The FAR overhaul, side by side
FAR Part 31: Contract Cost Principles and Procedures
Not in force. The overhaul text is the FAR Council's rewrite, which agencies adopt by class deviation while the rules are being made. It is not the regulation in force and can still change: today's FAR is what applies unless your contract or the agency's deviation says otherwise.
Today: 87 sections, 30,986 words (Part 31 as in force, eCFR as of Oct 29, 2026). Overhaul text: 89 sections, 29,337 words (on acquisition.gov ↗, issued Jul 17, 2025). By number: 15 the same, 72 changed, 0 not in the overhaul, 2 new.
31.203: Changed (95% alike)
Today: Indirect costs.
(a) For contracts subject to full CAS coverage, allocation of indirect costs shall be based on the applicable provisions. For all other contracts, the applicable CAS provisions in paragraphs (b) through (h) of this section apply.
(b) After direct costs have been determined and charged directly to the contract or other work, indirect costs are those remaining to be allocated to intermediate or two or more final cost objectives. No final cost objective shall have allocated to it as an indirect cost any cost, if other costs incurred for the same purpose, in like circumstances, have been included as a direct cost of that or any other final cost objective.
(c) The contractor shall accumulate indirect costs by logical cost groupings with due consideration of the reasons for incurring such costs. The contractor shall determine each grouping so as to permit use of an allocation base that is common to all cost objectives to which the grouping is to be allocated. The base selected shall allocate the grouping on the basis of the benefits accruing to intermediate and final cost objectives. When substantially the same results can be achieved through less precise methods, the number and composition of cost groupings should be governed by practical considerations and should not unduly complicate the allocation.
(d) Once an appropriate base for allocating indirect costs has been accepted, the contractor shall not fragment the base by removing individual elements. All items properly includable in an indirect cost base shall bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs. For example, when a cost input base is used for the allocation of G&A costs, the contractor shall include in the base all items that would properly be part of the cost input base, whether allowable or unallowable, and these items shall bear their pro rata share of G&A costs.
(e) The method of allocating indirect costs may require revision when there is a significant change in the nature of the business, the extent of subcontracting, fixed-asset improvement programs, inventories, the volume of sales and production, manufacturing processes, the contractor's products, or other relevant circumstances.
(f) Separate cost groupings for costs allocable to offsite locations may be necessary to permit equitable distribution of costs on the basis of the benefits accruing to the several cost objectives.
(g) A base period for allocating indirect costs is the cost accounting period during which such costs are incurred and accumulated for allocation to work performed in that period.
(1) For contracts subject to full or modified CAS coverage, the contractor shall follow the criteria and guidance in 48 CFR 9904.406 for selecting the cost accounting periods to be used in allocating indirect costs.
(2) For contracts other than those subject to paragraph (g)(1) of this section, the base period for allocating indirect costs shall be the contractor's fiscal year used for financial reporting purposes in accordance with generally accepted accounting principles. The fiscal year will normally be 12 months, but a different period may be appropriate (e.g., when a change in fiscal year occurs due to a business combination or other circumstances).
(h) Special care should be exercised in applying the principles of paragraphs (c), (d), and (e) of this section when Government-owned contractor-operated (GOCO) plants are involved. The distribution of corporate, division or branch office G&A expenses to such plants operating with little or no dependence on corporate administrative activities may require more precise cost groupings, detailed accounts screening, and carefully developed distribution bases.
(i) Indirect costs that meet the definition of “excessive pass-through charge” in 52.215-23, are unallowable.
Overhaul text: Indirect costs.
(a)
(1) For contracts subject to full CAS coverage, allocation of indirect costs must be based on the applicable CAS regulations.
(2) For all other contracts, paragraphs (b) through (h) of this section apply.
(b)
(1) After direct costs have been determined and charged directly to the contract or other work, indirect costs are those remaining to be allocated to intermediate or two or more final cost objectives.
(2) No final cost objective must have allocated to it as an indirect cost any cost, if other costs incurred for the same purpose, in like circumstances, have been included as a direct cost of that or any other final cost objective.
