48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

10 sections with “concept decision”

  • FAR 2.101 Definitions.
    …d mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils engineering, drawing reviews, preparation of opera…
  • DFARS 212.212 Computer software.
    …agencies shall identify and evaluate, at all stages of the acquisition process (including concept refinement, concept decision, and technology development), opportunities for the use of commercial computer software and other non-development…
  • FAR 7.105 Contents of written acquisition plans.
    …ost goals for the acquisition and the rationale supporting them, and discuss related cost concepts to be employed, including, as appropriate, the following items: (i) Life-cycle cost. Discuss how life-cycle cost will be considered. If it i…
  • DFARS 252.227-7038 Patent Rights—Ownership by the Contractor (Large Business).
    … Made— (1) When used in relation to any invention other than a plant variety, means the conception or first actual reduction to practice of the invention; or (2) When used in relation to a plant variety, means that the Contractor has at …
  • FAR 9.505-1 Providing systems engineering and technical direction.
    …or occupies a highly influential and responsible position in determining a system's basic concepts and supervising their execution by other contractors. Therefore this contractor should not be in a position to make decisions favoring its ow…
  • FAR 12.403 Termination.
    …titled “Termination for the Government's Convenience” and “Termination for Cause” contain concepts which differ from those contained in the termination clauses prescribed in part 49. Consequently, the requirements of part 49 do not apply wh…
  • FAR 15.202 Advisory multi-step process.
    …a statement of qualifications and other appropriate information (e.g., proposed technical concept, past performance, and limited pricing information). At a minimum, the notice shall contain sufficient information to permit a potential offer…
  • FAR 16.505 Ordering.
    …erations (e.g., rough estimates), and other considerations as appropriate (e.g., proposed conceptual approach, past performance). The contractors most likely to submit the highest value solutions are then selected for one-on-one sessions wi…
  • FAR 52.222-41 Service Contract Labor Standards.
    …d in the same locality. Basic to the establishment of any conformable wage rate(s) is the concept that a pay relationship should be maintained between job classifications based on the skill required and the duties performed. (B) In the cas…
  • FAR 52.227-11 Patent Rights—Ownership by the Contractor.
    … Made means— (1) When used in relation to any invention other than a plant variety, the conception or first actual reduction to practice of the invention; or (2) When used in relation to a plant variety, that the Contractor has at least …

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.