37 sections with “corrective action plan”

  • FAR 52.245-1 Government Property.
    …es, loss of Government property, physical inventory results, audits and self-assessments, corrective actions, and other property-related reports as directed by the Contracting Officer. (vii) Relief of stewardship responsibility and liabili…
  • DFARS 242.7000 Contractor business system deficiencies.
    … contracting officers in contract administration activities. (c) Monitoring contractor's corrective action. The contracting officer, in consultation with the auditor or functional specialist, shall monitor the contractor's progress in corr…
  • DFARS 252.242-7005 Contractor business systems.
    …n 45 days of receipt of the notice, either correct the weaknesses or submit an acceptable corrective action plan showing milestones and actions to eliminate the weaknesses. (2) If the Contractor submits an acceptable corrective action plan…
  • DFARS 252.244-7001 Contractor Purchasing System Administration.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; and (iii) System disapproval, if the Contracting Officer determines that one or more material weaknesses remain. (e) If the Contr…
  • FAR 45.105 Contractors' property management system compliance.
    … shall request prompt correction of deficiencies, and shall request from the contractor a corrective action plan, including a schedule for correction of the deficiencies. If the contractor does not correct the deficiencies in accordance wit…
  • FAR 52.236-13 Accident Prevention.
    …ify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor's representative at the work site, shall be deemed sufficient notic…
  • FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.
    …iting, within ____ [Contracting Officer shall insert period of time] a recommendation for corrective actions, together with supporting information in sufficient detail for the Contracting Officer to determine what corrective action, if any,…
  • DFARS 215.407-5-70 Disclosure, maintenance, and review requirements.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (1) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 234.201 Policy.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (i) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 242.7203 Review procedures.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (1) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 242.7502 Policy.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (1) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 244.305-70 Policy.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (1) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 245.105 Contractors' property management system compliance.
    … any remaining material weaknesses and indicate the adequacy of any proposed or completed corrective action. The contracting officer shall— (1) Request that the contractor, within 45 days of receipt of the final determination, either corre…
  • DFARS 252.215-7002 Cost Estimating System Requirements.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; and (iii) System disapproval, if the Contracting Officer determines that one or more material weaknesses remain. (f) If the Contr…
  • DFARS 252.234-7002 Earned Value Management System.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; (iii) System noncompliance, when the Contractor's existing EVMS fails to comply with the earned value management system guidelines…
  • DFARS 252.242-7004 Material Management and Accounting System.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; and (iii) System disapproval if the Contracting Officer determines that one or more material weaknesses remain. (f) If the Contra…
  • DFARS 252.242-7006 Accounting System Administration.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; and (iii) System disapproval, if the Contracting Officer determines that one or more material weaknesses remain. (e) If the Contr…
  • DFARS 252.245-7003 Contractor Property Management System Administration.
    …ning— (i) Remaining material weaknesses; (ii) The adequacy of any proposed or completed corrective action; and (iii) System disapproval, if the Contracting Officer determines that one or more material weaknesses remain. (e) If the Contr…
  • FAR 52.246-2 Inspection of Supplies—Fixed-Price.
    …he former rejection or requirement for correction, and, when required, shall disclose the corrective action taken. (h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to …
  • FAR 52.203-13 Contractor Code of Business Ethics and Conduct.
    …ly discovery of improper conduct in connection with Government contracts; and (B) Ensure corrective measures are promptly instituted and carried out. (ii) At a minimum, the Contractor's internal control system shall provide for the follow…
  • FAR 52.246-8 Inspection of Research and Development—Cost-Reimbursement.
    … former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. (g)(1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, the Gove…
  • FAR 52.246-18 Warranty of Supplies of a Complex Nature.
    …en recommendation within ____ [Contracting Officer shall insert period of time] as to the corrective action required to remedy the breach. After the notice of breach, but not later than ____ [Contracting Officer shall insert period within w…
  • FAR 9.101 Definitions.
    …ntract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables. Surveying activity, as used in this subpart, means the cognizant contract administration office or, …
  • FAR 9.104-3 Application of standards.
    …re properly beyond the contractor's control, or that the contractor has taken appropriate corrective action. Past failure to apply sufficient tenacity and perseverance to perform acceptably is strong evidence of nonresponsibility. Failure t…
  • FAR 9.106-4 Reports.
    …ctivity shall specify the extent to which the prospective contractor plans, or has taken, corrective action. Lack of evidence that past failure to meet contractual requirements was the prospective contractor's fault does not necessarily ind…
  • FAR 15.305 Proposal evaluation.
    …o provide information on problems encountered on the identified contracts and the offeror corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the offero…
  • FAR 15.407-4 Should-cost review.
    …ew is to evaluate significant indirect cost elements in-depth, and identify and recommend corrective actions regarding inefficient and uneconomical practices. If it is conducted in conjunction with a program should-cost review, a separate o…
  • FAR 19.812 Contract administration.
    …hen appropriate, identification of causes of deficiencies in their products and suggested corrective action to make such products acceptable. (d) For 8(a) contracts exceeding 5 years including options, the contracting officer shall verify …
  • FAR 22.406-1 Policy.
    …ws to determine compliance by the contractor and subcontractors, and prompt initiation of corrective action when required; (3) Prompt investigation and disposition of complaints; and (4) Prompt submission of all reports required by this s…
  • FAR 44.304 Surveillance.
    …racting. The plan should also provide for reviewing the effectiveness of the contractor's corrective actions taken as a result of previous Government recommendations. Duplicative reviews of the same areas by CPSR and other surveillance moni…
  • FAR 52.203-16 Preventing Personal Conflicts of Interest.
    … to be taken by the Contractor in response to the violation. Provide follow-up reports of corrective actions taken, as necessary. Personal conflict-of-interest violations include— (i) Failure by a covered employee to disclose a personal co…
  • FAR 52.209-7 Information Regarding Responsibility Matters.
    …ntract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables. Federal contracts and grants with total value greater than $10,000,000 means— (1) The total value o…
  • FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.
    … former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert portion of labor rate attributable to profit.] (5)(i) If the Contractor fails to proceed with reasonable promptness …
  • FAR 52.246-3 Inspection of Supplies—Cost-Reimbursement.
    … former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. (g)(1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, the Gove…
  • FAR 52.246-6 Inspection—Time-and-Material and Labor-Hour.
    … former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. (g)(1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if t…
  • DFARS 204.804 Closeout of contract files.
    …r more modifications to such contracts without completing a reconciliation audit or other corrective action in accordance with FAR 4.804-5(a)(3) through (15), as appropriate, if each contract— (A)(1) For military construction (as defined a…
  • DFARS 252.235-7002 Animal welfare.
    …y in effect until the Contractor complies with the requirements. (2) Failure to complete corrective action within the time specified by the Contracting Officer may result in termination of this contract and, if applicable, removal of the C…