48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
217 sections with “design work”: the first 40
- FAR 9.505-2 Preparing specifications or work statements.… firms that have done the most advanced work in the field. These firms can be expected to design and develop around their own prior knowledge. Development contractors can frequently start production earlier and more knowledgeably than firms…
- FAR 36.301 Use of two-phase design-build selection procedures.…formal or informal acquisition planning (see part 7), if considering the use of two-phase design-build selection procedures, the contracting officer shall conduct the evaluation in paragraph (b) of this section. (b) The two-phase design-bu…
- FAR 50.205-2 Pre-qualification designation notice.… Act protection, the requiring activity is responsible for requesting a pre-qualification designation notice from DHS. Such a request for a pre-qualification designation notice should be made once the requiring activity has determined that …
- FAR 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States.As prescribed in 25.301-4, insert the following clause: Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States (MAY 2020) (a) Definitions. As used in this clause— Ch…
- DFARS 236.606-70 Statutory fee limitation.… limit the contract price (or fee) for architect-engineer services for the preparation of designs, plans, drawings, and specifications to 10 percent of the project's estimated construction cost. (b) The 10 percent limit also applies to con…
- DFARS 252.227-7024 Notice and approval of restricted designs.As prescribed at 227.7107-3, use the following clause: Notice and Approval of Restricted Designs (APR 1984) In the performance of this contract, the Contractor shall, to the extent practicable, make maximum use of structures, machines, pr…
- DFARS 215.404-71-3 Contract type risk and working capital adjustment.… It shall not exceed 4 percent of the contract costs in Block 20. (c) Values: Normal and designated ranges. (1) “No financing” means either that the contract does not provide progress payments or performance-based payments, or that the co…
- FAR 2.101 Definitions.…ng nature performed by contract that are associated with research, planning, development, design, construction, alteration, or repair of real property; and (3) Those other professional services of an architectural or engineering nature, or…
- FAR 3.104-1 Definitions.As used in this section— Agency ethics official means the designated agency ethics official described in 5 CFR 2638.201 or other designated person, including— (1) Deputy ethics officials described in 5 CFR 2638.204, to whom authority unde…
- FAR 7.105 Contents of written acquisition plans.…. If appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity, learning-curve, and economi…
- FAR 14.304 Submission, modification, and withdrawal of bids.…bmitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bid (IFB) by the time specified in the IFB. They may use any transmission method authorized by the IFB (i.e., regular…
- FAR 15.208 Submission, modification, revision, and withdrawal of proposals.…ing proposals, and any revisions, and modifications, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. Offerors may use any transmission method authorized by the solicitation (i.e…
- FAR 16.505 Ordering.…er aspects of the contracting environment; (B) Not use any method (such as allocation or designation of any preferred awardee) that would not result in fair consideration being given to all awardees prior to placing each order; (C) Tailor…
- FAR 32.001 Definitions.…from these payments. Delivery payments are invoice payments for prompt payment purposes. Designated billing office means the office or person (governmental or nongovernmental) designated in the contract where the contractor first submits i…
- FAR 32.904 Determining payment due dates.…nt is as follows: (1) The later of the following two events: (i) The 30th day after the designated billing office receives a proper invoice from the contractor (except as provided in paragraph (b)(3) of this section). (ii) The 30th day a…
- FAR 32.905 Payment documentation and process.…equired by the contract. (3) If the invoice does not comply with these requirements, the designated billing office must return it within 7 days after receipt (3 days on contracts for meat, meat food products, or fish; 5 days on contracts f…
- FAR 32.906 Making payments.…ent methods is necessary. See 32.903(a)(5), but see 32.009-1(a). (b) Payment office. The designated payment office— (1) Will mail checks on the same day they are dated; (2) For payments made by EFT, will specify a date on or before the e…
- FAR 35.005 Work statement.…r a task-completion approach, which often requires the development of a tangible end item designed to achieve specific performance characteristics. The wording of the work statement should also be consistent with the type and form of contra…
- FAR 36.102 Definitions.… a contract for architect-engineer services, unless another meaning is clearly intended. Design means defining the construction requirement (including the functional relationships and technical systems to be used, such as architectural, en…
- FAR 36.104 Policy.(a) Unless the traditional acquisition approach of design-bid-build established under 40 U.S.C. chapter 11, Selection of Architects and Engineers, or another acquisition procedure authorized by law is used, the contracting officer shall use…
