48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
33 sections with “Wage adjustment”
- FAR 52.222-30 Construction Wage Rate Requirements—Price Adjustment (None or Separately Specified Method).As prescribed in 22.407(e), insert the following clause: Construction Wage Rate Requirements—Price Adjustment (None or Separately Specified Method) (AUG 2018) (a) The wage determination issued under the Construction Wage Rate Requirements…
- FAR 52.222-31 Construction Wage Rate Requirements—Price Adjustment (Percentage Method).As prescribed in 22.407(f), insert the following clause: Construction Wage Rate Requirements—Price Adjustment (Percentage Method) (AUG 2018) (a) The wage determination issued under the Construction Wage Rate Requirements statute by the Ad…
- FAR 52.222-32 Construction Wage Rate Requirements—Price Adjustment (Actual Method).As prescribed in 22.407(g), insert the following clause: Construction Wage Rate Requirements—Price Adjustment (Actual Method) (AUG 2018) (a) The wage determination issued under the Construction Wage Rate Requirements statute by the Admini…
- DFARS 252.216-7003 Economic price adjustment—wage rates or material prices controlled by a foreign government.As prescribed in 216.203-4-70(c)(1), use the following clause: Economic Price Adjustment—Wage Rates or Material Prices Controlled by a Foreign Government (MAR 2012) (a) As represented by the Contractor in its offer, the prices set forth i…
- DFARS 252.216-7008 Economic price adjustment—wage rates or material prices controlled by a foreign government—representation.…prescribed in 216.203-4-70(c)(2), use the following provision: Economic Price Adjustment—Wage Rates or Material Prices Controlled by a Foreign Government—Representation (MAR 2012) (a) By submission of its offer, the offeror represents tha…
- FAR 22.404-6 Modifications of wage determinations.(a) General. (1) The Department of Labor may modify a wage determination to make it current by specifying only the items being changed or by reissuing the entire determination with changes incorporated. (2) All project wage determination m…
- FAR 22.1904 Annual Executive Order Minimum Wage Rate.(a) For the E.O. minimum wage rate that becomes effective on January 30, 2022, and annually thereafter, the Administrator will— (1) Notify the public of the new E.O. minimum wage rate at least 90 days before it becomes effective by publish…
- FAR 52.222-6 Construction Wage Rate Requirements.As prescribed in 22.407(a), insert the following clause: Construction Wage Rate Requirements (AUG 2018) (a) Definition—Site of the work—(1) Means— (i) The primary site of the work. The physical place or places where the construction call…
- FAR 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts).…ntracts) (AUG 2018) (a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements. (b) The Contractor warrants that the prices in this contract do not in…
- FAR 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment.…justment (MAY 2014) (a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to Contractor collective bargaining agreements. (b) The Contractor warrants that the prices in this contrac…
- FAR 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026.As prescribed in 22.1906, insert the following clause: Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (a) Definitions. As used in this clause— “United States” means the 50 states, the District of Columbia, Pu…
- DFARS 252.247-7002 Revision of prices.…n 247.270-4(b), use the following clause: Revision of Prices (DEC 1991) (a) Definition. Wage adjustment, as used in this clause, means a change in the wages, salaries, or other terms or conditions of employment which— (1) Substantially a…
- FAR 22.404-12 Labor standards for contracts containing construction requirements and option provisions that extend the term of the contract.…on work, the contracting officer must modify the contract to incorporate the most current wage determination. (b) If a contract with an option to extend the term of the contract has indefinite-delivery or indefinite-quantity construction r…
- FAR 22.406-8 Investigations.…t that employee's prior signed consent. (3) Send a written request to the Administrator, Wage and Hour Division, to obtain— (i) Investigation and enforcement instructions; or (ii) Available pertinent Department of Labor files. (4) Obtai…
- FAR 22.407 Solicitation provision and contract clauses.…n excess of $2,000 for construction within the United States: (1) 52.222-6, Construction Wage Rate Requirements. (2) 52.222-7, Withholding of Funds. (3) 52.222-8, Payrolls and Basic Records. (4) 52.222-9, Apprentices and Trainees. (5) …
- FAR 22.1006 Solicitation provisions and contract clauses.…Multiple Year and Option Contracts), applies to both contracts subject to area prevailing wage determinations and contracts subject to the incumbent contractor's collective bargaining agreement in effect during this contract's preceding con…
