11 sections with “alternate equitable method”

  • FAR 52.232-16 Progress Payments.
    …rnment reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing. (c) Reduction or suspension. The Contracting Officer may reduce or suspend prog…
  • FAR 52.243-1 Changes—Fixed-Price.
    …all excuse the Contractor from proceeding with the contract as changed. (End of clause) Alternate I (APR 1984). If the requirement is for services, other than architect-engineer or other professional services, and no supplies are to be fu…
  • FAR 52.243-2 Changes—Cost-Reimbursement.
    … the Limitation of Cost or Limitation of Funds clause of this contract. (End of clause) Alternate I (APR 1984). If the requirement is for services and no supplies are to be furnished, substitute the following paragraph (a) for paragraph (…
  • FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature.
    …rights afforded to the Government by any other clause of this contract. (End of clause) Alternate I. [Reserved] Alternate II (APR 1984). If it is desirable to specify that necessary transportation incident to correction or replacement wi…
  • FAR 52.219-9 Small Business Subcontracting Plan.
    … resides with the Contracting Officer who approved the commercial plan. (End of clause) Alternate I (NOV 2016). As prescribed in 19.708(b)(1)(i), substitute the following paragraph (c)(1) for paragraph (c)(1) of the basic clause: (c)(1) …
  • FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.
    … (iii) Charge the Contractor for the costs incurred by the Government. (End of clause) Alternate I (APR 1984). If it is desirable to specify that necessary transportation incident to correction or replacement will be at the Government's …
  • FAR 42.709-5 Computing interest.
    …est to have begun accumulating, from the midpoint of the contractor's fiscal year. Use an alternate equitable method if the cost was not paid evenly over the fiscal year. (b) Use the interest rate specified by the Secretary of the Treasury…
  • FAR 46.706 Warranty terms and conditions.
    …ment does not afford an appropriate remedy to the Government, the warranty should provide alternate remedies, such as authorizing the Government to— (A) Retain the defective item and reduce the contract price by an amount equitable under t…
  • FAR 52.245-1 Government Property.
    …reporting of loss of Government property, including losses that occur at subcontractor or alternate site locations. (A) This process shall include the corrective actions necessary to prevent recurrence. (B) Unless otherwise directed by th…
  • FAR 52.204-2 Security Requirements.
    …acts under this contract that involve access to classified information. (End of clause) Alternate I (APR 1984). If a cost contract for research and development with an educational institution is contemplated, add the following paragraphs …
  • FAR 52.246-2 Inspection of Supplies—Fixed-Price.
    …nd charge to the Contractor the cost occasioned the Government thereby. (End of clause) Alternate I (JUL 1985). If a fixed-price incentive contract is contemplated, substitute paragraphs (g), (h), and (l) below for paragraphs (g), (h), an…