48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

24 sections with “Inspection of Transportation”

  • FAR 52.246-14 Inspection of Transportation.
    …otiated for reduced rates under 49 U.S.C. 10721 or 13712. (See part 47, Transportation.) Inspection of Transportation (APR 1984) The Government has the right to inspect and test the Contractor's services, facilities, and equipment at all …
  • FAR 52.246-2 Inspection of Supplies—Fixed-Price.
    As prescribed in 46.302, insert the following clause: Inspection of Supplies—Fixed-Price (AUG 1996) (a) Definition. Supplies, as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end p…
  • FAR 52.246-7 Inspection of Research and Development—Fixed-Price.
    As prescribed in 46.307(a), insert the following clause: Inspection of Research and Development—Fixed-Price (AUG 1996) (a) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the work under…
  • FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature.
    …act. The word does not include “data.” (b) Contractor's obligations. (1) Notwithstanding inspection and acceptance by the Government of supplies furnished under this contract, or any condition of this contract concerning the conclusiveness…
  • FAR 52.247-4 Inspection of Shipping and Receiving Facilities.
    …or offerors to inspect the shipping, receiving, or other sites to ensure realistic bids: Inspection of Shipping and Receiving Facilities (APR 1984) (a) Offerors are urged to inspect the shipping and receiving facilities where services are…
  • FAR 46.314 Transportation contracts.
    The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight transportation services (including local drayage) by rail, motor (including bus), domestic freight forwar…
  • FAR 46.403 Government contract quality assurance at destination.
    …nt contract quality assurance that can be performed at destination is normally limited to inspection of the supplies or services. Inspection shall be performed at destination under the following circumstances— (1) Supplies are purchased of…
  • FAR 47.207-1 Qualifications of offerors.
    … commercial zone, the contracting officer shall use the clause with its Alternate I. (c) Inspection of shipping and receiving facilities. The contracting officer shall insert the provision at 52.247-4, Inspection of Shipping and Receiving …
  • FAR 47.302 Place of delivery—f.o.b. point.
    …cceptance is at origin does not necessitate an f.o.b. origin delivery term. Providing for inspection and acceptance at origin (if appropriate under 46.402), in conjunction with an f.o.b. destination term, may be advantageous to both the Gov…
  • FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.
    …Contract Terms and Conditions—Commercial Products and Commercial Services (NOV 2023) (a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government r…
  • FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.
    …d in any way by any terms or conditions of this contract concerning the conclusiveness of inspection and acceptance; and (ii) Are in addition to, and do not limit, any rights afforded to the Government by any other clause of this contract.…
  • FAR 52.247-51 Evaluation of Export Offers.
    …rm is used in the F.o.b. Origin clause of this contract. (c) F.o.b. port of loading with inspection and acceptance at origin. (1) Offers shall be evaluated on the basis of the lowest laid down cost to the Government at the overseas port of…
  • DFARS 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
    … means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement. (b) Except as provided in paragraph (d) of this clause, th…
  • FAR 22.1003-4 Administrative limitations, variations, tolerances, and exemptions.
    …ned by the manufacturer or the contractor, is either published or otherwise available for inspection by customers, and states prices at which sales currently, or were last, made to a significant number of buyers constituting the general pub…
  • FAR 46.706 Warranty terms and conditions.
    …ecifies the design of the end item and its measurements, tolerances, materials, tests, or inspection requirements, the contractor's obligations for correction of defects shall usually be limited to defects in material and workmanship or fai…
  • FAR 14.201-8 Price-related factors.
    …reseeable costs or delays to the Government resulting from such factors as differences in inspection, locations of supplies, and transportation. If bids are on an f.o.b. origin basis (see 47.303 and 47.305), transportation costs to the desi…
  • FAR 45.201 Solicitation.
    …her the property is to be furnished in an “as-is” condition and instructions for physical inspection. (b) When Government property is offered for use in a competitive acquisition, solicitations should specify that the contractor is respons…
  • FAR 47.202 Presolicitation planning.
    …ractors to inspect origin and destination locations; or (c) The possible requirement for inspection by agency personnel of prospective contractor facilities and equipment.
  • FAR 52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
    … the full text of a clause may be accessed electronically at this/these address(es): (d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government r…
  • FAR 52.236-3 Site Investigation and Conditions Affecting the Work.
    …stacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this con…
  • FAR 52.243-1 Changes—Fixed-Price.
    …raph (b) of the basic clause: (a)(1) Drawings, designs, or specifications. (3) Place of inspection, delivery, or acceptance. (b) If any such change causes an increase or decrease in the cost of, or time required for, performing this cont…
  • DFARS 202.101 Definitions.
    …ans an electronic part for which credible evidence (including, but not limited to, visual inspection or testing) provides reasonable doubt that the electronic part is authentic. Tiered evaluation of offers, also known as cascading evaluati…
  • DFARS 204.7103-1 Criteria for establishing.
    …elivered in a single shipment. This creates potential contract administration issues with inspection, acceptance, and payment. In such cases, solicitations should be structured to allow offerors to provide information about products that ma…
  • DFARS 223.370-1 Scope.
    …novation; (11) Demilitarization; (12) Modification; (13) Repair; (14) Disposal; (15) Inspection; or (16) Any other use, including acquisitions requiring the use or the incorporation of materials listed in paragraph (b) of this subsect…

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.