48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

4 sections with “Installed costs”

  • DFARS 252.239-7007 Cancellation or Termination of Orders.
    …EP 2019) (a) Definitions. As used in this clause— Actual nonrecoverable costs means the installed costs of the facilities and equipment, less cost of reusable materials, and less net salvage value. Basic cancellation liability means the …
  • FAR 52.245-1 Government Property.
    …ved after construction or installation without substantial loss of value or damage to the installed property or to the premises where installed. Precious metals means silver, gold, platinum, palladium, iridium, osmium, rhodium, and rutheni…
  • FAR 41.101 Definitions.
    … the Government to the utility supplier for the required connecting facilities, which are installed, owned, operated, and maintained by the utility supplier (see Termination liability). Delegated agency means an agency that has received a …
  • DFARS 252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System.
    …onic part; and the potential negative consequences of a counterfeit electronic part being installed (e.g., human safety, mission success) where such consequences are made known to the Contractor. (3) Processes to abolish counterfeit parts …

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.