13 sections with “Definitized item”

  • DFARS 204.7106 Contract modifications.
    …entifications to existing contract or exhibit line items, the following rules apply— (i) Definitized and undefinitized items. (A) The original line item or subline item number may be used if the modification applies to the total quantity o…
  • FAR 52.232-16 Progress Payments.
    …ments as a handicap or adverse factor in the award of subcontracts. (k) Limitations on undefinitized contract actions. Notwithstanding any other progress payment provisions in this contract, progress payments may not exceed 80 percent of c…
  • DFARS 204.7101 Definitions.
    …t or incorporated by reference, which does not establish a requirement for deliverables. Definitized item, as used in this subpart, means an item for which a firm price has been established in the basic contract or by modification. Exhibi…
  • DFARS 215.404-71-3 Contract type risk and working capital adjustment.
    … incurred as of the date the contractor submits a qualifying proposal, such as under an undefinitized contract action, (excluding facilities capital cost of money) into the Block 24a column titled Base. (ii) Insert the amount of Government…
  • DFARS 252.211-7003 Item Unique Identification and Valuation.
    …he unit price identified in the contract at the time of delivery; (2) For cost-type or undefinitized line, subline, or exhibit line items, the Contractor's estimated fully burdened unit cost to the Government at the time of delivery; and …
  • FAR 52.232-5 Payments Under Fixed-Price Construction Contracts.
    …t of Claims Act of 1940 (31 U.S.C. 3727 and 41 U.S.C. 6305). (i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized …
  • DFARS 217.7401 Definitions.
    … on, or determination of, contract terms, specifications, and price, which converts the undefinitized contract action to a definitive contract. Qualifying proposal means a proposal that contains sufficient information to enable DoD to cond…
  • DFARS 218.201 Contingency operation.
    …d by the head of the contracting activity, support contingency. See 216.601(d)(3). (9) Undefinitized contract actions. The head of the agency may waive certain limitations for undefinitized contract actions if the head of the agency determ…
  • FAR 48.001 Definitions.
    …rrent contract savings, that are net reductions in the prices of other contracts that are definitized and ongoing at the time the VECP is accepted; and (3) Future contract savings, that are the product of the future unit cost reduction mul…
  • FAR 52.248-1 Value Engineering.
    …rent contract savings, which are net reductions in the prices of other contracts that are definitized and ongoing at the time the VECP is accepted; and (3) Future contract savings, which are the product of the future unit cost reduction mu…
  • DFARS 204.1603 Procedures.
    …y to identify a modification which definitizes a letter contract or a previously issued undefinitized modification. (2) Positions 4 through 6. These positions are always numeric. Use a separate series of serial numbers for each type of mod…
  • DFARS 211.274-3 Policy for valuation.
    …he unit price identified in the contract at the time of delivery; (2) For cost-type or undefinitized line, subline, or exhibit line items, the contractor's estimated fully burdened unit cost to the Government at the time of delivery; and …
  • DFARS 215.404-71-2 Performance risk.
    …ly, qualifying proposal (as defined in 217.7401) in furtherance of definitization of an undefinitized contract action, and the proposal demonstrates effective cost control from the time of award to the present, the contracting officer may a…