48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
79 sections with “Place of manufacture”: the first 40
- FAR 52.225-18 Place of Manufacture.As prescribed in 25.1101(f), insert the following provision: Place of Manufacture (AUG 2018) (a) Definitions. As used in this provision— Manufactured end product means any end product in product and service codes (PSCs) 1000-9999, except…
- FAR 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.…PSC 9620, Minerals, Natural and Synthetic; and (10) PSC 9630, Additive Metal Materials. Place of manufacture means the place where an end product is assembled out of components, or otherwise made or processed from raw materials into the f…
- FAR 52.225-23 Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials Under Trade Agreements.…n the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives); and (ii) The Buy American statute by providing a…
- FAR 52.226-7 Drug-Free Workplace.As prescribed in 26.506, insert the following clause: Drug-Free Workplace (MAY 2024) (a) Definitions. As used in this clause— Controlled substance means a controlled substance in schedules I through V of section 202 of the Controlled Sub…
- FAR 52.246-2 Inspection of Supplies—Fixed-Price.…spect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a man…
- FAR 52.246-3 Inspection of Supplies—Cost-Reimbursement.…has the right to inspect and test the contract supplies, to the extent practicable at all places and times, including the period of manufacture, and in any event before acceptance. The Government may also inspect the plant or plants of the …
- DFARS 252.225-7001 Buy American and Balance of Payments Program.…quisition Regulation (FAR)); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- DFARS 252.225-7009 Restriction on Acquisition of Certain Articles Containing Specialty Metals.…ns an item forming a portion of a system or subsystem that— (i) Can be provisioned and replaced as an entity; and (ii) Incorporates multiple, replaceable parts. Commercial derivative military article means an item acquired by the Departm…
- DFARS 252.225-7036 Buy American—Free Trade Agreements—Balance of Payments Program.…quisition Regulation (FAR)); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- DFARS 252.225-7044 Balance of Payments Program—Construction Material.…cquisition Regulation (FAR); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- DFARS 252.225-7045 Balance of Payments Program—Construction Material Under Trade Agreements.…quisition Regulation (FAR)); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- DFARS 252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.…ns an item forming a portion of a system or subsystem that— (1) Can be provisioned and replaced as an entity; and (2) Incorporates multiple, replaceable parts. Commercially available off-the-shelf item— (1) Means any item of supply that…
- FAR 52.225-21 Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials.…n the United States means that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives); and (ii) 41 U.S.C. chapter 83, Buy American, by …
- FAR 52.246-12 Inspection of Construction.…ection of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract. (c) Government inspections and tests…
- DFARS 223.107-4 Products that contain, use, or are manufactured with ozone-depleting substances or products that contain or use high global warming potential hydrofluorocarbons.… by the Clean Air Act and applies after June 1, 1993, to all DoD contracts, regardless of place of performance.
- DFARS 252.227-7018 Rights in Other Than Commercial Technical Data and Computer Software—Small Business Innovation Research Program and Small Business Technology Transfer Program.…rpose of computer software or is of the type customarily provided in the commercial marketplace. Other than commercial computer software means software that does not qualify as commercial computer software under the definition of “commerci…
- FAR 19.505 Limitations on subcontracting and nonmanufacturer rule.…manufacturer to provide an end item of an other than small business without regard to the place of manufacture, processing, or production. (A) Class waiver. An agency may request that SBA waive the requirement at paragraph (c)(1)(i) or (c)…
- FAR 25.1101 Acquisition of supplies.…(j)(2) of the clause to reduce the dollar figure. (f) Insert the provision at 52.225-18, Place of Manufacture, in solicitations that are predominantly for the acquisition of manufactured end products, (i.e., the estimated value of the manu…
- FAR 52.246-21 Warranty of Construction.…d conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement. (e) The Contracting Officer shall notify the Contractor, in writing, within a reas…
- FAR 2.101 Definitions.…vances in technology or performance and that is not yet available in the commercial marketplace, but will be available in the commercial marketplace in time to satisfy the delivery requirements under a Government solicitation; (3) A produc…