- FAR 22.1009-4 All possible places of performance not identified.…contracting officer has already identified. (3) That the contracting officer will obtain wage determinations for additional possible places of performance if asked to do so in writing. (4) The time and date by which offerors must notify t…
- FAR 22.1902 Policy.(a) Pursuant to Executive Order 14026, the minimum hourly wage rate required to be paid to workers performing on, or in connection with, contracts and subcontracts subject to this subpart is— (1) At least $15.00 per hour beginning January …
- FAR 31.205-6 Compensation for personal services.… current year and must not represent a retroactive adjustment of prior years' salaries or wages (but see paragraphs (g), (h), (j), (k), (m), and (o) of this subsection). (2) The total compensation for individual employees or job classes of…
- FAR 52.222-4 Contract Work Hours and Safety Standards—Overtime Compensation.…asic rate of pay for each hour worked over 40 hours. (b) Violation; liability for unpaid wages; liquidated damages. The responsible Contractor and subcontractor are liable for unpaid wages if they violate the terms in paragraph (a) of this…
- FAR 52.222-41 Service Contract Labor Standards.…t by the Contractor or any subcontractor shall be paid not less than the minimum monetary wages and shall be furnished fringe benefits in accordance with the wages and fringe benefits determined by the Secretary of Labor, or authorized repr…
- FAR 52.222-49 Service Contract Labor Standards—Place of Performance Unknown.…as unknown when the solicitation was issued. In addition to places or areas identified in wage determinations, if any, attached to the solicitation, wage determinations have also been requested for the following: ______ (insert places or ar…
- DFARS 216.203-4-70 Additional provisions and clauses.… approval is obtained at a level above the contracting officer. (c) Price adjustment for wage rates or material prices controlled by a foreign government. (1)(i) The price adjustment clause at 252.216-7003, Economic Price Adjustment—Wage R…
- FAR 1.109 Statutory acquisition-related dollar thresholds—adjustment for inflation.…ished by: (1) 40 U.S.C. chapter 31— (i) Subchapter III, Bonds; and (ii) Subchapter IV, Wage Rate Requirements (Construction); (2) 41 U.S.C. chapter 67, Service Contract Labor Standards; or (3) The United States Trade Representative pur…
- FAR 22.302 Liquidated damages and overtime pay.…ts, the responsible contractor or subcontractor must pay the affected employee any unpaid wages and pay liquidated damages to the Government. The contracting officer must assess liquidated damages at the rate specified at 29 CFR 5.5(b)(2) p…
- DFARS 201.109 Statutory acquisition-related dollar thresholds-adjustment for inflation.…egard to the date of award of the contract or subcontract, except thresholds based on the Wage Rate Requirements statute, the Service Contract Labor Standards statute, or established by the United States Trade Representative pursuant to the…
- FAR 2.101 Definitions.…ementing regulations; for example, pursuant to— (1) 40 U.S.C. chapter 31, subchapter IV, Wage Rate Requirements (Construction), and its related statutes and implementing regulations; (2) 41 U.S.C. chapter 67, Service Contract Labor Standa…
- FAR 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services.…rtain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67). __ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022). __ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 1…
- DFARS 252.204-7007 Alternate A, Annual Representations and Certifications.…presentation. Applies to all solicitations. (ii) 252.216-7008, Economic Price Adjustment—Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contr…
- FAR 4.705-1 Financial and cost accounting records.… Paid, canceled, and voided checks, other than those issued for the payment of salary and wages: Retain 4 years. (e) Accounts payable records to support disbursements of funds for materials, equipment, supplies, and services, containing or…
- FAR 17.109 Contract clauses.…cts when laws, regulations, or international agreements require contractors to pay higher wage rates; or (3) May use an economic price adjustment clause authorized by 16.203, when potential fluctuations require coverage and are not include…
- DFARS 204.1202 Solicitation provision and contract clause.…ership or Control by a Foreign Government. (iii) 252.216-7008, Economic Price Adjustment—Wage Rates or Material Prices Controlled by a Foreign Government—Representation. (iv) 252.225-7000, Buy American—Balance of Payments Program Certific…
- DFARS 252.247-7000 Hardship conditions.…. (b) Unusual conditions include, but are not limited to, inaccessibility of place of stowage to the ship's cargo gear, side port operations, and small quantities of cargo in any one hatch. (c) The Contracting Officer will investigate the…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.