48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
41 sections with “unreasonable cost”: the first 40
- FAR 25.106 Determining reasonableness of cost.…ombination of both, if the procedures in paragraph (b)(1)(i) of this section result in an unreasonable cost determination for the domestic offer or there is no domestic offer received, and the low offer is for a foreign end product that doe…
- FAR 25.204 Evaluating offers of foreign construction material.…ial proposed for exception from the requirements of the Buy American statute based on the unreasonable cost of domestic construction materials. In the case of a tie, the contracting officer shall give preference to an offer that does not in…
- FAR 52.225-9 Buy American—Construction Materials.… the Government determines that— (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particula…
- FAR 52.225-11 Buy American—Construction Materials Under Trade Agreements.… the Government determines that— (i) The cost of domestic construction material would be unreasonable. (A) For domestic construction material that is not a critical item or does not contain critical components. (1) The cost of a particula…
- FAR 52.225-21 Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials.… the Government determines that— (i) The cost of domestic construction material would be unreasonable; (A) The cost of domestic manufactured construction material, when compared to the cost of comparable foreign manufactured construction …
- FAR 52.225-23 Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials Under Trade Agreements.… the Government determines that— (i) The cost of domestic construction material would be unreasonable; (A) The cost of domestic manufactured construction material is unreasonable when the cumulative cost of such material, when compared to…
- FAR 25.605 Evaluating offers of foreign construction material.…d that an exception applies because the cost of certain domestic construction material is unreasonable, in accordance with section 25.604, then the contracting officer shall apply evaluation factors to the offer incorporating the use of suc…
- FAR 52.225-22 Notice of Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials.…r. (c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception …
- FAR 52.225-24 Notice of Required Use of American Iron, Steel, and Manufactured Goods—Buy American Statute—Construction Materials Under Trade Agreements.…r. (c) Evaluation of offers. (1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies in accordance with FAR 25.604, the Government will evaluate an offer requesting exception …
- FAR 15.403-1 Prohibition on obtaining certified cost or pricing data (10 U.S.C. chapter 271 and 41 U.S.C. chapter 35).…ction; and (C) There is no finding that the price of the otherwise successful offeror is unreasonable. Any finding that the price is unreasonable must be supported by a statement of the facts and approved at a level above the contracting o…
- FAR 25.604 Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute.…nt this information with other readily available information. (c) Determination based on unreasonable cost of domestic construction material. (1) Manufactured construction material. The contracting officer must compare the offered price o…
- FAR 52.225-10 Notice of Buy American Requirement—Construction Materials.…er requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign constructio…
- FAR 52.225-12 Notice of Buy American Requirement—Construction Materials Under Trade Agreements.…er requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign constructi…
- DFARS 225.7004-6 Waiver of restrictions.…mination and findings that any of the following applies: (i) The restriction would cause unreasonable delays. (ii) Satisfactory quality items manufactured in the national technology and industrial base are not available. (iii) Applicatio…
- FAR 25.103 Exceptions.…d in accordance with 5.201. (iii) No offer for a domestic end product was received. (c) Unreasonable cost. The contracting officer may determine that the cost of a domestic end product would be unreasonable, in accordance with 25.106 and …
- FAR 25.202 Exceptions.…hat exceeds 55 percent domestic content (see 25.204(b)(1)(ii) and 25.204(b)(2)(ii)). (3) Unreasonable cost. The contracting officer concludes that the cost of domestic construction material is unreasonable in accordance with 25.204. (4) I…
- FAR 25.603 Exceptions.…3(b)(1) also apply if any of those articles are acquired as construction materials. (ii) Unreasonable cost. The contracting officer concludes that the cost of domestic construction material is unreasonable in accordance with 25.605. (iii)…
- FAR 31.205-26 Material costs.…xception under 15.403-1(b) and the contracting officer has not determined the price to be unreasonable. (f) When a commercial product or commercial service under paragraph (e) of this section is sold or transferred at a price based on a ca…
- FAR 31.205-46 Travel costs.…lowable except when such accommodations require circuitous routing, require travel during unreasonable hours, excessively prolong travel, result in increased cost that would offset transportation savings, are not reasonably adequate for the…
- DFARS 225.7017-3 Exceptions.…an statute for products of qualifying countries, as defined in 225.003. (b) Buy American—unreasonable cost. For a covered contract that utilizes photovoltaic devices valued at less than $174,000, the exception for unreasonable cost may app…
- DFARS 252.225-7018 Photovoltaic Devices—Certificate.…known, and provide documentation that the cost of a domestic photovoltaic device would be unreasonable in comparison to the cost of the proposed foreign photovoltaic device, i.e., that the price of the foreign photovoltaic device plus 50 pe…
- FAR 22.101-2 Contract pricing and administration.… contracts or for recognition of costs in pricing fixed-price contracts if they result in unreasonable costs to the Government. For a discussion of allowable costs resulting from labor-management agreements, see 31.205-6(b). (b) Labor disp…
- FAR 25.101 General.…(c) Exceptions that allow the purchase of a foreign end product are listed at 25.103. The unreasonable cost exception is implemented through the use of an evaluation factor applied to low foreign offers that are not eligible offers. The eva…
- FAR 25.606 Postaward determinations.…o allow use of the foreign construction material. When the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is at least the differential established in 25.605(a).
