48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
22 sections with “waste materials”
- FAR 52.223-10 Waste Reduction Program.As prescribed in 23.406(c), insert the following clause: Waste Reduction Program (MAY 2024) (a) Definitions. As used in this clause— Recycling means the series of activities, including collection, separation, and processing, by which pro…
- FAR 2.101 Definitions.…(i) Reduces the amount of any hazardous substance, pollutant, or contaminant entering any waste stream or otherwise released into the environment (including fugitive emissions) prior to recycling, treatment, or disposal; and (ii) Reduces t…
- DFARS 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.…oes not include a temporary accumulation of a limited quantity of a material used in or a waste generated or resulting from authorized activities, such as servicing, maintenance, or repair of Department of Defense (DoD) items, equipment, or…
- FAR 36.001 Definitions.As used in this part— Construction and demolition materials and debrismeans waste materials and debris generated during construction, renovation, demolition, or dismantling of all structures and buildings and associated infrastructure. Di…
- FAR 52.211-5 Material Requirements.… operating condition by readjustments and material replacement. Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, …
- FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items.…rial is a part of the broader category of “recovered material.” Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, …
- FAR 52.223-23 Sustainable Products and Services.…the product is new or emerging. (7 U.S.C. 8101) (7 CFR 3201.2). Recovered material means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, …
- FAR 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.…with an entity that requires employees or subcontractors of such entity seeking to report waste, fraud, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or subcontractors…
- FAR 52.236-12 Cleaning Up.…hall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and ma…
- DFARS 204.470-3 Contract clause.…hnologies directly related to nuclear power production, including nuclear or radiological waste materials.
- FAR 45.606 Contractor scrap procedures.… create scrap— (1) Consisting of sensitive items; (2) Containing hazardous materials or wastes; (3) Contaminated with hazardous materials or wastes; (4) That is classified or otherwise controlled; (5) Containing precious or strategic m…
- FAR 36.104 Policy.… long-term viability of the buildings; and (4) Ensure pollution prevention and eliminate waste by diverting at least 50 percent of non-hazardous construction and demolition materials and debris. (c)(1) Agencies shall require the use of a …
- FAR 36.601-3 Applicable contracting procedures.…require the architect-engineer to consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable in developing the construction design specifications. (2) Facility design solicitations and contrac…
- FAR 36.602-1 Selection criteria.…d, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts wit…
- FAR 45.101 Definitions.…unition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals. Unit acquisition cost means— (1) For Government-furnished property, the dollar value assigned by the Government and iden…
- FAR 45.602-2 Reutilization priorities.…roperty subject to spoilage or decay. (6) Trading stamps and bonus goods. (7) Hazardous waste or toxic and hazardous materials. (8) Controlled substances. (9) Property dangerous to public health and safety. (10) Classified items or pro…
- FAR 45.602-3 Screening.…scribed in paragraph (a) of this section. (4) Non-nuclear hazardous materials, hazardous wastes, and classified items. These items shall be screened in accordance with agency procedures. Report non-nuclear hazardous materials to GSA if the…
- FAR 52.243-7 Notification of Changes.…eged change; (ii) What labor or materials or both have been or may be added, deleted, or wasted by the alleged change; (iii) To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on cont…
- FAR 52.245-1 Government Property.…unition, explosives, controlled substances, radioactive materials, hazardous materials or wastes, or precious metals. Unit acquisition cost means— (1) For Government-furnished property, the dollar value assigned by the Government and iden…
- DFARS 252.217-7005 Inspection and manner of doing work.…ctor shall at all times keep the site of the work on the vessel free from accumulation of waste material or rubbish caused by its employees or the work. At the completion of the work, unless the job order specifies otherwise, the Contractor…
- DFARS 252.225-7012 Preference for Certain Domestic Commodities.…the threshold at Defense Federal Acquisition Regulation Supplement 225.7002-2(a); (3) To waste and byproducts of cotton or wool fiber for use in the production of propellants and explosives; (4) To foods, other than fish, shellfish, or se…
- DFARS 252.245-7005 Management and Reporting of Government Property.… basic material content. For purposes of demilitarization, scrap is defined as recyclable waste and discarded materials derived from items that have been rendered useless beyond repair, rehabilitation, or restoration such that the item's or…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.