5 sections with “nonseverable”

  • DFARS 204.7103-1 Criteria for establishing.
    …ations for a contract line item is authorized in the following situations: (A) A single, nonseverable deliverable to be paid for with R&D or other funds properly incrementally obligated over several fiscal years in accordance with DoD poli…
  • FAR 45.101 Definitions.
    …al does not include equipment, special tooling, special test equipment or real property. Nonseverable means property that cannot be removed after construction or installation without substantial loss of value or damage to the installed pro…
  • FAR 45.102 Policy.
    …e installed or constructed on contractor-owned real property in such fashion as to become nonseverable, unless the head of the contracting activity determines that such installation or construction is necessary and in the Government's inter…
  • FAR 52.245-1 Government Property.
    …al does not include equipment, special tooling, special test equipment or real property. Nonseverable means property that cannot be removed after construction or installation without substantial loss of value or damage to the installed pro…
  • DFARS 204.7101 Definitions.
    … 1423, Contract Data Requirements List, is always an exhibit, rather than an attachment. Nonseverable deliverable, as used in this subpart, means a deliverable item that is a single end product or undertaking, entire in nature, that cannot…

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.