- FAR 15.408 Solicitation provisions and contract clauses.…, the contracting officer shall modify the contract without requiring consideration, to replace clause 52.215-12, Subcontractor Certified Cost or Pricing Data, with its Alternate I. (e) Subcontractor Certified Cost or Pricing Data—Modifica…
- FAR 16.505 Ordering.…e full cost or price for the performance of the work can be established when the order is placed. Orders shall be within the scope, issued within the period of performance, and be within the maximum value of the contract. (3) Performance-b…
- FAR 25.602-1 Section 1605 of the Recovery Act.…on or steel, but requires that all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives. (B) The requirement in paragraph (a)(1)(ii)(A) of…
- FAR 26.504 Policy.…e simplified acquisition threshold, unless it agrees that it will provide a drug-free workplace by— (1) Publishing a statement notifying its employees that the unlawful manufacture, distribution, dispensing, possession, or use of a control…
- FAR 46.401 General.…rformed at such times (including any stage of manufacture or performance of services) and places (including subcontractors' plants) as may be necessary to determine that the supplies or services conform to contract requirements. Quality ass…
- FAR 52.225-3 Buy American—Free Trade Agreements—Israeli Trade Act.…tion Regulation (FAR) 2.101; (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- FAR 52.243-1 Changes—Fixed-Price.…e with the drawings, designs, or specifications. (2) Method of shipment or packing. (3) Place of delivery. (b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the wor…
- FAR 52.243-2 Changes—Cost-Reimbursement.…e with the drawings, designs, or specifications. (2) Method of shipment or packing. (3) Place of delivery. (b) If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part …
- FAR 52.249-6 Termination (Cost-Reimbursement).…usting any amounts due under this clause: (1) Stop work as specified in the notice. (2) Place no further subcontracts or orders (referred to as subcontracts in this clause), except as necessary to complete the continued portion of the con…
- DFARS 252.225-7021 Trade Agreements.…ral Acquisition Regulation); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- DFARS 252.228-7001 Ground and Flight Risk.…mises, designated in the Schedule or in writing by the Contracting Officer, and any other place the aircraft is moved for safeguarding. Covered aircraft means an aircraft owned by or to be delivered to the Government and, when determined b…
- DFARS 252.245-7005 Management and Reporting of Government Property.…property for contract performance and that the Government will not pay for any repairs, replacement, and/or refurbishment of the property. Commercial and Government Entity (CAGE) code means— (1) An identifier assigned to entities located …
- DFARS 252.246-7008 Sources of Electronic Parts.…ntly found to be counterfeit or suspect counterfeit, the Government will— (A) Promptly replace such part at no charge; and (B) Consider an adjustment in the contract schedule to the extent that replacement of the counterfeit or suspect co…
- FAR 5.207 Preparation and transmittal of synopses.…) Line Item Number. (14) Contract Award Date. (15) Contractor. (16) Description. (17) Place of Contract Performance. (18) Set-aside Status. (b) Transmittal. Transmissions to the GPE must be in accordance with the interface description…
- FAR 10.002 Procedures.…met by— (A) Products or services of a type customarily available in the commercial marketplace; (B) Products or services of a type customarily available in the commercial marketplace with modifications; or (C) Products or services used e…
- FAR 27.404-2 Limited rights data and restricted computer software.…paragraphs (3)(i) through (iv) of this section; and (vi) Used or copied for use with a replacement computer. (4) The restricted rights set forth in paragraph (d)(3) of this subsection are the minimum rights the Government normally obtains…
- FAR 52.204-8 Annual Representations and Certifications.…ction under any Federal Law. This provision applies to all solicitations. (x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the…
- FAR 52.204-30 Federal Acquisition Supply Chain Security Act Orders—Prohibition.… (DEC 2023). As prescribed in 4.2306(c)(2)(ii), substitute the following paragraph (b) in place of paragraph (b) of the basic clause. This clause applies to each order as identified by the Contracting Officer. (b) Prohibition. (1) Contract…
- FAR 52.225-1 Buy American—Supplies.…tion Regulation (FAR) 2.101; (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold i…
- FAR 52.225-7 Waiver of Buy American Statute for Civil Aircraft and Related Articles.…ese simulators, for use with respect to the aircraft, whether to be used as original or replacement equipment in the manufacture, repair, maintenance, rebuilding, modification, or conversion of the aircraft, and without regard to whether th…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.