31.205-17: Changed (97% alike)
Today: Idle facilities and idle capacity costs.
(a) Definitions. As used in this subsection—
Costs of idle facilities or idle capacity means costs such as maintenance, repair, housing, rent, and other related costs; e.g., property taxes, insurance, and depreciation.
Facilities means plant or any portion thereof (including land integral to the operation), equipment, individually or collectively, or any other tangible capital asset, wherever located, and whether owned or leased by the contractor.
Idle capacity means the unused capacity of partially used facilities. It is the difference between that which a facility could achieve under 100 percent operating time on a one-shift basis, less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays, and the extent to which the facility was actually used to meet demands during the accounting period. A multiple-shift basis may be used in the calculation instead of a one-shift basis if it can be shown that this amount of usage could normally be expected for the type of facility involved.
Idle facilities means completely unused facilities that are excess to the contractor's current needs.
(b) The costs of idle facilities are unallowable unless the facilities—
(1) Are necessary to meet fluctuations in workload; or
(2) Were necessary when acquired and are now idle because of changes in requirements, production economies, reorganization, termination, or other causes which could not have been reasonably foreseen. (Costs of idle facilities are allowable for a reasonable period, ordinarily not to exceed 1 year, depending upon the initiative taken to use, lease, or dispose of the idle facilities (but see 31.205-42)).
(c) Costs of idle capacity are costs of doing business and are a factor in the normal fluctuations of usage or overhead rates from period to period. Such costs are allowable provided the capacity is necessary or was originally reasonable and is not subject to reduction or elimination by subletting, renting, or sale, in accordance with sound business, economics, or security practices. Widespread idle capacity throughout an entire plant or among a group of assets having substantially the same function may be idle facilities.
(d) Any costs to be paid directly by the Government for idle facilities or idle capacity reserved for defense mobilization production shall be the subject of a separate agreement.
Overhaul text: Idle facilities and idle capacity costs.
(a) Definitions . As used in this section—
Costs of idle facilities or idle capacity means costs such as maintenance, repair, housing, rent, and other related costs ( e.g., property taxes, insurance, and depreciation).
Facilities means plant or any portion thereof (including land integral to the operation), equipment, individually or collectively, or any other tangible capital asset, wherever located, and whether owned or leased by the contractor.
Idle capacity means the unused capacity of partially used facilities. It is the difference between that which a facility could achieve under 100 percent operating time on a one-shift basis, less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays, and the extent to which the facility was actually used to meet demands during the accounting period. A multiple-shift basis may be used in the calculation instead of a one-shift basis if it can be shown that this amount of usage could normally be expected for the type of facility involved.
Idle facilities means completely unused facilities that are excess to the contractor’s current needs.
(b) The costs of idle facilities are unallowable unless the facilities—
(1) Are necessary to meet fluctuations in workload; or
(2) Were necessary when acquired and are now idle because of changes in requirements, production economies, reorganization, termination, or other causes that could not have been reasonably foreseen. (Costs of idle facilities are allowable for a reasonable period, ordinarily not to exceed one year, depending upon the initiative taken to use, lease, or dispose of the idle facilities (except see 31.205-42)).
(c) Costs of idle capacity are costs of doing business and are a factor in the normal fluctuations of usage or overhead rates from period to period. Such costs are allowable when the capacity is necessary or was originally reasonable and is not subject to reduction or elimination by subletting, renting, or sale, in accordance with sound business, economics, or security practices. Widespread idle capacity throughout an entire plant or among a group of assets having substantially the same function may be idle facilities.
(d) Any costs to be paid directly by the Government for idle facilities, or idle capacity reserved for defense mobilization production must be the subject of a separate agreement (see 31.110(b)(9)).
