  • DFARS 216.403-1 Fixed-price incentive (firm target) contracts.
    …plication. (1) The contracting officer shall give particular consideration to the use of fixed-price incentive (firm target) contracts, especially for acquisitions moving from development to production. (2) The contracting officer shall p…
  • FAR 16.403-1 Fixed-price incentive (firm target) contracts.
    (a) Description. A fixed-price incentive (firm target) contract specifies a target cost, a target profit, a price ceiling (but not a profit ceiling or floor), and a profit adjustment formula. These elements are all negotiated at the outset.…
  • FAR 16.403-2 Fixed-price incentive (successive targets) contracts.
    (a) Description. (1) A fixed-price incentive (successive targets) contract specifies the following elements, all of which are negotiated at the outset: (i) An initial target cost. (ii) An initial target profit. (iii) An initial profit ad…
  • FAR 16.403 Fixed-price incentive contracts.
    (a) Description. A fixed-price incentive contract is a fixed-price contract that provides for adjusting profit and establishing the final contract price by application of a formula based on the relationship of total final negotiated cost to…
  • FAR 49.115 Settlement of terminated incentive contracts.
    (a) Fixed-price incentive contracts. The TCO shall settle terminated fixed-price incentive (FPI) contracts under the provisions of paragraph (j) of the clause at 52.216-16, Incentive Price Revision—Firm Target, and 52.249-2, Termination for…
  • DFARS 234.004 Acquisition strategy.
    …would not be practicable to reduce program risk to a level that would permit the use of a fixed-price type contract; and (2) The complexity and technical challenge of the program is not the result of a failure to meet the requirements of 1…
  • FAR 52.248-1 Value Engineering.
    … the term does not include quantities funded after VECP acceptance. If this contract is a fixed-price contract with prospective price redetermination, the term refers to the period for which firm prices have been established. Instant unit …
  • FAR 16.401 General.
    (a) Incentive contracts as described in this subpart are appropriate when a firm-fixed-price contract is not appropriate and the required supplies or services can be acquired at lower costs and, in certain instances, with improved delivery …
  • FAR 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity.
    …roper Activity (MAY 2014) (a) The Government, at its election, may reduce the price of a fixed-price type contract and the total cost and fee under a cost-type contract by the amount of profit or fee determined as set forth in paragraph (b…
  • FAR 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises.
    …f a cost-plus-incentive-fee prime contract. (iii) The target cost and ceiling price of a fixed-price incentive prime contract. (iv) The price of a firm-fixed-price prime contract. (3) The amount of the adjustment to the prime contract is…
  • FAR 16.406 Contract clauses.
    …at 52.216-16, Incentive Price Revision—Firm Target, in solicitations and contracts when a fixed-price incentive (firm target) contract is contemplated. If the contract calls for supplies or services to be ordered under a provisioning docume…
  • FAR 48.104-2 Sharing acquisition savings.
    …nt and future contract savings and of collateral savings shall be paid as a separate firm-fixed-price line item on the instant contract. (5) Within 3 months after concurrent contracts have been modified to reflect price reductions attribut…
  • FAR 32.501-3 Contract price.
    …ic price adjustment, the contract price is the initial price until modified. (3) Under a fixed-price incentive contract, the contract price is the target price plus the not-to-exceed amount of unpriced modifications. However, if the contra…