- FAR 36.602-1 Selection criteria.… and (6) Acceptability under other appropriate evaluation criteria. (b) When the use of design competition is approved by the agency head or a designee, agencies may evaluate firms on the basis of their conceptual design of the project. D…
- FAR 42.302 Contract administration functions.…(a)(11), and (a)(12) of this section, unless the cognizant Federal agency (see 2.101) has designated the contracting officer to perform these functions. (1) Review the contractor's compensation structure. (2) Review the contractor's insur…
- FAR 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.…s, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.…
- FAR 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.…under the SDVOSB Program means an SDVOSB concern that— (1) Effective January 1, 2024, is designated in the System for Award Management (SAM) as certified by the Small Business Administration (SBA) in accordance with 13 CFR 128.300; or (2)…
- FAR 52.214-7 Late submissions, modifications, and withdrawals of bids.…bmitting bids, and any modifications or withdrawals, so as to reach the Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., l…
- FAR 52.214-23 Late submissions, modifications, revisions, and withdrawals of technical proposals under two-step sealed bidding.…nical proposals, and any modifications or revisions, so as to reach the Government office designated in the request for technical proposals by the time specified in the invitation for bids (IFB). If no time is specified in the IFB, the time…
- FAR 52.215-1 Instructions to Offerors—Competitive Acquisition.…tting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.…
- FAR 52.219-9 Small Business Subcontracting Plan.…r between the prime Contractor and the ANC or Indian tribe, the ANC or Indian tribe shall designate the appropriate Contractor(s) to count the subcontract towards its small business and small disadvantaged business subcontracting goals. (A…
- FAR 52.224-2 Privacy Act.…rescribed in 24.104, insert the following clause in solicitations and contracts, when the design, development, or operation of a system of records on individuals is required to accomplish an agency function: Privacy Act (APR 1984) (a) The…
- FAR 52.225-11 Buy American—Construction Materials Under Trade Agreements.…d critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105. Designated country means any of the following countries: (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, …
- FAR 52.225-23 Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials Under Trade Agreements.… individual parts or components of those systems are delivered to the construction site. Designated country means any of the following countries: (1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, …
- FAR 52.225-26 Contractors Performing Private Security Functions Outside the United States.…finitions. As used in this clause— Area of combat operations means an area of operations designated as such by the Secretary of Defense when enhanced coordination of contractors performing private security functions working for Government …
- FAR 52.232-12 Advance Payments.…Contractor, and approval by the administering office, ____ [Insert the name of the office designated under agency procedures], or (2) under a letter of credit. The amount of the invoice or voucher submitted plus all advance payments previou…
- FAR 52.232-25 Prompt payment.…paragraphs (a)(2) and (c) of this clause, the due date for making invoice payments by the designated payment office is the later of the following two events: (A) The 30th day after the designated billing office receives a proper invoice fr…
- FAR 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts.…ted by the Contractor, the later of the following two events: (A) The 30th day after the designated billing office receives a proper invoice from the Contractor (except as provided in paragraph (a)(1)(iii) of this clause). (B) The 30th da…
- FAR 52.232-27 Prompt Payment for Construction Contracts.…ilestones in any project. (A) The due date for making such payments is 14 days after the designated billing office receives a proper payment request. If the designated billing office fails to annotate the payment request with the actual da…
- FAR 52.232-32 Performance-Based Payments.…ontract and not subject to the interest penalty provisions of the Prompt Payment Act. The designated payment office will pay approved requests on the _____ [Contracting Officer insert day as prescribed by agency head; if not prescribed, ins…
- FAR 52.232-34 Payment by Electronic Funds Transfer—Other than System for Award Management.…(j) of this clause). The Contractor shall provide this information directly to the office designated in this contract to receive that information (hereafter: “designated office”) by _________ [the Contracting Officer shall insert date, days…
- FAR 52.236-25 Requirements for Registration of Designers.As prescribed in 36.609-4, insert the following clause: Requirements for Registration of Designers (JUN 2003) Architects or engineers registered to practice in the particular professional field involved in a State, the District of Columbi…
- FAR 52.243-1 Changes—Fixed-Price.…in the general scope of this contract in any one or more of the following: (2) Drawings, designs, or specifications when the supplies to be furnished are to be specially manufactured for the Government in accordance with the drawings, desi…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.