The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
204 sections with “delivered by the Contractor”: the first 40
- DFARS 228.370-3 Aircraft not owned by or to be delivered to the Government.(a) When a contract involves aircraft not owned by or to be delivered to the Government, the contracting officer may use the clause at 252.228-7001 only if the contracting officer determines that it is in the best interest of the Government…
- DFARS 252.227-7038 Patent Rights—Ownership by the Contractor (Large Business).…icer has determined that the Contractor has rectified whatever deficiencies exist and has delivered all reports, disclosures, and other information required by this clause. (3) The Government will not make final payment under this contract…
- FAR 49.402-6 Repurchase against contractor's account.…livery requirements. The contracting officer may repurchase a quantity in excess of the undelivered quantity terminated for default when the excess quantity is needed, but excess cost may not be charged against the defaulting contractor for…
- DFARS 227.7203-2 Acquisition of other than commercial computer software and computer software documentation and associated rights.… software and the quantity of computer programs and computer software documentation to be delivered, any requirements for multiple users at one site or multiple site licenses, and the format and media in which the software or documentation …
- DFARS 252.227-7013 Rights in Technical Data—Other Than Commercial Products and Commercial Services.…ent made part of this contract. (5) Prior government rights. Technical data that will be delivered, furnished, or otherwise provided to the Government under this contract, in which the Government has previously obtained rights shall be del…
- DFARS 252.227-7014 Rights in Other Than Commercial Computer Software and Other Than Commercial Computer Software Documentation.…d to perform its intended purpose; or (3) Computer software documentation required to be delivered under a contract has been written, in any medium, in sufficient detail to comply with requirements under that contract. Developed exclusive…
- DFARS 252.227-7018 Rights in Other Than Commercial Technical Data and Computer Software—Small Business Innovation Research Program and Small Business Technology Transfer Program.…d to perform its intended purpose; or (4) Computer software documentation required to be delivered under a contract has been written, in any medium, in sufficient detail to comply with requirements under that contract. Developed exclusive…
- FAR 27.404-6 Inspection of data at the contractor's facility.…e contract. This right may be exercised up to 3 years after acceptance of all items to be delivered under the contract. The contract may specify data items that are not subject to inspection under paragraph (j) of the Alternate. If the cont…
- FAR 52.227-13 Patent Rights—Ownership by the Government.…icer has determined that the Contractor has rectified whatever deficiencies exist and has delivered all reports, disclosures, and other information required by this clause. (3) The Contracting Officer will not make final payment under this…
- FAR 47.207-5 Contractor responsibilities.… when the contractor is responsible for loading and unloading shipments. (f) Return of undelivered freight. The contracting officer shall insert the clause at 52.247-16, Contractor Responsibility for Returning Undelivered Freight, when the…
- FAR 25.003 Definitions.…aterial regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means—…
- FAR 27.404-2 Limited rights data and restricted computer software.…o withhold the data. To obtain delivery, the contract may identify and specify data to be delivered, or the contracting officer may require, by written request during contract performance, the delivery of data that has been withheld or iden…
- FAR 32.905 Payment documentation and process.…e of mailing or transmission.) (iii) Contract number or other authorization for supplies delivered or services performed (including order number and line item number). (iv) Description, quantity, unit of measure, unit price, and extended …
- FAR 47.303-6 F.o.b. destination.…nation of delivery term. F.o.b. destination means— (1) Free of expense to the Government delivered, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other loc…
- FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.… (iv) Description, quantity, unit of measure, unit price and extended price of the items delivered; (v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of ladi…
- FAR 52.216-5 Price Redetermination—Prospective.…ally redetermined in accordance with this clause, except that (1) the prices for supplies delivered and services performed before the first effective date of price redetermination (see paragraph (c) below) shall remain fixed and (2) in no e…
- FAR 52.216-6 Price Redetermination—Retroactive.… __ [Contracting Officer insert number of days] days after delivery of all supplies to be delivered and completion of all services to be performed under this contract, the Contractor shall submit— (i) Proposed prices; (ii) A statement in …
- FAR 52.216-16 Incentive Price Revision—Firm Target.…fficer insert number of days] days after the end of the month in which the Contractor has delivered the last unit of supplies and completed the services specified by item number in paragraph (a) of this clause, the Contractor shall submit i…
- FAR 52.216-17 Incentive Price Revision—Successive Targets.… following data: (i) A proposed firm fixed price or total firm target price for supplies delivered and to be delivered and services performed and to be performed. (ii) A detailed statement of all costs incurred in the performance of this …
