  • FAR 52.222-6 Construction Wage Rate Requirements.
    As prescribed in 22.407(a), insert the following clause: Construction Wage Rate Requirements (AUG 2018) (a) Definition—Site of the work—(1) Means— (i) The primary site of the work. The physical place or places where the construction call