  • FAR 31.205-25 Manufacturing and production engineering costs.
    (a) The costs of manufacturing and production engineering effort as described in (1) through (4) below are all allowable: (1) Developing and deploying new or improved materials, systems, processes, methods, equipment, tools and techniques …
  • DFARS 215.304 Evaluation factors and significant subfactors.
    … section 812 of the National Defense Authorization Act for Fiscal Year 2011, consider the manufacturing readiness and manufacturing-readiness processes of potential contractors and subcontractors as a part of the source selection process fo…
  • FAR 2.101 Definitions.
    …ds (see 6.102(d)(2)). Building or work means construction activity as distinguished from manufacturing, furnishing of materials, or servicing and maintenance work. The terms include, without limitation, buildings, structures, and improveme…
  • FAR 6.302-3 Industrial mobilization; engineering, developmental, or research capability; or expert services.
    … States, its outlying areas, or Canada. (v) Continue in production, contractors that are manufacturing critical items, where there would otherwise be a break in production; or (vi) Divide current production requirements among two or more …
  • FAR 15.408 Solicitation provisions and contract clauses.
    …nting records (e.g., included in production costs as direct engineering labor, charged to manufacturing overhead). Also show how the costs would be allocated to the units at their various stages of contract completion. (9) Enter in Column …
  • FAR 31.205-18 Independent research and development and bid and proposal costs.
    …of developing an additional source for an existing product, or (2) development effort for manufacturing or production materials, systems, processes, methods, equipment, tools, and techniques not intended for sale. Independent research and …
  • FAR 15.404-4 Profit.
    … Conversion direct labor. This subfactor measures the contribution of direct engineering, manufacturing, and other labor to converting the raw materials, data, and subcontracted items into the contract items. Considerations include the dive…
  • DFARS 207.106 Additional requirements for major systems.
    …ir activities). (5) In accordance with 10 U.S.C. 4328, acquisition plans for engineering manufacturing and development and production of major systems as defined in 10 U.S.C. 3041(a) and 4202 and for major defense acquisition programs as d…
  • DFARS 227.7103-5 Government rights.
    …ssary for installation, operation, maintenance, or training purposes (other than detailed manufacturing or process data); (6) Corrections or changes to technical data furnished to the contractor by the Government; (7) Publicly available o…
  • FAR 15.404-1 Proposal analysis techniques.
    …nsic value of an item or service and shall be in proportion to an item's base cost (e.g., manufacturing or acquisition costs). Any method of distributing costs to line items that distorts the unit prices shall not be used. For example, dist…
  • FAR 15.407-4 Should-cost review.
    …icular elements to be analyzed are a function of the contract work task, elements such as manufacturing, pricing and accounting, management and organization, and subcontract and vendor management are normally reviewed in a should-cost revie…
  • FAR 45.101 Definitions.
    …ccurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to— (1) Items that cannot be found after a reasonable search; (2) Th…
  • FAR 49.202 Profit.
    …acter of the business, including the source and nature of materials and the complexity of manufacturing techniques; (7) The rate of profit that the contractor would have earned had the contract been completed; (8) The rate of profit both …
  • FAR 49.206-2 Bases for settlement proposals.
    …in process, finished parts, components, dies, jigs, fixtures, and tooling, at purchase or manufacturing cost; (ii) Charges such as engineering costs, initial costs, and general administrative costs; (iii) Costs of settlements with subcont…
  • FAR 52.245-1 Government Property.
    …ty does not include purposeful destructive testing, obsolescence, normal wear and tear or manufacturing defects. Loss of Government property includes, but is not limited to— (1) Items that cannot be found after a reasonable search; (2) Th…
  • DFARS 216.402-2 Performance incentives.
    …tion of penalties are included in the solicitation for a contract for the engineering and manufacturing development or production of a weapon system, including embedded software, if the program manager or comparable requiring activity offic…
  • DFARS 227.671 General.
    …uction and guidance of the personnel of the second source, jigs, dies, fixtures, or other manufacturing aids, or such other assistance, information, rights, or licenses as are needed to enable the second source to produce particular supplie…
  • DFARS 232.072-3 Cash flow forecasts.
    … payments for projected labor, both direct and indirect; (5) Reasonableness of projected manufacturing and production schedules; (6) Estimated amounts and timing of billings to customers (including progress payments), and customer payment…
  • DFARS 234.004 Acquisition strategy.
    …ions for contracts for the technical maturation and risk reduction phase, engineering and manufacturing development phase or production phase of a weapon system, including embedded software— (i) Clearly defined measurable criteria for engi…