48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
35 sections with “compelling reason”
- FAR 6.302-2 Unusual and compelling urgency.…a)(2). (2) When the agency's need for the supplies or services is of such an unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits…
- FAR 9.405 Effect of listing.…to subcontracts with these contractors, unless the agency head determines that there is a compelling reason for such action (see 9.405-1(a)(2), 9.405-2, 9.406-1(d), 9.407-1(d), and 26.505(e)). Contractors debarred, suspended, proposed for d…
- FAR 9.405-2 Restrictions on subcontracting.…onsent to subcontracts with such contractors unless the agency head states in writing the compelling reasons for this approval action. (See 9.405 concerning declarations of ineligibility affecting subcontracting.) (b) The Government suspen…
- FAR 28.203-5 Exclusion of individual sureties.…suretyship. (5) Any other cause affecting responsibility as a surety of such serious and compelling nature as may be determined to warrant exclusion. (c) An individual surety excluded pursuant to this section shall be entered as an exclus…
- FAR 33.103 Protests to the agency.…resolution of the protest, unless contract award is justified, in writing, for urgent and compelling reasons or is determined, in writing, to be in the best interest of the Government. Such justification or determination shall be approved a…
- FAR 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.… debarred, suspended, or proposed for debarment by any executive agency unless there is a compelling reason to do so. (c) The Contractor shall require each proposed subcontractor whose subcontract will exceed the threshold specified in FAR…
- DFARS 209.405 Effect of listing.(a) Under 10 U.S.C. 4654(b), when a department or agency determines that a compelling reason exists for it to conduct business with a contractor that is debarred or suspended from procurement programs, it must provide written notice of the …
- DFARS 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.…ate Sponsor of Terrorism (MAY 2019) (a) Unless the Government determines that there is a compelling reason to do so, the Contractor shall not enter into any subcontract in excess of the threshold specified in Federal Acquisition Regulation…
- FAR 3.602 Exceptions.…cting activity, may authorize an exception to the policy in 3.601 only if there is a most compelling reason to do so, such as when the Government's needs cannot reasonably be otherwise met.
- FAR 3.603 Responsibilities of the contracting officer.…actor is one to which award is otherwise prohibited under 3.601; and (2) There is a most compelling reason to make an award to that prospective contractor. (b) The contracting officer shall comply with the requirements and guidance in sub…
- FAR 9.405-1 Continuation of current contracts.…ent, or voluntarily excluded, unless the agency head makes a written determination of the compelling reasons for doing so, ordering activities shall not— (i) Place orders exceeding the guaranteed minimum under indefinite quantity contracts…
- FAR 9.406-1 General.…rnment, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor. (e)(1) When the suspending and debarring official h…
- FAR 9.407-1 General.…rnment, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor. (e)(1) When the suspending and debarring official h…
- FAR 14.404-1 Cancellation of invitations after opening.…ade to that responsible bidder who submitted the lowest responsive bid, unless there is a compelling reason to reject all bids and cancel the invitation. (2) Every effort shall be made to anticipate changes in a requirement before the date…
- FAR 14.404-2 Rejection of individual bids.…r debarment, or declared ineligible as of the bid opening date shall be rejected unless a compelling reason determination is made (see subpart 9.4). (i) Low bids received from concerns determined to be not responsible pursuant to subpart 9…
- FAR 15.505 Preaward debriefing of offerors.…ssful offeror as soon as practicable, but may refuse the request for a debriefing if, for compelling reasons, it is not in the best interests of the Government to conduct a debriefing at that time. The rationale for delaying the debriefing …
- FAR 15.506 Postaward debriefing of offerors.…ostaward debriefing in lieu of a preaward debriefing, or whose debriefing was delayed for compelling reasons beyond contract award, also should be debriefed within this time period. (3) An offeror that was notified of exclusion from the co…
- DFARS 209.405-2 Restrictions on subcontracting.…country that is a state sponsor of terrorism unless the agency head states in writing the compelling reasons for the subcontract. (See also 225.771.)
