48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

17 sections with “Value Engineering—Construction”

  • FAR 52.248-3 Value Engineering—Construction.
    As prescribed in 48.202, insert the following clause: Value Engineering—Construction (OCT 2025) (a) General. The Contractor is encouraged to develop, prepare, and submit value engineering change proposals (VECP's) voluntarily. The Contrac…
  • FAR 52.248-2 Value Engineering—Architect-Engineer.
    As prescribed in 48.201(f), insert the following clause: Value Engineering—Architect-Engineer (MAR 1990) (a) General. The Contractor shall (1) perform value engineering (VE) services and submit progress reports as specified in the Schedul…
  • FAR 48.202 Clause for construction contracts.
    The contracting officer shall insert the clause at 52.248-3, Value Engineering—Construction, in construction solicitations and contracts when the contract amount is estimated to exceed the simplified acquisition threshold, unless an incenti…
  • FAR 2.101 Definitions.
    …comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals, and other relate…
  • FAR 3.104-1 Definitions.
    …ocurement for purposes of 41 U.S.C. chapter 21. In excess of $10,000,000 means— (1) The value, or estimated value, at the time of award, of the contract, including all options; (2) The total estimated value at the time of award of all or…
  • FAR 15.408 Solicitation provisions and contract clauses.
    …conomical “make” or “buy” categorization is selected for one or more items of significant value, the contracting officer shall use the clause with— (1) Its Alternate I, if a fixed-price incentive contract is contemplated; or (2) Its Alter…
  • FAR 48.102 Policies.
    (a) As required by 41 U.S.C. 1711, agencies shall establish and maintain cost-effective value engineering procedures and processes. Agencies shall provide contractors a substantial financial incentive to develop and submit VECP's. Contracti…
  • FAR 48.201 Clauses for supply or service contracts.
    (a) General. The contracting officer shall insert a value engineering clause in solicitations and contracts when the contract amount is expected to exceed the simplified acquisition threshold, except as specified in subparagraphs (1) throug…
  • FAR 52.245-1 Government Property.
    …rty that cannot be removed after construction or installation without substantial loss of value or damage to the installed property or to the premises where installed. Precious metals means silver, gold, platinum, palladium, iridium, osmiu…
  • DFARS 252.239-7007 Cancellation or Termination of Orders.
    …ts of the facilities and equipment, less cost of reusable materials, and less net salvage value. Basic cancellation liability means the actual nonrecoverable cost, which the Government shall reimburse the Contractor at the time services ar…
  • FAR 45.101 Definitions.
    …rty that cannot be removed after construction or installation without substantial loss of value or damage to the installed property or to the premises where installed. Precious metals means silver, gold, platinum, palladium, iridium, osmiu…
  • FAR 15.404-4 Profit.
    …lly the same type and mix of work as the basic contract and is of relatively small dollar value compared to the total contract value, the contracting officer may use the basic contract's profit or fee rate as the prenegotiation objective fo…
  • FAR 48.104-2 Sharing acquisition savings.
    … net acquisition savings for supplies and services are based on the type of contract, the value engineering clause or alternate used, and the type of savings, as follows: Government/Contractor Shares of Net Acquisition Savings [Figures in…
  • FAR 19.803 Selecting acquisitions for the 8(a) program.
    …ii) The participant's capacity in each construction category in terms of estimated dollar value (e.g., electrical, up to $100,000). (b) The SBA identifies a specific requirement for one or more 8(a) participant(s) and sends a requirements …
  • FAR 36.601-4 Implementation.
    …comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of operating and maintenance manuals and other related…
  • FAR 42.302 Contract administration functions.
    …ng with procedures regarding restrictive markings on data. (49) Monitor the contractor's value engineering program. (50) Review, approve or disapprove, and maintain surveillance of the contractor's purchasing system (see part 44). (51) C…
  • DFARS 207.106 Additional requirements for major systems.
    …the evaluation of items developed at private expense be based on an analysis of the total value, in terms of innovative design, life-cycle costs, and other pertinent factors, of incorporating such items in the system. (S-70)(1) In accordan…

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.