48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
47 sections with “cost voucher”: the first 40
- DFARS 252.204-7006 Billing Instructions—Cost Vouchers.As prescribed in 204.7109(b), use the following clause: Billing Instructions—Cost Vouchers (MAY 2023) When submitting a request for payment using a cost voucher, the Contractor shall— (a) Identify the contract line item(s) on the payment…
- FAR 30.606 Resolving cost impacts.…ll coordinate with the affected contracting officers before negotiating and resolving the cost impact when the estimated cost impact on any of their contracts is at least $100,000. However, the CFAO has the sole authority for negotiating an…
- FAR 42.803 Disallowing costs after incurrence.Cost-reimbursement contracts, the cost-reimbursement portion of fixed-price contracts, letter contracts that provide for reimbursement of costs, and time-and-material and labor-hour contracts provide for disallowing costs during the course …
- FAR 49.603-3 Cost-reimbursement contracts—complete termination, if settlement includes cost.[Insert the following in Block 14 of SF 30 for settlement of cost-reimbursement contracts that are completely terminated, if settlement includes costs.] (a) This supplemental agreement settles the settlement proposal resulting from the Not…
- FAR 49.603-4 Cost-reimbursement contracts—complete termination, with settlement limited to fee.[Insert the following in Block 14 of SF 30 for settlement of cost-reimbursement contracts that are completely terminated, if settlement is limited to fee.] (a) This supplemental agreement settles the amount of fee due under the contract, t…
- FAR 52.216-7 Allowable Cost and Payment.As prescribed in 16.307(a), insert the following clause: Allowable Cost and Payment (AUG 2018) (a) Invoicing. (1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concer…
- FAR 52.216-26 Payments of Allowable Costs Before Definitization.As prescribed in 16.603-4(c), insert the following clause: Payments of Allowable Costs Before Definitization (DEC 2002) (a) Reimbursement rate. Pending the placing of the definitive contract referred to in this letter contract, the Govern…
- DFARS 242.803 Disallowing costs after incurrence.…ficer receipt of vouchers. Contracting officer receipt of vouchers is applicable only for cost-reimbursement contracts with the Canadian Commercial Corporation. See 225.870-5(b) for invoice procedures. (b) Auditor receipt of voucher. (i) T…
- DFARS 242.7000 Contractor business system deficiencies.…nt System; (iii) Estimating system, if the contract includes the clause at 252.215-7002, Cost Estimating System Requirements; (iv) Material management and accounting system, if the contract includes the clause at 252.242-7004, Material Ma…
- DFARS 252.242-7005 Contractor business systems.…ems (Jan 2025) (a) This clause only applies to covered contracts that are subject to the Cost Accounting Standards under 41 U.S.C. chapter 15, as implemented in regulations found at 48 CFR 9903.201-1 (see the FAR Appendix). (b) Definition…
- FAR 49.603-5 Cost-reimbursement contracts—partial termination.… SF 30, Amendment of Solicitation/Modification of Contract, for settlement agreements for cost-reimbursement contracts as a result of partial termination.] (a) This supplemental agreement settles the termination settlement proposal resulti…
- DFARS 252.232-7006 Wide Area WorkFlow Payment Instructions.…e Contractor shall submit payment requests using the following document type(s): (i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher. (ii) For fixed price line items— (A) That require shipment …
- FAR 2.101 Definitions.… comprehensive plan for fulfilling the agency need in a timely manner and at a reasonable cost. It includes developing the overall strategy for managing the acquisition. Activity Address Code (AAC) means a distinct six-position code consis…
- FAR 4.803 Contents of contract files.…leted solicitation sections A, B, and K; (ii) Technical and management proposals; (iii) Cost/price proposals; and (iv) Any other pages of the solicitation that the offeror or quoter has altered or annotated. (11) Contractor's representa…
- FAR 30.605 Processing noncompliances.(a) General. Prior to making any contract price or cost adjustments under the applicable paragraph(s) addressing noncompliance at 52.230-2, 52.230-3, or 52.230-5, the CFAO shall determine that— (1) The contemplated contract price or cost a…
- FAR 42.302 Contract administration functions.…e agreements (see 15.407-3). (6) Negotiate advance agreements applicable to treatment of costs under contracts currently assigned for administration (see 31.109). (7) Determine the allowability of costs suspended or disapproved as require…
- FAR 42.705 Final indirect cost rates.(a) Final indirect cost rates shall be established on the basis of— (1) Contracting officer determination procedure (see 42.705-1) or (2) Auditor determination procedure (see 42.705-2). (b) Within 120 days (or longer period, if approved …
- FAR 49.112-1 Partial payments.…the TCO under 49.108-3(c) or was authorized under 49.108-4; (3) 90 percent of the direct cost of termination inventory, including costs of raw materials, purchased parts, supplies, and direct labor; (4) 90 percent of other allowable costs…
- FAR 49.302 Discontinuance of vouchers.…vouchers at any time during the 6-month period. When the contractor has vouchered out all costs within the 6-month period, a proposal for fee, if any, may be submitted on SF 1437 (see 49.602-1) or by letter appropriately certified. The cont…
- FAR 49.303-5 Final settlement.… audit report, if applicable, and the contract audit closing statement covering vouchered costs. (b) The TCO shall adjust the fee as provided in 49.305. (c) The final settlement agreement may include all demands of the Government and prop…