- FAR 52.227-14 Rights in Data—General.…ta first produced in the performance of this contract; (ii) Form, fit, and function data delivered under this contract; (iii) Data delivered under this contract (except for restricted computer software) that constitute manuals or instruct…
- FAR 52.227-20 Rights in Data—SBIR Program.…ave unlimited rights in— (i) Data specifically identified in this contract as data to be delivered without restriction; (ii) Form, fit, and function data delivered under this contract; (iii) Data delivered under this contract (except for…
- FAR 52.227-21 Technical Data Declaration, Revision, and Withholding of Payment—Major Systems.…declaration with respect to all technical data that relate to a major system and that are delivered or required to be delivered under this contract or that are delivered within 3 years after acceptance of all items (other than technical dat…
- FAR 52.246-8 Inspection of Research and Development—Cost-Reimbursement.…after acceptance of all of the end items (other than designs, drawings, or reports) to be delivered under the contract, the Government may require the Contractor to replace or correct work not meeting contract requirements. Time devoted to …
- FAR 52.246-24 Limitation of Liability—High-Value Items.…not be liable for loss of or damage to property of the Government (including the supplies delivered under this contract) that (1) occurs after Government acceptance of the supplies delivered under this contract and (2) results from any defe…
- FAR 52.247-34 F.o.b. Destination.…, or other location to which shipment can be made) is located; and (2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving…
- DFARS 227.7103-10 Contractor identification and marking of technical data to be furnished with restrictive markings.…ive legend for which the data qualified. (c) Unmarked technical data. (1) Technical data delivered or otherwise provided under a contract without restrictive markings shall be presumed to have been delivered with unlimited rights and may b…
- DFARS 227.7108 Contractor data repositories.…tractor to— (1) Establish and maintain adequate procedures for protecting technical data delivered to or stored at the repository from unauthorized release or disclosure; (2) Establish and maintain adequate procedures for controlling the …
- DFARS 227.7203-10 Contractor identification and marking of computer software or computer software documentation to be furnished with restrictive markings.…computer software documentation. (1) Computer software or computer software documentation delivered or otherwise provided under a contract without restrictive markings shall be presumed to have been delivered with unlimited rights and may b…
- DFARS 252.216-7001 Economic Price Adjustment-Nonstandard Steel Items.…r default, any price revision shall be limited to the quantity of the item which has been delivered by the Contractor and accepted by the Government prior to receipt by the Contractor of the notice of termination. (h) If the Contractor's f…
- DFARS 252.225-7001 Buy American and Balance of Payments Program.…f the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029, unless an alternate percentage is est…
- DFARS 252.225-7036 Buy American—Free Trade Agreements—Balance of Payments Program.…f the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029, unless an alternate percentage is est…
- DFARS 252.225-7044 Balance of Payments Program—Construction Material.…aterial regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means—…
- DFARS 252.225-7045 Balance of Payments Program—Construction Material Under Trade Agreements.…aterial regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. Cost of components means—…
- DFARS 252.225-7052 Restriction on the Acquisition of Certain Magnets, Tantalum, and Tungsten.…plate, or sheet, in the grade appropriate for the production of a finished end item to be delivered to the Government under this contract; or a finished component assembled into an end item to be delivered to the Government under the contra…
- DFARS 252.227-7019 Validation of Asserted Restrictions—Computer Software.…ights to use, modify, reproduce, perform, display, release, or disclose computer software delivered, required to be delivered, or otherwise provided to the Government under this contract and shall be prepared to furnish to the Contracting O…
- DFARS 252.227-7020 Rights in special works.…ty. This clause applies to works first created, generated, or produced and required to be delivered under this contract. (b) Definitions. As used in this clause: (1) “Computer data base” means a collection of data recorded in a form capab…
- DFARS 252.227-7037 Validation of Asserted Restrictions on Technical Data.…ights of the Government and others to use, duplicate, release, or disclose technical data delivered, required to be delivered, or otherwise provided to the Government under the contract or subcontract. Except as provided in paragraph (b) of…
- DFARS 252.247-7016 Contractor liability for loss or damage.…nagement Regulation. (b) For shipments picked up under Schedule I, Outbound Services, or delivered under Schedule II, Inbound Services— (1) If notified within one year after delivery that the owner has discovered loss or damage to the own…
- FAR 1.102 Statement of guiding principles for the Federal Acquisition System.…n System will— (1) Satisfy the customer in terms of cost, quality, and timeliness of the delivered product or service by, for example— (i) Maximizing the use of commercial products and commercial services; (ii) Using contractors who have…
- FAR 17.106-3 Special procedures applicable to DoD, NASA, and the Coast Guard.…plier, or vendor company participating in such contract, such payment or benefit shall be delivered to such company in the most expeditious manner practicable. (b) Protection of existing authority. To the extent practicable, multiyear cont…
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.