Section by section
| Section | Today | Overhaul text | Status | Words |
|---|---|---|---|---|
| 31.000 | Scope of part. | Scope of part. | Same | 44 → 44 |
| 31.001 | Definitions. | Applicability. | Changed · 1% alike | 2375 → 36 |
| 31.002 | Availability of accounting guide. | Definitions. | Changed · 1% alike | 38 → 1901 |
| 31.003 | none | Availability of accounting guide. | New number | – → 32 |
| 31.004 | none | Deviations. | New number | – → 58 |
| 31.100 | Scope of subpart. | Scope of subpart. | Changed · 48% alike | 32 → 52 |
| 31.101 | Objectives. | [Reserved] | Changed · 0% alike | 134 → 0 |
| 31.102 | Fixed-price contracts. | Fixed-price contracts. | Changed · 81% alike | 118 → 95 |
| 31.103 | Contracts with commercial organizations. | Contracts with commercial organizations. | Changed · 91% alike | 221 → 200 |
| 31.104 | Contracts with educational institutions. | Contracts with educational institutions. | Changed · 91% alike | 134 → 129 |
| 31.105 | Construction and architect-engineer contracts. | Construction and architect-engineer contracts. | Changed · 74% alike | 941 → 908 |
| 31.106 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.107 | Contracts with State, local, and federally recognized Indian tribal governments. | Contracts with State, local, and federally recognized Indian tribal governments. | Changed · 78% alike | 125 → 95 |
| 31.108 | Contracts with nonprofit organizations. | Contracts with nonprofit organizations. | Changed · 98% alike | 73 → 76 |
| 31.109 | Advance agreements. | Indirect cost rate certification and penalties on unallowable costs. | Changed · 3% alike | 678 → 41 |
| 31.110 | Indirect cost rate certification and penalties on unallowable costs. | Advance agreements. | Changed · 5% alike | 63 → 528 |
| 31.201 | General. | General. | Same | 0 → 0 |
| 31.201-1 | Composition of total cost. | Composition of total cost. | Changed · 93% alike | 111 → 108 |
| 31.201-2 | Determining allowability. | Determining allowability. | Changed · 95% alike | 290 → 292 |
| 31.201-3 | Determining reasonableness. | Determining reasonableness. | Changed · 72% alike | 201 → 186 |
| 31.201-4 | Determining allocability. | Determining allocability. | Changed · 85% alike | 92 → 83 |
| 31.201-5 | Credits. | Credits. | Changed · 55% alike | 60 → 57 |
| 31.201-6 | Accounting for unallowable costs. | Accounting for unallowable costs. | Changed · 93% alike | 765 → 745 |
| 31.201-7 | Construction and architect-engineer contracts. | Construction and architect-engineer contracts. | Changed · 80% alike | 42 → 28 |
| 31.202 | Direct costs. | Direct costs. | Changed · 97% alike | 138 → 141 |
| 31.203 | Indirect costs. | Indirect costs. | Changed · 95% alike | 611 → 608 |
| 31.204 | Application of principles and procedures. | Application of principles and procedures. | Changed · 89% alike | 320 → 288 |
| 31.205 | Selected costs. | Selected costs. | Same | 0 → 0 |
| 31.205-1 | Public relations and advertising costs. | Public relations and advertising costs. | Changed · 95% alike | 726 → 704 |
| 31.205-2 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-3 | Bad debts. | Bad debts. | Same | 32 → 32 |
| 31.205-4 | Bonding costs. | Bonding costs. | Changed · 90% alike | 105 → 105 |
| 31.205-5 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-6 | Compensation for personal services. | Compensation for personal services. | Changed · 88% alike | 5911 → 5798 |
| 31.205-7 | Contingencies. | Contingencies. | Changed · 95% alike | 243 → 241 |
| 31.205-8 | Contributions or donations. | Contributions or donations. | Changed · 86% alike | 22 → 20 |
| 31.205-9 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-10 | Cost of money. | Cost of money. | Changed · 98% alike | 180 → 182 |
| 31.205-11 | Depreciation. | Depreciation. | Changed · 91% alike | 855 → 818 |
| 31.205-12 | Economic planning costs. | Economic planning costs. | Changed · 92% alike | 81 → 84 |
| 31.205-13 | Employee morale, health, welfare, food service, and dormitory costs and credits. | Employee morale, health, welfare, food service, and dormitory costs and credits. | Changed · 96% alike | 500 → 492 |
| 31.205-14 | Entertainment costs. | Entertainment costs. | Changed · 75% alike | 75 → 77 |
| 31.205-15 | Fines, penalties, and mischarging costs. | Fines, penalties, and mischarging costs. | Same | 126 → 126 |
| 31.205-16 | Gains and losses on disposition or impairment of depreciable property or other capital assets. | Gains and losses on disposition or impairment of depreciable property or other capital assets. | Changed · 94% alike | 733 → 737 |
| 31.205-17 | Idle facilities and idle capacity costs. | Idle facilities and idle capacity costs. | Changed · 97% alike | 376 → 383 |