- FAR 49.304-3 Submission of vouchers.…to submit the SF 1034, Public Voucher for Purchases and Services Other than Personal, for costs reimbursable under the contract. The contractor shall not be reimbursed for costs of settlements with subcontractors unless required approvals o…
- FAR 52.216-5 Price Redetermination—Prospective.…d under this contract exceed any ceiling price included in the contract. (b) Definition. Costs, as used in this clause, means allowable costs in accordance with part 31 of the Federal Acquisition Regulation (FAR) in effect on the date of t…
- FAR 52.216-6 Price Redetermination—Retroactive.…d under this contract exceed __ [insert dollar amount of ceiling price]. (b) Definition. Costs, as used in this clause, means allowable costs in accordance with part 31 of the Federal Acquisition Regulation (FAR) in effect on the date of t…
- FAR 52.216-10 Incentive Fee.…rescribed in 16.307(d), insert the following clause in solicitations and contracts when a cost-plus-incentive-fee contract (other than a facilities contract) is contemplated: Incentive Fee (JUN 2011) (a) General. The Government shall pay …
- FAR 52.216-16 Incentive Price Revision—Firm Target.…s clause shall be identified as such in a modification to this contract. (b) Definition. Costs, as used in this clause, means allowable costs in accordance with part 31 of the Federal Acquisition Regulation (FAR) in effect on the date of t…
- FAR 52.216-17 Incentive Price Revision—Successive Targets.…l target profit of ___ [Contracting Officer insert percent] percent of the initial target cost. Any supplies or services that are to be (1) ordered separately under, or otherwise added to, this contract and (2) subject to price revision in …
- FAR 52.232-7 Payments under Time-and-Materials and Labor-Hour Contracts.…uthorized by the Contracting Officer. (4) The hourly rates shall include wages, indirect costs, general and administrative expense, and profit. Fractional parts of an hour shall be payable on a prorated basis. (5) Vouchers may be submitte…
- FAR 52.232-12 Advance Payments.…ds from the special account only to pay for properly allocable, allowable, and reasonable costs for direct materials, direct labor, and indirect costs. Other withdrawals require approval in writing by the administering office. Determination…
- DFARS 252.243-7002 Requests for Equitable Adjustment.…or which the Contractor believes the Government is liable. The request shall include only costs for performing the change, and shall not include any costs that already have been reimbursed or that have been separately claimed. All indirect …
- FAR 4.705-1 Financial and cost accounting records.…ction of material or services, and debit and credit memoranda: Retain 4 years. (f) Labor cost distribution cards or equivalent documents: Retain 2 years. (g) Petty cash records showing description of expenditures, to whom paid, name of pe…
- DFARS 204.7109 Contract clauses.… contract line or subline item. (b) Use the clause at 252.204-7006, Billing Instructions—Cost Vouchers, in solicitations and contracts when a cost-reimbursement contract, a time-and-materials contract, or a labor-hour contract is contempla…
- FAR 7.503 Policy.…r products or services); (vi) Terminating contracts; (vii) Determining whether contract costs are reasonable, allocable, and allowable; and (viii) Participating as a voting member on performance evaluation boards. (13) The approval of a…
- FAR 32.905 Payment documentation and process.…es. (1) A proper invoice must include the following items (except for interim payments on cost reimbursement contracts for services): (i) Name and address of the contractor. (ii) Invoice date and invoice number. (Contractors should date i…
- FAR 49.103 Methods of settlement.Settlement of terminated cost-reimbursement contracts and fixed-price contracts terminated for convenience may be effected by (a) negotiated agreement, (b) determination by the TCO, (c) costing-out under vouchers using SF 1034, Public Vouch…
- FAR 49.603-1 Fixed-price contracts—complete termination.… its proposal. (3) The Contractor certifies that all items of termination inventory, the costs of which were used in arriving at the amount of this settlement or the settlement of any subcontract settlement proposal included in this settle…
- FAR 52.216-8 Fixed Fee.…rescribed in 16.307(b), insert the following clause in solicitations and contracts when a cost-plus-fixed-fee contract (other than a facilities contract or a construction contract) is contemplated. Fixed Fee (JUN 2011) (a) The Government …
- FAR 52.216-9 Fixed Fee—Construction.…rescribed in 16.307(c), insert the following clause in solicitations and contracts when a cost-plus-fixed-fee construction contract is contemplated: Fixed Fee—Construction (JUN 2011) (a) The Government shall pay to the Contractor for perf…
- FAR 4.804-5 Procedures for closing out contract files.…e report is received; (6) Property clearance is received; (7) All interim or disallowed costs are settled; (8) Price revision is completed; (9) Subcontracts are settled by the prime contractor; (10) Prior year indirect cost rates are s…
- FAR 49.303-1 Submission of settlement proposal.The contractor shall submit a final settlement proposal covering unvouchered costs and any proposed fee to the TCO within 1 year from the effective date of termination, unless the period is extended by the TCO. The contractor shall use the …
- FAR 49.603-2 Fixed-price contracts—partial termination.… its proposal. (4) The Contractor certifies that all items of termination inventory, the costs of which were used in arriving at the amount of this settlement or the settlement of any subcontract settlement proposal included in this settle…
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.