service contracts.Changed · 54% alike854 → 551
48.202Clause for construction contracts.Clause for construction contracts.Changed · 50% alike109 → 64