48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

20 sections with “engineering and manufacturing development”

  • FAR 31.205-25 Manufacturing and production engineering costs.
    (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1) Developing and deploying new or improved materials, systems, processes, methods, equipment, tools and techniques …
  • FAR 6.302-3 Industrial mobilization; engineering, developmental, or research capability; or expert services.
    …rgency or to achieve industrial mobilization; (ii) To establish or maintain an essential engineering, research, or development capability to be provided by an educational or other nonprofit institution or a federally funded research and de…
  • FAR 31.205-18 Independent research and development and bid and proposal costs.
    …ific performance requirements or objectives. Development includes the functions of design engineering, prototyping, and engineering testing. Development excludes: (1) Subcontracted technical effort which is for the sole purpose of developin…
  • DFARS 215.101-2-70 Limitations and prohibitions.
    …the acquisition of— (i) Information technology services, cybersecurity services, systems engineering and technical assistance services, advanced electronic testing, or other knowledge-based professional services; (ii) Items designated by …
  • DFARS 215.304 Evaluation factors and significant subfactors.
    …reduction phase of weapon system design (see guidance at PGI 207.105(b)(14)(ii)(2)); (B) Engineering and manufacturing development phase of a weapon system, including embedded software (10 U.S.C. 4328); or (C) Production and deployment ph…
  • FAR 2.101 Definitions.
    …ve the effectiveness of Federal management processes or procedures (including those of an engineering and technical nature). In rendering the foregoing services, outputs may take the form of information, advice, opinions, alternatives, anal…
  • DFARS 234.004 Acquisition strategy.
    …ude in solicitations for contracts for the technical maturation and risk reduction phase, engineering and manufacturing development phase or production phase of a weapon system, including embedded software— (i) Clearly defined measurable c…
  • DFARS 207.106 Additional requirements for major systems.
    … sector repair activities). (5) In accordance with 10 U.S.C. 4328, acquisition plans for engineering manufacturing and development and production of major systems as defined in 10 U.S.C. 3041(a) and 4202 and for major defense acquisition p…
  • DFARS 216.402-2 Performance incentives.
    …es or the imposition of penalties are included in the solicitation for a contract for the engineering and manufacturing development or production of a weapon system, including embedded software, if the program manager or comparable requirin…
  • DFARS 234.005-2 Mission-oriented solicitation.
    …bition on the use of the lowest price technically acceptable source selection process for engineering and manufacturing development of a major defense acquisition program for which budgetary authority is requested beginning in fiscal year 2…
  • FAR 3.104-1 Definitions.
    …g broad agency-level missions or objectives. (ii) The performance of general, technical, engineering, or scientific effort having broad application not directly associated with a particular procurement, notwithstanding that such general, t…
  • FAR 15.404-4 Profit.
    …nvolved. (B) Conversion direct labor. This subfactor measures the contribution of direct engineering, manufacturing, and other labor to converting the raw materials, data, and subcontracted items into the contract items. Considerations inc…
  • FAR 49.202 Profit.
    …the work done by the contractor as compared with the total work required by the contract (engineering estimates of the percentage of completion ordinarily should not be required, but if available should be considered); (2) Engineering work…
  • FAR 52.245-1 Government Property.
    …dium, and ruthenium. Production scrap means unusable material resulting from production, engineering, operations and maintenance, repair, and research and development contract activities. Production scrap may have value when re-melted or r…
  • DFARS 227.7103-5 Government rights.
    …additional sources and maintain adequate competition among the sources; or (iii) Reverse engineering, or providing items from Government inventories to contractors who request the items to facilitate the development of equivalent items thr…
  • FAR 14.501 General.
    …context, the word technical has a broad connotation and includes, among other things, the engineering approach, special manufacturing processes, and special testing techniques. It is the proper step for clarification of questions relating t…
  • FAR 15.404-1 Proposal analysis techniques.
    …request that personnel having specialized knowledge, skills, experience, or capability in engineering, science, or management perform a technical analysis of the proposed types and quantities of materials, labor, processes, special tooling,…
  • FAR 45.101 Definitions.
    …dium, and ruthenium. Production scrap means unusable material resulting from production, engineering, operations and maintenance, repair, and research and development contract activities. Production scrap may have value when re-melted or r…
  • FAR 49.112-1 Partial payments.
    …yment. Before approving any partial payment, the TCO shall obtain any desired accounting, engineering, or other specialized reviews of the data submitted in support of the contractor's settlement proposal. If the reviews and the TCO's exami…
  • DFARS 227.671 General.
    …f patents, data, or know-how reflecting the primary source's investment in developing and engineering and production techniques; and the primary source's “price” for setting up a second source. Such agreements often refer to the compensatio…

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.