13 sections with “primary site of the work”

  • FAR 22.404-4 Solicitations issued without wage determinations for the primary site of the work.
    (a) If a solicitation is issued before the wage determination for the primary site of the work is obtained, a notice shall be included in the solicitation that the schedule of minimum wage rates to be paid under the contract will be issued …
  • FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work.
    …ing Officer. (b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Offi…
  • FAR 22.404-5 Expiration of project wage determinations.
    … applies when contracting by sealed bidding: (1) If a project wage determination for the primary site of the work expires before bid opening, or if it appears before bid opening that a project wage determination may expire before award, th…
  • FAR 22.404-6 Modifications of wage determinations.
    …determination. The need to include a modification of a project wage determination for the primary site of the work in a solicitation is determined by the time of receipt of the modification by the contracting agency. Therefore, the contract…
  • FAR 22.404-8 Notification of improper wage determination before award.
    …ce with the following: (1) If the notification of an improper wage determination for the primary site of the work reaches the contracting officer before bid opening, the contracting officer shall postpone the bid opening date, if necessary…
  • FAR 52.222-6 Construction Wage Rate Requirements.
    …on Wage Rate Requirements (AUG 2018) (a) Definition—Site of the work—(1) Means— (i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and…
  • DFARS 252.236-7005 Airfield safety precautions.
    …rescribed in 236.570(b)(3), use the following clause. At some airfields, the width of the primary surface is 1,500 feet (750 feet on each side of the runway centerline). In such instances, substitute the proper width in the clause. Airfiel…
  • FAR 2.101 Definitions.
    … Basic research means that research directed toward increasing knowledge in science. The primary aim of basic research is a fuller knowledge or understanding of the subject under study, rather than any practical application of that knowled…
  • FAR 22.401 Definitions.
    …ss of whether title thereof is in a Federal agency. Site of the work—(1) Means— (i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and…
  • FAR 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission Outside the United States.
    …tiatives, or through any combination of these options. (3) The Department of Defense has primary responsibility for recovering DoD contract service employees and, when requested, will provide personnel recovery support to other agencies in…
  • FAR 22.404-3 Procedures for requesting wage determinations.
    …ays. Accordingly, agencies should submit requests for project wage determinations for the primary site of the work to the Department of Labor at least 45 days (60 days if possible) before issuing the solicitation or exercising an option to …
  • FAR 22.404-2 General requirements.
    …the nature of a project is not clear, it is necessary to look at additional factors, with primary consideration given to locally established area practices. If there is any doubt as to the proper application of wage rate schedules to the ty…
  • DFARS 215.404-71-2 Performance risk.
    … restricted to studies, analyses, or demonstrations that have a technical report as their primary deliverable. (d) Evaluation criteria for technical. (1) Review the contract requirements and focus on the critical performance elements in th…