| 31.205-18 | Independent research and development and bid and proposal costs. | Independent research and development and bid and proposal costs. | Changed · 91% alike | 1099 → 1041 |
| 31.205-19 | Insurance and indemnification. | Insurance and indemnification. | Changed · 94% alike | 864 → 824 |
| 31.205-20 | Interest and other financial costs. | Interest and other financial costs. | Changed · 79% alike | 64 → 78 |
| 31.205-21 | Labor relations costs. | Labor relations costs. | Changed · 92% alike | 149 → 127 |
| 31.205-22 | Lobbying and political activity costs. | Lobbying and political activity costs. | Changed · 94% alike | 590 → 563 |
| 31.205-23 | Losses on other contracts. | Losses on other contracts. | Changed · 63% alike | 22 → 16 |
| 31.205-24 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-25 | Manufacturing and production engineering costs. | Manufacturing and production engineering costs. | Changed · 88% alike | 214 → 183 |
| 31.205-26 | Material costs. | Material costs. | Changed · 97% alike | 409 → 413 |
| 31.205-27 | Organization costs. | Organization costs. | Changed · 94% alike | 193 → 193 |
| 31.205-28 | Other business expenses. | Other business expenses. | Same | 66 → 66 |
| 31.205-29 | Plant protection costs. | Plant protection costs. | Changed · 82% alike | 34 → 32 |
| 31.205-30 | Patent costs. | Patent costs. | Changed · 90% alike | 125 → 116 |
| 31.205-31 | Plant reconversion costs. | Plant reconversion costs. | Changed · 89% alike | 96 → 104 |
| 31.205-32 | Precontract costs. | Precontract costs. | Changed · 97% alike | 61 → 61 |
| 31.205-33 | Professional and consultant service costs. | Professional and consultant service costs. | Changed · 93% alike | 709 → 673 |
| 31.205-34 | Recruitment costs. | Recruitment costs. | Changed · 85% alike | 117 → 110 |
| 31.205-35 | Relocation costs. | Relocation costs. | Changed · 94% alike | 1191 → 1179 |
| 31.205-36 | Rental costs. | Rental costs. | Changed · 94% alike | 295 → 303 |
| 31.205-37 | Royalties and other costs for use of patents. | Royalties and other costs for use of patents. | Changed · 93% alike | 190 → 181 |
| 31.205-38 | Selling costs. | Selling costs. | Changed · 95% alike | 347 → 349 |
| 31.205-39 | Service and warranty costs. | Service and warranty costs. | Changed · 96% alike | 76 → 78 |
| 31.205-40 | Special tooling and special test equipment costs. | Special tooling and special test equipment costs. | Changed · 52% alike | 165 → 129 |
| 31.205-41 | Taxes. | Taxes. | Changed · 87% alike | 786 → 749 |
| 31.205-42 | Termination costs. | Termination costs. | Changed · 91% alike | 943 → 917 |
| 31.205-43 | Trade, business, technical, and professional activity costs. | Trade, business, technical, and professional activity costs. | Changed · 99% alike | 143 → 143 |
| 31.205-44 | Training and education costs. | Training and education costs. | Changed · 97% alike | 207 → 206 |
| 31.205-45 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-46 | Travel costs. | Travel costs. | Changed · 84% alike | 1235 → 1112 |
| 31.205-47 | Costs related to legal and other proceedings. | Costs related to legal and other proceedings. | Changed · 91% alike | 1460 → 1394 |
| 31.205-48 | Research and development costs. | Research and development costs. | Changed · 95% alike | 63 → 66 |
| 31.205-49 | Goodwill. | Goodwill. | Changed · 94% alike | 81 → 87 |
| 31.205-50 | [Reserved] | [Reserved] | Same | 0 → 0 |
| 31.205-51 | Costs of alcoholic beverages. | Costs of alcoholic beverages. | Same | 6 → 6 |
| 31.205-52 | Asset valuations resulting from business combinations. | Asset valuations resulting from business combinations. | Changed · 98% alike | 104 → 104 |
| 31.301 | Purpose. | Purpose. | Changed · 82% alike | 26 → 23 |
| 31.302 | General. | General. | Changed · 70% alike | 60 → 32 |
| 31.303 | Requirements. | Requirements. | Changed · 84% alike | 96 → 73 |
| 31.601 | Purpose. | Purpose. | Changed · 90% alike | 22 → 27 |
| 31.602 | General. | General. | Same | 68 → 68 |
| 31.603 | Requirements. | Requirements. | Changed · 94% alike | 780 → 758 |
| 31.701 | Purpose. | Definition. | Changed · 84% alike | 110 → 82 |
| 31.702 | General. | General. | Changed · 94% alike | 63 → 56 |
| 31.703 | Requirements. | Requirements. | Changed · 95% alike | 86 → 85 |
- Sections are matched by number. The overhaul renumbers and merges a great deal, so "not in the overhaul" means the number is gone, not always that the rule is: its content may sit in another section, in a part's practitioner guide, or be dropped.
- "How alike" compares the two texts word for word (1.00 = the same words). It says how much was rewritten, not what the change means for a contract.