48 CFR · Federal Acquisition Regulation and Defense supplement

FAR and DFARS navigator

The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.

Ask the FAR

Try: · · ·

Clear

15 sections with “measurable”

  • FAR 37.602 Performance work statement.
    …rovided (see 11.002(a)(2) and 11.101); (2) Enable assessment of work performance against measurable performance standards; (3) Rely on the use of measurable performance standards and financial incentives in a competitive environment to en…
  • FAR 2.101 Definitions.
    …uisitions that describes the required results in clear, specific and objective terms with measurable outcomes. Personal property means property of any kind or interest in it except real property, records of the Federal Government, and nava…
  • FAR 16.402-2 Performance incentives.
    …s shall be considered in connection with service contracts for performance of objectively measurable tasks when quality of performance is critical and incentives are likely to motivate the contractor. (c) Technical performance incentives m…
  • FAR 31.205-6 Compensation for personal services.
    …be reasonable for the work performed. Compensation is reasonable if the aggregate of each measurable and allowable element sums to a reasonable total. In determining the reasonableness of total compensation, consider only allowable individu…
  • FAR 32.607 Installment payments and deferment of collection.
    …s the contractor's ability to pay improved. It should also provide for required stated or measurable payments on the occurrence of specific events or contingencies that improve the contractor's ability to pay. (c) If not already applicable…
  • FAR 32.1004 Procedures.
    …nce-based payments may be either specifically described events (e.g., milestones) or some measurable criterion of performance. Each event or performance criterion that will trigger a finance payment shall be an integral and necessary part o…
  • FAR 37.601 General.
    …based contracts for services shall include— (1) A performance work statement (PWS); (2) Measurable performance standards (i.e., in terms of quality, timeliness, quantity, etc.) and the method of assessing contractor performance against pe…
  • FAR 37.603 Performance standards.
    …evel required by the Government to meet the contract requirements. The standards shall be measurable and structured to permit an assessment of the contractor's performance. (b) When offerors propose performance standards in response to a S…
  • FAR 48.001 Definitions.
    …nance logistic support, or Government-furnished property. Collateral savings means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exclusive of acquisition savings, whether or not t…
  • FAR 52.248-1 Value Engineering.
    …r Government-furnished property. Collateral savings, as used in this clause, means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exclusive of acquisition savings, whether or not t…
  • FAR 52.248-3 Value Engineering—Construction.
    …r Government-furnished property. Collateral savings, as used in this clause, means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exlcusive of acquisition savings, whether or not t…
  • DFARS 201.101 Purpose.
    … DoD acquisition is to acquire quality supplies and services that satisfy user needs with measurable improvements to mission capability and operational support at a fair and reasonable price.
  • DFARS 215.404-71-4 Facilities capital employed.
    …ntracting officer may assign a value significantly above normal when there are direct and measurable benefits in efficiency and significantly reduced acquisition costs on the effort being priced. Maximum values apply only to those cases whe…
  • DFARS 215.407-4 Should-cost review.
    …J) Identification and prioritization of cost savings opportunities. (K) Establishment of measurable targets and ongoing tracking systems. (ii) The should-cost review shall provide for sufficient analysis while minimizing the impact on pro…
  • DFARS 234.004 Acquisition strategy.
    …or production phase of a weapon system, including embedded software— (i) Clearly defined measurable criteria for engineering activities and design specifications for reliability and maintainability provided by the program manager, or the c…