- DFARS 252.237-7019 Training for Contractor Personnel Interacting with Detainees.… of this clause— (1) Prior to interacting with detainees, or as soon as possible if, for compelling reasons, the Contracting Officer authorizes interaction with detainees prior to receipt of such training; and (2) Annually thereafter; and…
- FAR 33.104 Protests to GAO.…ntracting activity, on a nondelegable basis, upon a written finding that— (i) Urgent and compelling circumstances which significantly affect the interest of the United States will not permit awaiting the decision of the GAO; and (ii) Awar…
- DFARS 227.7203-13 Government right to review, verify, challenge, and validate asserted restrictions.…ppeal unless the agency head notifies the person asserting the restriction that urgent or compelling circumstances do not permit the Government to continue to respect the asserted restriction. See 252.227-7019(g) for restrictions applicable…
- DFARS 252.227-7019 Validation of Asserted Restrictions—Computer Software.… decision. (3)(i) The agency head, on a nondelegable basis, may determine that urgent or compelling circumstances do not permit awaiting the filing of suit in an appropriate court, or the rendering of a decision by a court of competent jur…
- DFARS 252.227-7037 Validation of Asserted Restrictions on Technical Data.…oregoing, where the head of an agency determines, on a nondelegable basis, that urgent or compelling circumstances will not permit waiting for the filing of a suit in the United States Court of Federal Claims, the Contractor or subcontracto…
- FAR 4.2104 Waivers.…alf of the entity, seeking the waiver submits to the head of the executive agency— (i) A compelling justification for the additional time to implement the requirements under 4.2102(a), as determined by the head of the executive agency; and…
- FAR 5.202 Exceptions.…02-2 (or, for purchases conducted using simplified acquisition procedures, if unusual and compelling urgency precludes competition to the maximum extent practicable) and the Government would be seriously injured if the agency complies with …
- FAR 5.203 Publicizing and response time.…e for receipt of offers can be extended or whether circumstances have become sufficiently compelling to justify proceeding with the proposed contract action under the authority of 5.202(a)(2). (h) In addition to other requirements set fort…
- FAR 8.405-6 Limiting sources.…2, or 8.405-3, the only circumstances that may justify the action are— (A) An urgent and compelling need exists, and following the procedures would result in unacceptable delays; (B) Only one source is capable of providing the supplies or…
- FAR 19.810 SBA appeals.… the acquisition if the contracting officer makes a written determination that urgent and compelling circumstances that significantly affect the interests of the United States will not permit waiting for a decision. (c) If the SBA appeal i…
- FAR 19.1305 HUBZone set-aside procedures.…unless the head of the contracting activity makes a written determination that urgent and compelling circumstances, which significantly affect the interests of the Government, exist. (3) Within 15 business days of SBA's notification to the…
- FAR 19.1405 Set-aside procedures.…unless the head of the contracting activity makes a written determination that urgent and compelling circumstances, which significantly affect the interests of the Government, exist. Within 15 working days of SBA's notification to the contr…
- FAR 19.1505 Set-aside procedures.…n the appeal, unless the head of the agency makes a written determination that urgent and compelling circumstances which significantly affect the interests of the United States compel award of the contract; (4) Within 15 business days of S…
- FAR 22.504 General requirements for project labor agreements.…ctors or subcontractors. (D) The agency's need for the project is of such an unusual and compelling urgency that a project labor agreement would be impracticable. (ii) Market research indicates that requiring a project labor agreement on …
- FAR 41.202 Procedures.…e record of negotiations, to GSA at the address specified at 41.301(a). Unless urgent and compelling circumstances exist, the contracting officer shall notify GSA prior to acquiring utility services without executing a tendered contract. Af…
- DFARS 225.7003-3 Exceptions.…he use of other than competitive procedures has been approved on the basis of unusual and compelling urgency in accordance with FAR 6.302-2. (5) Acquisitions of items specifically for commissary resale. (6) Acquisitions of items for test …
- DFARS 227.7103-13 Government right to review, verify, challenge, and validate asserted restrictions.…ppeal unless the agency head notifies the person asserting the restriction that urgent or compelling circumstances do not permit the Government to continue to respect the asserted restriction. (7) Multiple challenges to an asserted restric…
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.