32 sections with “estimated construction contract price”
- FAR 36.207 Pricing fixed-price construction contracts.… or site preparation are involved; (2) Quantities of work, such as excavation, cannot be estimated with sufficient confidence to permit a lump-sum offer without a substantial contingency; (3) Estimated quantities of work required may chan…
- FAR 11.702 Construction contracts.Construction contracts may authorize a variation in estimated quantities of unit-priced items. When the variation between the estimated quantity and the actual quantity of a unit-priced item is more than plus or minus 15 percent, an equitab…
- FAR 15.408 Solicitation provisions and contract clauses.…ery orders as follows: (A) For civilian agencies, insert the clause when— (1) The total estimated contract or order value exceeds the simplified acquisition threshold as defined in section 2.101 and (2) The contemplated contract type is …
- FAR 52.211-18 Variation in Estimated Quantity.…en a fixed-price construction contract is contemplated that authorizes a variation in the estimated quantity of unit-priced items: Variation in Estimated Quantity (APR 1984) If the quantity of a unit-priced item in this contract is an est…
- FAR 22.404-12 Labor standards for contracts containing construction requirements and option provisions that extend the term of the contract.…ion Wage Rate Requirements statute. The contracting officer must insert 50 percent as the estimated portion of the contract price that is labor unless the contracting officer determines, prior to issuance of the solicitation, that a differe…
- FAR 52.222-32 Construction Wage Rate Requirements—Price Adjustment (Actual Method).…tended amount for the line item will be obtained by multiplying the new unit price by the estimated quantity. If actual hours are not available from the preceding contract period for computation of the adjustment for a specific contract uni…
- FAR 52.232-27 Prompt Payment for Construction Contracts.… if provided for elsewhere in this contract, based on Contracting Officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project. (A) The due date for making such…
- FAR 52.236-22 Design Within Funding Limitations.…dures for the construction of the facilities designed at a price that does not exceed the estimated construction contract price as set forth in paragraph (c) below. When bids or proposals for the construction contract are received that exce…
- FAR 52.248-3 Value Engineering—Construction.…osts of processing the VECP. Instant contract savings, as used in this clause, means the estimated reduction in Contractor cost of performance resulting from acceptance of the VECP, minus allowable Contractor's development and implementati…
- FAR 2.101 Definitions.…e. While they do not indicate the accuracy of the prospective contractor's judgment about estimated future costs or projections, they do include the data forming the basis for that judgment. Cost or pricing data are more than historical acc…
- FAR 11.703 Contract clauses.…emplated. (c) The contracting officer shall insert the clause at 52.211-18, Variation in Estimated Quantity, in solicitations and contracts when a fixed-price construction contract is contemplated that authorizes a variation in the estimat…
- FAR 15.404-4 Profit.…equal the Government's total prenegotiation objective. Just as actual costs may vary from estimated costs, the contractor's actual realized profit or fee may vary from negotiated profit or fee, because of such factors as efficiency of perfo…
- FAR 19.505 Limitations on subcontracting and nonmanufacturer rule.…d to the solicitation. (5) Multiple-item acquisitions. (i) If at least 50 percent of the estimated contract value is composed of items that are manufactured, processed, or produced by small business concerns, then a waiver of the nonmanufa…
- FAR 52.245-1 Government Property.…tatement indicating current or future need. (6) Unit acquisition cost, or if applicable, estimated sales proceeds, estimated repair or replacement costs. (7) All known interests in commingled material of which includes Government material…
- DFARS 236.606-70 Statutory fee limitation.…reparation of designs, plans, drawings, and specifications to 10 percent of the project's estimated construction cost. (b) The 10 percent limit also applies to contract modifications, including modifications involving— (1) Work not initia…
- FAR 42.302 Contract administration functions.…nsure timely notification by the contractor of any anticipated overrun or underrun of the estimated cost under cost-reimbursement contracts. (17) Monitor the contractor's financial condition and advise the contracting officer when it jeopa…
- FAR 52.222-6 Construction Wage Rate Requirements.…formed at that site and shall be incorporated without any adjustment in contract price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work …
- FAR 52.228-15 Performance and Payment Bonds—Construction.…he award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does no…
- FAR 52.228-16 Performance and Payment Bonds—Other Than Construction.…the award price of the contract or, for requirements contracts, the price payable for the estimated quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not incl…
- FAR 3.104-1 Definitions.…for purposes of 41 U.S.C. chapter 21. In excess of $10,000,000 means— (1) The value, or estimated value, at the time of award, of the contract, including all options; (2) The total estimated value at the time of award of all orders under…
- FAR 36.609-1 Design within funding limitations.… is to be established during negotiations between the contractor and the Government. This estimated construction contract price shall take into account any statutory or other limitations and exclude any allowances for Government supervision…
- DFARS 236.601 Policy.(1) Written notification to the congressional defense committees is required if the total estimated contract price for architect-engineer services or construction design, in connection with military construction, military family housing, or…
- FAR 13.106-1 Soliciting competition.… include price or cost as an evaluation factor for award when a solicitation— (1) Has an estimated value above the simplified acquisition threshold; (2) Will result in multiple-award contracts (see subpart 16.5) that are for the same or s…
- FAR 25.604 Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute.…antly of iron or steel and the iron or steel is not produced in the United States) to the estimated price if all domestic manufactured construction material were used. If use of domestic manufactured construction material would increase the…
- FAR 31.205-10 Cost of money.…s of 31.205-52, which limit the allowability of cost of money, are followed; and (3) The estimated facilities capital cost of money is specifically identified and proposed in cost proposals relating to the contract under which the cost is …
- FAR 32.904 Determining payment due dates.…i) The due date for making progress payments based on contracting officer approval of the estimated amount and value of work or services performed, including payments for reaching milestones in any project, is 14 days after the designated b…
- FAR 36.205 Statutory cost limitations.…and (3) that the price on each schedule shall include an approximate apportionment of all estimated direct costs, allocable indirect costs, and profit. (c) The Government shall reject an offer if its prices exceed applicable statutory limi…
- FAR 36.213-2 Presolicitation notices.…etail to disclose the nature and volume of work (in terms of physical characteristics and estimated price range)(see 36.204); (2) State the location of the work; (3) Include tentative dates for issuing invitations, opening bids, and compl…
- FAR 48.104-2 Sharing acquisition savings.… accuracy with which the number of items to be delivered during the sharing period can be estimated and the probability of actual production of the projected quantity; (ii) The availability of funds for a lump-sum payment; and (iii) The a…
- FAR 52.222-34 Project Labor Agreement.…project means a Federal construction project within the United States for which the total estimated cost of the construction contract(s) to the Federal Government is $35 million or more. Project labor agreement means a pre-hire collective …
- DFARS 236.570 Additional provisions and clauses.… construction contracts that are funded with military construction appropriations and are estimated to exceed $1,000,000: (1) 252.236-7010, Overseas Military Construction—Preference for United States Firms, when contract performance will b…
- DFARS 252.236-7003 Payment for mobilization and preparatory work.…e contract work do not exceed— (i) The Contractor's cost for the work performed less the estimated value upon completion of the contract; and (ii) 100 percent of the cost to the contractor of any items having no appreciable salvage value;…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.