(c)
(1) The contractor must accumulate indirect costs by logical cost groupings with due consideration of the reasons for incurring such costs.
(2) The contractor must determine each grouping so as to permit use of an allocation base that is common to all cost objectives to which the grouping is to be allocated.
(3) The base selected must allocate the grouping on the basis of the benefits accruing to intermediate and final cost objectives.
(4) When substantially the same results can be achieved through less precise methods, the number and composition of cost groupings should be governed by practical considerations and should not unduly complicate the allocation.
(d)
(1) Once an appropriate base for allocating indirect costs has been accepted, the contractor must not fragment the base by removing individual elements.
(2) All items properly includable in an indirect cost base must bear a pro rata share of indirect costs irrespective of their acceptance as Government contract costs ( e.g. , when a cost input base is used for the allocation of general and administrative (G&A) costs, the contractor must include in the base all items that would properly be part of the cost input base, whether allowable or unallowable, and these items must bear their pro rata share of G&A costs).
(e) The method of allocating indirect costs may require revision when there is a significant change in the nature of the business, the extent of subcontracting, fixed-asset improvement programs, inventories, the volume of sales and production, manufacturing processes, the contractor’s products, or other relevant circumstances.
(f) Separate cost groupings for costs allocable to offsite locations may be necessary to permit equitable distribution of costs on the basis of the benefits accruing to the several cost objectives.
(g) A base period for allocating indirect costs is the cost accounting period during which such costs are incurred and accumulated for allocation to work performed in that period.
(1) For contracts subject to full or modified CAS coverage, the contractor shall follow the criteria and guidance in 48 CFR 9904.406 for selecting the cost accounting periods to be used in allocating indirect costs.
(2) The base period for allocating indirect costs must be the contractor's fiscal year used for financial reporting purposes in accordance with generally accepted accounting principles.
(3) The fiscal year will normally be 12 months, but a different period may be appropriate (e.g., when a change in fiscal year occurs due to a business combination or other circumstances).
(h) Special care should be exercised in applying the principles of paragraphs (c), (d), and (e) of this section when Government-owned contractor-operated (GOCO) plants are involved. The distribution of corporate, division or branch office G&A expenses to such plants operating with little or no dependence on corporate administrative activities may require more precise cost groupings, detailed accounts screening, and carefully developed distribution bases.
(i) Indirect costs that meet the definition of excessive pass-through charge in 52.215-23, are unallowable.
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 31.000 | Scope of part. | Scope of part. | Same | 44 → 44 |
| 31.001 | Definitions. | Applicability. | Changed · 1% alike | 2375 → 36 |
| 31.002 | Availability of accounting guide. | Definitions. | Changed · 1% alike | 38 → 1901 |
| 31.003 | none | Availability of accounting guide. | New number | – → 32 |
| 31.004 | none | Deviations. | New number | – → 58 |
| 31.100 | Scope of subpart. | Scope of subpart. | Changed · 48% alike | 32 → 52 |
| 31.101 | Objectives. | [Reserved] | Changed · 0% alike | 134 → 0 |
| 31.102 | Fixed-price contracts. | Fixed-price contracts. | Changed · 81% alike | 118 → 95 |
| 31.103 | Contracts with commercial organizations. | Contracts with commercial organizations. | Changed · 91% alike | 221 → 200 |
| 31.104 | Contracts with educational institutions. | Contracts with educational institutions. | Changed · 91% alike | 134 → 129 |
