13 sections with “strikes”

  • FAR 22.101-2 Contract pricing and administration.
    …overnment procedures. (3) Using private boards or organizations to settle disputes. (c) Strikes normally result in changing patterns of cost incurrence and therefore may have an impact on the allowability of costs for cost-reimbursement c…
  • FAR 52.249-10 Default (Fixed-Price Construction).
    …Government, (iv) fires, (v) floods, (vi) epidemics, (vii) quarantine restrictions, (viii) strikes, (ix) freight embargoes, (x) unusually severe weather, or (xi) delays of subcontractors or suppliers at any tier arising from unforeseeable ca…
  • FAR 52.222-34 Project Labor Agreement.
    …re otherwise parties to collective bargaining agreements; (3) Contain guarantees against strikes, lockouts, and similar job disruptions; (4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising…
  • FAR 14.402-3 Postponement of openings.
    …l and without their fault or negligence (e.g., flood, fire, accident, weather conditions, strikes, or Government equipment blackout or malfunction when bids are due); or (2) Emergency or unanticipated events interrupt normal governmental p…
  • FAR 22.504 General requirements for project labor agreements.
    …re otherwise parties to collective bargaining agreements; (3) Contain guarantees against strikes, lockouts, and similar job disruptions; (4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising…
  • FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.
    …its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reas…
  • FAR 52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
    …its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reas…
  • FAR 52.222-33 Notice of Requirement for Project Labor Agreement.
    …re otherwise parties to collective bargaining agreements; (3) Contain guarantees against strikes, lockouts, and similar job disruptions; (4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising…
  • FAR 52.241-6 Service Provisions.
    … to acts of God or of the public enemy, fires, floods, earthquakes, or other catastrophe, strikes, or failure or breakdown of transmission or other facilities. If any such failure, suspension, diminution, or other variation of service shall…
  • FAR 52.249-8 Default (Fixed-Price Supply and Service).
    …ntractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance the failure to perform must be beyond the control and without the f…
  • FAR 52.249-9 Default (Fixed-Price Research and Development).
    …tractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance the failure to perform must be beyond the control and without the f…
  • FAR 52.249-14 Excusable Delays.
    …tractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the …
  • DFARS 252.217-7009 Default.
    …its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather. (c) If the Contractor's failure to perform is caused by the default of a subcontractor, and…

FAR (chapter 1)

DFARS (chapter 2, Defense)

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.