48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
88 sections with “acceptance of all items”: the first 40
- FAR 52.246-24 Limitation of Liability—High-Value Items.…t (including the supplies delivered under this contract) that (1) occurs after Government acceptance of the supplies delivered under this contract and (2) results from any defects or deficiencies in the supplies. (b) The limitation of liab…
- DFARS 227.7103-14 Conformity, acceptance, and warranty of technical data.…rements of the contract pertaining to the delivery of technical data. (b) Conformity and acceptance. (1) Solicitations and contracts requiring the delivery of technical data shall specify the requirements the data must satisfy to be accept…
- FAR 11.103 Market acceptance.… to demonstrate that the items offered— (1) Have either— (i) Achieved commercial market acceptance; or (ii) Been satisfactorily supplied to an agency under current or recent contracts for the same or similar requirements; and (2) Otherw…
- FAR 12.402 Acceptance.(a) The acceptance paragraph in 52.212-4 is based upon the assumption that the Government will rely on the contractor's assurances that the commercial product or commercial service tendered for acceptance conforms to the contract requiremen…
- FAR 52.246-8 Inspection of Research and Development—Cost-Reimbursement.…ble at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or its subcontractors engaged in the contract performance. The Gover…
- FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.…e Specifications or Design Criteria (MAY 2001) (a) Definitions. As used in this clause— Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, owne…
- DFARS 252.246-7006 Warranty Tracking of Serialized Items.…ted period of time, amount of usage, or the occurrence of a specified event, after formal acceptance of delivery, for the Government to assert a contractual right for the correction of defects. Enterprise means the entity (e.g., a manufact…
- FAR 52.214-15 Period for Acceptance of Bids.As prescribed in 14.201-6(i), insert the following provision: Period for Acceptance of Bids (APR 1984) In compliance with the solicitation, the bidder agrees, if this bid is accepted within __ calendar days (60 calendar days unless a diff…
- DFARS 227.7103-8 Deferred delivery and deferred ordering of technical data.…f technical data identified as “deferred delivery” data at any time until two years after acceptance by the Government of all items (other than technical data or computer software) under the contract or contract termination, whichever is la…
- DFARS 227.7203-8 Deferred delivery and deferred ordering of computer software and computer software documentation.…tified as “deferred delivery” data or computer software at any time until two years after acceptance by the Government of all items (other than technical data or computer software) under the contract or contract termination, whichever is la…
- DFARS 252.227-7018 Rights in Other Than Commercial Technical Data and Computer Software—Small Business Innovation Research Program and Small Business Technology Transfer Program.…t, respectively. Notwithstanding any provision of this contract concerning inspection and acceptance, the Government may ignore or, at the Contractor's expense, correct or strike a marking if, in accordance with the applicable procedures of…
- DFARS 252.246-7005 Notice of Warranty Tracking of Serialized Items.…owing information no later than when the warranted items are presented for receipt and/or acceptance, in accordance with the clause at 252.246-7006— (i) The unique item identifier for each warranted item required by the attachment entitled…
- FAR 14.404-1 Cancellation of invitations after opening.…rative difficulties be encountered after bid opening that may delay award beyond bidders' acceptance periods, the several lowest bidders whose bids have not expired (irrespective of the acceptance period specified in the bid) should be requ…
- FAR 27.404-6 Inspection of data at the contractor's facility.…ting work performance under the contract. This right may be exercised up to 3 years after acceptance of all items to be delivered under the contract. The contract may specify data items that are not subject to inspection under paragraph (j)…
- FAR 52.227-21 Technical Data Declaration, Revision, and Withholding of Payment—Major Systems.…r required to be delivered under this contract or that are delivered within 3 years after acceptance of all items (other than technical data) delivered under this contract unless a different period is set forth in the contract. The Contract…
- FAR 52.246-17 Warranty of Supplies of a Noncomplex Nature.… of Supplies of a Noncomplex Nature (JUN 2003) (a) Definitions. As used in this clause— Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, owne…
- FAR 52.246-18 Warranty of Supplies of a Complex Nature.…nty of Supplies of a Complex Nature (MAY 2001) (a) Definitions. As used in this clause— Acceptance means the act of an authorized representative of the Government by which the Government assumes for itself, or as an agent of another, owne…
- DFARS 252.225-7009 Restriction on Acquisition of Certain Articles Containing Specialty Metals.…tem is considered to be “without modification” if it is not modified prior to contractual acceptance by the next higher tier in the supply chain. (A) Specialty metals in a COTS item that was accepted without modification by the next higher…
