Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 13 sections, 4,334 words (Part 48 as in force, eCFR as of Oct 29, 2026). Overhaul text: 5 sections, 1,454 words (on acquisition.gov ↗, issued Aug 28, 2025). By number: 0 the same, 5 changed, 8 not in the overhaul, 0 new.
48.101: Changed (18% alike)
Today: General.
(a) Value engineering is the formal technique by which contractors may (1) voluntarily suggest methods for performing more economically and share in any resulting savings or (2) be required to establish a program to identify and submit to the Government methods for performing more economically. Value engineering attempts to eliminate, without impairing essential functions or characteristics, anything that increases acquisition, operation, or support costs.
(b) There are two value engineering approaches:
(1) The first is an incentive approach in which contractor participation is voluntary and the contractor uses its own resources to develop and submit any value engineering change proposals (VECP's). The contract provides for sharing of savings and for payment of the contractor's allowable development and implementation costs only if a VECP is accepted. This voluntary approach should not in itself increase costs to the Government.
(2) The second approach is a mandatory program in which the Government requires and pays for a specific value engineering program effort. The contractor must perform value engineering of the scope and level of effort required by the Government's program plan and included as a separately priced item of work in the contract Schedule. No value engineering (VE) sharing is permitted in architect-engineer contracts. All other contracts with a program clause share in savings on accepted VECP's, but at a lower percentage rate than under the voluntary approach. The objective of this value engineering program requirement is to ensure that the contractor's value engineering effort is applied to areas of the contract that offer opportunities for considerable savings consistent with the functional requirements of the end item of the contract.
Overhaul text: General.
Value engineering is a formal technique where contractors may (1) voluntarily suggest more economical methods and share resulting savings or (2) be required to create programs to identify and submit more economical methods to the Government.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 48.000 | Scope of part. | none | Not in the overhaul | 15 → – |
| 48.001 | Definitions. | Definitions. | Changed · 90% alike | 771 → 630 |
| 48.101 | General. | General. | Changed · 18% alike | 274 → 36 |
| 48.102 | Policies. | Policies. | Changed · 36% alike | 544 → 173 |
| 48.103 | Processing value engineering change proposals. | none | Not in the overhaul | 314 → – |
| 48.104 | Sharing arrangements. | none | Not in the overhaul | 0 → – |
| 48.104-1 | Determining sharing period. | none | Not in the overhaul | 339 → – |
| 48.104-2 | Sharing acquisition savings. | none | Not in the overhaul | 744 → – |
| 48.104-3 | Sharing collateral savings. | none | Not in the overhaul | 128 → – |
| 48.104-4 | Sharing alternative—no-cost settlement method. | none | Not in the overhaul | 149 → – |
| 48.105 | Relationship to other incentives. | none | Not in the overhaul | 93 → – |
| 48.201 | Clauses for supply or service contracts. | Clauses for supply or service contracts. | Changed · 54% alike | 854 → 551 |
| 48.202 | Clause for construction contracts. | Clause for construction contracts. | Changed · 50% alike | 109 → 64 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress