48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
31 sections with “unacceptable”
- FAR 14.503-1 Step one.…zed as— (i) Acceptable; (ii) Reasonably susceptible of being made acceptable; or (iii) Unacceptable. (2) Any proposal which modifies, or fails to conform to the essential requirements or specifications of, the request for technical prop…
- FAR 6.302-1 Only one responsible source and no other supplies or services will satisfy agency requirements.… cost to the Government that is not expected to be recovered through competition; or (B) Unacceptable delays in fulfilling the agency's requirements. (See 10 U.S.C. 3204(b)(B)or 41 U.S.C. 3304(b)(2).) (iii) For DoD, NASA, and the Coast Gu…
- FAR 52.215-1 Instructions to Offerors—Competitive Acquisition.…n or counteroffer by the Government. (8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptab…
- DFARS 209.270-2 Definitions.…lure resulting in the loss of or serious damage to the aircraft or weapon system; (2) An unacceptable risk of personal injury or loss of life; or (3) An uncommanded engine shutdown that jeopardizes safety. Design control activity—(1) Wit…
- DFARS 252.209-7010 Critical Safety Items.…e resulting in the loss of, or serious damage to, the aircraft or weapon system; (ii) An unacceptable risk of personal injury or loss of life; or (iii) An uncommanded engine shutdown that jeopardizes safety. Design control activity. (i) …
- FAR 8.405-6 Limiting sources.…— (A) An urgent and compelling need exists, and following the procedures would result in unacceptable delays; (B) Only one source is capable of providing the supplies or services required at the level of quality required because the suppl…
- FAR 15.001 Definitions.…aknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. Proposal modification is a change made to a proposal before the solicitation closing date and time, or made in response to an ame…
- FAR 15.404-1 Proposal analysis techniques.…r may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government. (h) Review and justification of pass-through contracts. (1) The requirements of this paragraph (h) are applicabl…
- FAR 16.505 Ordering.…r the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays. (B) Only one awardee is capable of providing the supplies or services required at the level of quality required because the supp…
- FAR 25.502 Application.…he following steps in the order presented: (1) Eliminate all offers or offerors that are unacceptable for reasons other than price; e.g., nonresponsive, debarred or suspended, or a prohibited source (see Subpart 25.7). (2) Rank the remain…
- FAR 25.504 Evaluation Examples.….503. The examples assume that the contracting officer has eliminated all offers that are unacceptable for reasons other than price or a trade agreement (see 25.502(a)(1)). The evaluation factor may change as provided in agency regulations.
- FAR 28.101-4 Noncompliance with bid guarantee requirements.…solicitation requirement for a bid guarantee requires rejection of an initial proposal as unacceptable, if a determination is made to award the contract based on initial proposals without discussion, except in the situations described in pa…
- FAR 28.203-1 Acceptability of individual sureties.…mpetency. (See 19.602-1(a) and 61 Comp. Gen. 456 (1982).) (f) If a contractor submits an unacceptable individual surety, or one that Treasury could not assess the asset eligibility and valuation within a reasonable time, then the contracti…
- FAR 32.204 Procedures for contracting officer-specified commercial contract financing.…lter the evaluation of the offer, nor does it render the offer nonresponsive or otherwise unacceptable. In the event of award to an offeror who declined the proposed contract financing, the contract financing provisions shall not be include…
- FAR 32.503-6 Suspension or reduction of payments.…ress payments shall be suspended (or the portion of progress payments associated with the unacceptable portion of the contractor's accounting system shall be suspended) until the necessary changes have been made. (2) If the contractor fail…
- FAR 46.402 Government contract quality assurance at source.…ructive testing; (b) Considerable loss would result from the manufacture and shipment of unacceptable supplies, or from the delay in making necessary corrections; (c) Special required instruments, gauges, or facilities are available only …
- FAR 52.204-22 Alternative Line Item Proposal.…th the line items specified in this solicitation may be determined to be nonresponsive or unacceptable. (End of provision)
- FAR 52.211-7 Alternatives to Government-unique standards.…-unique standards specified in this solicitation may be determined to be nonresponsive or unacceptable. The offeror may submit an offer that complies with the Government-unique standards specified in this solicitation, in addition to any pr…
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services.… the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). (c…
- FAR 52.228-2 Additional Bond Security.…or issuing financial institution for other security, furnished with this contract becomes unacceptable to the Government; (b) Any surety fails to furnish reports on its financial condition as required by the Government; (c) The contract p…
- DFARS 209.571-4 Mitigation.… the senior procurement executive before determining that an offeror's mitigation plan is unacceptable.
- DFARS 225.772-2 Prohibitions.…act from a covered foreign country; or (iii) Entering into such contract would create an unacceptable cybersecurity risk for DoD, as determined by the Under Secretary of Defense for Acquisition and Sustainment or the Under Secretary of Def…
- DFARS 225.772-3 Procedures.… or is offering satellite services provided by a foreign entity if such award presents an unacceptable cybersecurity risk, as determined by the Under Secretary of Defense for Acquisition and Sustainment or the Under Secretary of Defense for…
- DFARS 225.7002-2 Exceptions.…ity, why alternatives that would not require a domestic nonavailability determination are unacceptable. (3) Defense agencies other than the Defense Logistics Agency shall follow the procedures at PGI 225.7002-2(b)(3) when submitting a requ…
- DFARS 225.7003-3 Exceptions.…ity, why alternatives that would not require a domestic nonavailability determination are unacceptable. (ii) A domestic nonavailability determination that applies to more than one contract (i.e., a class domestic nonavailability determinat…
- DFARS 225.7018-4 Nonavailability determination.… specificity, why alternatives that would not require a nonavailability determination are unacceptable. The template for an individual nonavailability determination is available at PGI 225.7018-4(a)(2). (3) Provide to USD(A&S) DASD (Indust…
- DFARS 232.072-2 Appropriate information.…itle terms under contract financing; (iv) Clearly stated confirmations of credit with no unacceptable qualifications; (v) Unambiguous written agreement by a creditor if credit arrangements include deferred trade payments or creditor subor…
- DFARS 252.217-7008 Bonds.…ment fails to submit requested reports as to its financial condition or otherwise becomes unacceptable to the Government, the Contracting Officer may require the Contractor to furnish whatever additional security the Contracting Officer det…
- DFARS 252.225-7049 Prohibition on Acquisition of Certain Foreign Commercial Satellite Services—Representations.…tract from a covered foreign country; or (C) Entering into such contract would create an unacceptable cybersecurity risk for DoD; or (ii) An offeror that is offering to provide the commercial satellite services of a foreign entity as desc…
- DFARS 252.235-7004 Protection of Human Subjects.…lving human subjects and, based on such findings, DoD may prohibit research that presents unacceptable hazards or otherwise fails to comply with DoD procedures. (e) Failure of the Contractor to comply with the requirements of this clause w…
- DFARS 252.239-7004 Orders for Facilities and Services.…ation or other contractual document. (h) When services normally provided are technically unacceptable and the development, fabrication, or manufacture of special equipment is required, the Government may— (1) Provide the equipment; or (2…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.