- FAR 14.404-2 Rejection of individual bids.… (f) Any bid may be rejected if the contracting officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only the total price of the bid, but the prices for individual line items as well. (…
- FAR 25.504-1 Buy American statute.…g evaluated price of $13,130 remains lower than Offer B. The cost of Offer B is therefore unreasonable (see 25.106(b)(1)(ii)). The 25.106(b)(2) procedures do not apply. Award on Offer C at $10,100 (see 25.502(c)(4)(i)). (b)(1) Example 2. …
- FAR 52.242-14 Suspension of Work.…ence of the Government. (b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2…
- FAR 52.245-9 Use and Charges.…etermine an hourly rental rate. (iii) When the ACO believes the appraisal rental rate is unreasonable, the ACO shall promptly notify the Contractor. The parties may agree on an alternative means for computing a reasonable rental charge. (…
- DFARS 228.370-2 General.… (b) of the clause at 252.228-7001, including finding the covered aircraft are exposed to unreasonable conditions, the contracting officer shall issue a preliminary notice of revocation of the Government's assumption of risk to the contract…
- DFARS 252.228-7001 Ground and Flight Risk.…ments within a timeframe specified by the Contracting Officer. In determining exposure to unreasonable conditions, the Contracting Officer will consider factors including, but not limited to, the following: lack of adequate hangar fire supp…
- FAR 3.501-2 General.…ph A., column (2) under “Formats for Submission of Line Item Summaries”) and treatment of unreasonable price quotations (see 15.405).
- FAR 9.202 Policy.… purchasing the item subject to the qualification requirement, a determination that it is unreasonable to specify the standards for qualification which a prospective offeror (or its product) must satisfy. After considering any comments of t…
- FAR 14.404-1 Cancellation of invitations after opening.… that for which the bids were invited; (6) All otherwise acceptable bids received are at unreasonable prices, or only one bid is received and the contracting officer cannot determine the reasonableness of the bid price; (7) The bids were …
- FAR 15.405 Price negotiation.…ctor insists on a price or demands a profit or fee that the contracting officer considers unreasonable, and the contracting officer has taken all authorized actions (including determining the feasibility of developing an alternative source)…
- FAR 16.601 Time-and-materials contracts.…der a common control; and (B) The contracting officer has not determined the price to be unreasonable. (3) Material handling costs. When included as part of material costs, material handling costs shall include only costs clearly excluded…
- FAR 27.302 Policy.…d inventions to meet the needs of the Government and protect the public against nonuse or unreasonable use of inventions; and (6) Minimize the costs of administering patent policies. (b) Contractor right to elect title. (1) Generally, pur…
- FAR 31.109 Advance agreements.… be difficult to determine. To avoid possible subsequent disallowance or dispute based on unreasonableness, unallocability or unallowability under the specific cost principles at subparts 31.2, 31.3, 31.6, and 31.7, contracting officers and…
- FAR 42.1302 Suspension of work.… ordered by the contracting officer for a reasonable period of time. If the suspension is unreasonable, the contractor may submit a written claim for increases in the cost of performance, excluding profit.
- FAR 44.202-2 Considerations.…(3) Subcontracts are proposed for award on a non-competitive basis, at prices that appear unreasonable, or at prices higher than those offered to the Government in comparable circumstances; or (4) Subcontracts are proposed on a cost-reimbu…
- FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transactions.…is clause makes allowable or reasonable any costs which would otherwise be unallowable or unreasonable. Conversely, costs made specifically unallowable by the requirements in this clause will not be made allowable under any other provision.…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.