| 31.105 | Construction and architect-engineer contracts. | Construction and architect-engineer contracts. | Changed · 74% alike | 941 → 908 |
| 31.106 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.107 | Contracts with State, local, and federally recognized Indian tribal governments. | Contracts with State, local, and federally recognized Indian tribal governments. | Changed · 78% alike | 125 → 95 |
| 31.108 | Contracts with nonprofit organizations. | Contracts with nonprofit organizations. | Changed · 98% alike | 73 → 76 |
| 31.109 | Advance agreements. | Indirect cost rate certification and penalties on unallowable costs. | Changed · 3% alike | 678 → 41 |
| 31.110 | Indirect cost rate certification and penalties on unallowable costs. | Advance agreements. | Changed · 5% alike | 63 → 528 |
| 31.201 | General. | General. | Same | 0 → 0 |
| 31.201-1 | Composition of total cost. | Composition of total cost. | Changed · 93% alike | 111 → 108 |
| 31.201-2 | Determining allowability. | Determining allowability. | Changed · 95% alike | 290 → 292 |
| 31.201-3 | Determining reasonableness. | Determining reasonableness. | Changed · 72% alike | 201 → 186 |
| 31.201-4 | Determining allocability. | Determining allocability. | Changed · 85% alike | 92 → 83 |
| 31.201-5 | Credits. | Credits. | Changed · 55% alike | 60 → 57 |
| 31.201-6 | Accounting for unallowable costs. | Accounting for unallowable costs. | Changed · 93% alike | 765 → 745 |
| 31.201-7 | Construction and architect-engineer contracts. | Construction and architect-engineer contracts. | Changed · 80% alike | 42 → 28 |
| 31.202 | Direct costs. | Direct costs. | Changed · 97% alike | 138 → 141 |
| 31.203 | Indirect costs. | Indirect costs. | Changed · 95% alike | 611 → 608 |
| 31.204 | Application of principles and procedures. | Application of principles and procedures. | Changed · 89% alike | 320 → 288 |
| 31.205 | Selected costs. | Selected costs. | Same | 0 → 0 |
| 31.205-1 | Public relations and advertising costs. | Public relations and advertising costs. | Changed · 95% alike | 726 → 704 |
| 31.205-2 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-3 | Bad debts. | Bad debts. | Same | 32 → 32 |
| 31.205-4 | Bonding costs. | Bonding costs. | Changed · 90% alike | 105 → 105 |
| 31.205-5 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-6 | Compensation for personal services. | Compensation for personal services. | Changed · 88% alike | 5911 → 5798 |
| 31.205-7 | Contingencies. | Contingencies. | Changed · 95% alike | 243 → 241 |
| 31.205-8 | Contributions or donations. | Contributions or donations. | Changed · 86% alike | 22 → 20 |
| 31.205-9 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-10 | Cost of money. | Cost of money. | Changed · 98% alike | 180 → 182 |
| 31.205-11 | Depreciation. | Depreciation. | Changed · 91% alike | 855 → 818 |
| 31.205-12 | Economic planning costs. | Economic planning costs. | Changed · 92% alike | 81 → 84 |
| 31.205-13 | Employee morale, health, welfare, food service, and dormitory costs and credits. | Employee morale, health, welfare, food service, and dormitory costs and credits. | Changed · 96% alike | 500 → 492 |
| 31.205-14 | Entertainment costs. | Entertainment costs. | Changed · 75% alike | 75 → 77 |
| 31.205-15 | Fines, penalties, and mischarging costs. | Fines, penalties, and mischarging costs. | Same | 126 → 126 |
| 31.205-16 | Gains and losses on disposition or impairment of depreciable property or other capital assets. | Gains and losses on disposition or impairment of depreciable property or other capital assets. | Changed · 94% alike | 733 → 737 |
| 31.205-17 | Idle facilities and idle capacity costs. | Idle facilities and idle capacity costs. | Changed · 97% alike | 376 → 383 |
| 31.205-18 | Independent research and development and bid and proposal costs. | Independent research and development and bid and proposal costs. | Changed · 91% alike | 1099 → 1041 |
| 31.205-19 | Insurance and indemnification. | Insurance and indemnification. | Changed · 94% alike | 864 → 824 |
| 31.205-20 | Interest and other financial costs. | Interest and other financial costs. | Changed · 79% alike | 64 → 78 |
