The FAR overhaul, side by side

FAR Part 48: Value Engineering

Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.

Today: 13 sections, 4,334 words (Part 48 as in force, eCFR as of Oct 29, 2026). Overhaul text: 5 sections, 1,454 words (on acquisition.gov ↗, issued Aug 28, 2025). By number: 0 the same, 5 changed, 8 not in the overhaul, 0 new.

48.104-1: Not in the overhaul

Today: Determining sharing period.

This section in plain English

(a) Contracting officers must determine discrete sharing periods for each VECP. If more than one VECP is incorporated into a contract, the sharing period for each VECP need not be identical.

(b) The sharing period begins with acceptance of the first unit incorporating the VECP. Except as provided in paragraph (c) of this section, the end of the sharing period is a specific calendar date that is the later of—

(1) 36 to 60 consecutive months (set at the discretion of the contracting officer for each VECP) after the first unit affected by the VECP is accepted; or

(2) The last scheduled delivery date of an item affected by the VECP under the instant contract delivery schedule in effect at the time the VECP is accepted.

(c) For engineering-development contracts and contracts containing low-rate-initial-production or early production units, the end of the sharing period is based not on a calendar date, but on acceptance of a specified quantity of future contract units. This quantity is the number of units affected by the VECP that are scheduled to be delivered over a period of between 36 and 60 consecutive months (set at the discretion of the contracting officer for each VECP) that spans the highest planned production, based on planning and programming or production documentation at the time the VECP is accepted. The specified quantity begins with the first future contract unit affected by the VECP and continues over consecutive deliveries until the sharing period ends at acceptance of the last of the specified quantity of units.

(d) For contracts (other than those in paragraph (c) of this subsection) for items requiring a prolonged production schedule (e.g., ship construction, major system acquisition), the end of the sharing period is determined according to paragraph (b) of this subsection. Agencies may prescribe sharing of future contract savings on all future contract units to be delivered under contracts awarded within the sharing period for essentially the same item, even if the scheduled delivery date is outside the sharing period.

Overhaul text

No section with this number.

Section by section

SectionTodayOverhaul textStatusWords
48.000Scope of part.noneNot in the overhaul15 → –
48.001Definitions.Definitions.Changed · 90% alike771 → 630
48.101General.General.Changed · 18% alike274 → 36
48.102Policies.Policies.Changed · 36% alike544 → 173
48.103Processing value engineering change proposals.noneNot in the overhaul314 → –
48.104Sharing arrangements.noneNot in the overhaul0 → –
48.104-1Determining sharing period.noneNot in the overhaul339 → –
48.104-2Sharing acquisition savings.noneNot in the overhaul744 → –
48.104-3Sharing collateral savings.noneNot in the overhaul128 → –
48.104-4Sharing alternative—no-cost settlement method.noneNot in the overhaul149 → –
48.105Relationship to other incentives.noneNot in the overhaul93 → –
48.201Clauses for supply or service contracts.Clauses for supply or service contracts.Changed · 54% alike854 → 551
48.202Clause for construction contracts.Clause for construction contracts.Changed · 50% alike109 → 64