- DFARS 252.227-7026 Deferred delivery of technical data or computer software.…e, at any time during the performance of this contract, within two (2) years after either acceptance of all items (other than data or computer software) to be delivered under this contract or termination of this contract, whichever is later…
- DFARS 252.227-7027 Deferred ordering of technical data or computer software.… time during the performance of this contract or within a period of three (3) years after acceptance of all items (other than technical data or computer software) to be delivered under this contract or the termination of this contract, orde…
- DFARS 252.245-7005 Management and Reporting of Government Property.… and 1520. (2) If the schedules are acceptable, the plant clearance officer will confirm acceptance in the GFP module plant clearance capability, which will transmit a notification to the Contractor. The electronic acceptance is equivalent…
- FAR 15.504 Award to successful offeror.…t the Government may make subsequent awards on those additional items within the proposal acceptance period. (c) If the Optional Form (OF) 307, Contract Award, Standard Form (SF) 26, Award/Contract, or SF 33, Solicitation, Offer and Award,…
- FAR 32.904 Determining payment due dates.…ept as provided in paragraph (b)(3) of this section). (ii) The 30th day after Government acceptance of supplies delivered or services performed. (A) For a final invoice, when the payment amount is subject to contract settlement actions, a…
- FAR 46.407 Nonconforming supplies or services.…rcumstances (e.g., reasons of economy or urgency) when the contracting officer determines acceptance or conditional acceptance of supplies or services is in the best interest of the Government. The contracting officer must make this determi…
- FAR 48.001 Definitions.…t contract, future contract savings include savings on increases in quantities after VECP acceptance that are due to contract modifications, exercise of options, additional orders, and funding of subsequent year requirements on a multiyear …
- FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.…rms and Conditions—Commercial Products and Commercial Services (NOV 2023) (a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the…
- FAR 52.215-1 Instructions to Offerors—Competitive Acquisition.… selection authority in evaluating performance or schedule risk. (10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding con…
- FAR 52.232-25 Prompt payment.…t as provided in paragraph (a)(1)(ii) of this clause). (B) The 30th day after Government acceptance of supplies delivered or services performed. For a final invoice, when the payment amount is subject to contract settlement actions, accept…
- FAR 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts.… as provided in paragraph (a)(1)(iii) of this clause). (B) The 30th day after Government acceptance of the work or services completed by the Contractor. For a final invoice, when the payment amount is subject to contract settlement actions…
- FAR 52.232-27 Prompt Payment for Construction Contracts.…cting Officer for release to the Contractor. (ii) Final payments based on completion and acceptance of all work and presentation of release of all claims against the Government arising by virtue of the contract, and payments for partial de…
- FAR 52.246-6 Inspection—Time-and-Material and Labor-Hour.…ble at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government…
- FAR 52.248-1 Value Engineering.…t contract, future contract savings include savings on increases in quantities after VECP acceptance that are due to contract modifications, exercise of options, additional orders, and funding of subsequent year requirements on a multiyear …
- FAR 2.101 Definitions.…s; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301,…
- FAR 7.105 Contents of written acquisition plans.… the contract will be administered. In contracts for services, include how inspection and acceptance corresponding to the work statement's performance criteria will be enforced. In contracts for supplies or service contracts that include su…
- FAR 19.804-2 Agency offering.…the synopsis must include the geographical area of the competition set forth in the SBA's acceptance letter.
- FAR 32.703-2 Contracts conditioned upon availability of funds.…ause at 52.232-19, Availability of Funds for the Next Fiscal Year (see 32.706-1(b)). (c) Acceptance of supplies or services. The Government shall not accept supplies or services under a contract conditioned upon the availability of funds u…
- FAR 46.101 Definitions.As used in this part— Acceptance means the act of an authorized representative of the Government by which the Government, for itself or as agent of another, assumes ownership of existing identified supplies tendered or approves specific se…
- FAR 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.…ms and conditions of the solicitation may be excluded from consideration. (c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unle…
- FAR 52.213-4 Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).…ext of a clause may be accessed electronically at this/these address(es): (d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the…
- FAR 52.247-51 Evaluation of Export Offers.…he F.o.b. Origin clause of this contract. (c) F.o.b. port of loading with inspection and acceptance at origin. (1) Offers shall be evaluated on the basis of the lowest laid down cost to the Government at the overseas port of discharge via …
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.