| 31.205-21 | Labor relations costs. | Labor relations costs. | Changed · 92% alike | 149 → 127 |
| 31.205-22 | Lobbying and political activity costs. | Lobbying and political activity costs. | Changed · 94% alike | 590 → 563 |
| 31.205-23 | Losses on other contracts. | Losses on other contracts. | Changed · 63% alike | 22 → 16 |
| 31.205-24 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-25 | Manufacturing and production engineering costs. | Manufacturing and production engineering costs. | Changed · 88% alike | 214 → 183 |
| 31.205-26 | Material costs. | Material costs. | Changed · 97% alike | 409 → 413 |
| 31.205-27 | Organization costs. | Organization costs. | Changed · 94% alike | 193 → 193 |
| 31.205-28 | Other business expenses. | Other business expenses. | Same | 66 → 66 |
| 31.205-29 | Plant protection costs. | Plant protection costs. | Changed · 82% alike | 34 → 32 |
| 31.205-30 | Patent costs. | Patent costs. | Changed · 90% alike | 125 → 116 |
| 31.205-31 | Plant reconversion costs. | Plant reconversion costs. | Changed · 89% alike | 96 → 104 |
| 31.205-32 | Precontract costs. | Precontract costs. | Changed · 97% alike | 61 → 61 |
| 31.205-33 | Professional and consultant service costs. | Professional and consultant service costs. | Changed · 93% alike | 709 → 673 |
| 31.205-34 | Recruitment costs. | Recruitment costs. | Changed · 85% alike | 117 → 110 |
| 31.205-35 | Relocation costs. | Relocation costs. | Changed · 94% alike | 1191 → 1179 |
| 31.205-36 | Rental costs. | Rental costs. | Changed · 94% alike | 295 → 303 |
| 31.205-37 | Royalties and other costs for use of patents. | Royalties and other costs for use of patents. | Changed · 93% alike | 190 → 181 |
| 31.205-38 | Selling costs. | Selling costs. | Changed · 95% alike | 347 → 349 |
| 31.205-39 | Service and warranty costs. | Service and warranty costs. | Changed · 96% alike | 76 → 78 |
| 31.205-40 | Special tooling and special test equipment costs. | Special tooling and special test equipment costs. | Changed · 52% alike | 165 → 129 |
| 31.205-41 | Taxes. | Taxes. | Changed · 87% alike | 786 → 749 |
| 31.205-42 | Termination costs. | Termination costs. | Changed · 91% alike | 943 → 917 |
| 31.205-43 | Trade, business, technical, and professional activity costs. | Trade, business, technical, and professional activity costs. | Changed · 99% alike | 143 → 143 |
| 31.205-44 | Training and education costs. | Training and education costs. | Changed · 97% alike | 207 → 206 |
| 31.205-45 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-46 | Travel costs. | Travel costs. | Changed · 84% alike | 1235 → 1112 |
| 31.205-47 | Costs related to legal and other proceedings. | Costs related to legal and other proceedings. | Changed · 91% alike | 1460 → 1394 |
| 31.205-48 | Research and development costs. | Research and development costs. | Changed · 95% alike | 63 → 66 |
| 31.205-49 | Goodwill. | Goodwill. | Changed · 94% alike | 81 → 87 |
| 31.205-50 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-51 | Costs of alcoholic beverages. | Costs of alcoholic beverages. | Same | 6 → 6 |
| 31.205-52 | Asset valuations resulting from business combinations. | Asset valuations resulting from business combinations. | Changed · 98% alike | 104 → 104 |
| 31.301 | Purpose. | Purpose. | Changed · 82% alike | 26 → 23 |
| 31.302 | General. | General. | Changed · 70% alike | 60 → 32 |
| 31.303 | Requirements. | Requirements. | Changed · 84% alike | 96 → 73 |
| 31.601 | Purpose. | Purpose. | Changed · 90% alike | 22 → 27 |
| 31.602 | General. | General. | Same | 68 → 68 |
| 31.603 | Requirements. | Requirements. | Changed · 94% alike | 780 → 758 |
| 31.701 | Purpose. | Definition. | Changed · 84% alike | 110 → 82 |
| 31.702 | General. | General. | Changed · 94% alike | 63 → 56 |
| 31.703 | Requirements. | Requirements. | Changed · 95% alike | 86 → 85 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.
- Agencies adopt the overhaul by their own class deviations, some with changes: check the agency's deviation and the clauses in your contract.
- Not legal advice. FAR rule changes in progress