The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.

The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.

Ask the FAR

Try: · · ·

Clear

58 sections with “plant and equipment”: the first 40

  • DFARS 252.236-7003 Payment for mobilization and preparatory work.
    …h payment is provided under the terms of this contract, as follows— (1) For construction plant and equipment exceeding $25,000 in value per unit (as appraised by the Contracting Officer at the work site) acquired for the execution of the w…
  • FAR 52.246-19 Warranty of Systems and Equipment under Performance Specifications or Design Criteria.
    …ontract (irrespective of the f.o.b. point or the point of acceptance) to the Contractor's plant and return to the place of delivery specified in this contract. The Contractor shall also bear the responsibility for the supplies while in tran…
  • DFARS 236.570 Additional provisions and clauses.
    …this clause for major construction contracts that require— (A) Major or special items of plant and equipment; or (B) Large stockpiles of material which are in excess of the type, kind, and quantity which would be normal for a contractor q…
  • FAR 52.232-12 Advance Payments.
    … (1) The Contractor shall maintain with responsible insurance carriers— (i) Insurance on plant and equipment against fire and other hazards, to the extent that similar properties are usually insured by others operating plants and propertie…
  • DFARS 252.217-7016 Plant protection.
    As prescribed in 217.7104(a), use the following clause: Plant Protection (DEC 1991) (a) The Contractor shall provide, for the plant and work in process, reasonable safeguards against all hazards, including unauthorized entry, malicious mi…
  • DFARS 252.236-7004 Payment for mobilization and demobilization.
    …ent will pay all costs for the mobilization and demobilization of all of the Contractor's plant and equipment at the contract lump sum price for this item. (1) ________ percent of the lump sum price upon completion of the contractor's mobi…
  • FAR 2.101 Definitions.
    … limitation, buildings, structures, and improvements of all types, such as bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, …
  • FAR 22.401 Definitions.
    …roject; (2) Except as provided in paragraph (3) of this definition, includes fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided— (i) They are dedicated exclusively, or nearly so, …
  • FAR 31.109 Advance agreements.
    …s and idle capacity; (10) Severance pay to employees on support service contracts; (11) Plant reconversion; (12) Professional services (e.g., legal, accounting, and engineering); (13) General and administrative costs (e.g., corporate, d…
  • FAR 31.205-17 Idle facilities and idle capacity costs.
    …other related costs; e.g., property taxes, insurance, and depreciation. Facilities means plant or any portion thereof (including land integral to the operation), equipment, individually or collectively, or any other tangible capital asset,…
  • FAR 31.205-29 Plant protection costs.
    Costs of items such as (a) wages, uniforms, and equipment of personnel engaged in plant protection, (b) depreciation on plant protection capital assets, and (c) necessary expenses to comply with military requirements, are allowable.
  • FAR 45.602-3 Screening.
    The screening period begins upon the plant clearance officer's acceptance of an inventory disposal schedule. The plant clearance officer shall determine whether standard or special screening is appropriate and initiate screening actions. (…
  • FAR 46.706 Warranty terms and conditions.
    …ontract (irrespective of the f.o.b. point or the point of acceptance) to the contractor's plant and subsequent return. When defective items are returned to the contractor from other than the place of delivery specified in the contract, or w…
  • FAR 52.219-9 Small Business Subcontracting Plan.
    …mmercial services sold by either the entire company or a portion thereof (e.g., division, plant, or product line). Commercial product means a product that satisfies the definition of “commercial product” in Federal Acquisition Regulation (…
  • FAR 52.245-1 Government Property.
    …ractor's business; (2) All or substantially all of the Contractor's operation at any one plant or separate location; or (3) A separate and complete major industrial operation. Demilitarization means rendering a product unusable for, and …
  • FAR 52.247-29 F.o.b. Origin.
    …ering agency. (c) These Contractor responsibilities are specified for performance at the plant or plants at which the supplies are to be finally inspected and accepted, unless the facilities for shipment by carrier's equipment are not avai…
  • FAR 52.247-31 F.o.b. Origin, Freight Allowed.
    …ering agency. (c) These Contractor responsibilities are specified for performance at the plant or plants at which the supplies are to be finally inspected and accepted, unless the facilities for shipment by carrier's equipment are not avai…
  • FAR 52.247-32 F.o.b. Origin, Freight Prepaid.
    …the contract. (c) These Contractor responsibilities are specified for performance at the plant or plants at which these supplies are to be finally inspected and accepted, unless the facilities for shipment by carrier's equipment are not av…
  • FAR 52.247-55 F.o.b. Point for Delivery of Government-Furnished Property.
    …ernment makes delivery by railroad, the f.o.b. point will be private siding, Contractor's plant. If the Contractor's plant is not served by rail, the f.o.b. point will be railroad cars in the same or nearest city having rail service. The Go…
  • DFARS 217.171 Multiyear contracts for services.
    …when entering into a multiyear contract for services: (1) The portion of the cost of any plant or equipment amortized as a cost of contract performance should not exceed the ratio between the period of contract performance and the anticipa…
  • FAR 9.508 Examples.
    … A agrees to provide systems engineering and technical direction for the Navy on the powerplant for a group of submarines (i.e., turbines, drive shafts, propellers, etc.). Company A should not be allowed to supply any powerplant components.…
  • FAR 31.205-25 Manufacturing and production engineering costs.
    …nd deploying pilot production lines; (3) Improving current production functions, such as plant layout, production scheduling and control, methods and job analysis, equipment capabilities and capacities, inspection techniques, and tooling a…
  • FAR 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.
    …lies; (3) PSG 88, Live Animals; (4) PSG 89, Subsistence; (5) PSC 9410, Crude Grades of Plant Materials; (6) PSC 9430, Miscellaneous Crude Animal Products, Inedible; (7) PSC 9440, Miscellaneous Crude Agricultural and Forestry Products; …
  • DFARS 231.205-70 External restructuring costs.
    …ings and redeployments of a contractor's productive facilities or workforce (e.g., normal plant rearrangement or employee relocation), nor do they include other routine or ordinary activities charged as indirect costs that would otherwise h…
  • DFARS 252.217-7012 Liability and insurance.
    …tor's business; or (B) All or substantially all of the Contractor's operation at any one plant. (4) As to any risk that is assumed by the Government, the Government shall be subrogated to any claim, demand or cause of action against third…
  • FAR 17.107 Options.
    …cers must follow the requirements of subpart 17.2. Options should not include charges for plant and equipment already amortized, or other nonrecurring charges which were included in the basic contract.
  • FAR 42.302 Contract administration functions.
    …nd coordinate the removal of urgently required material from the strikebound contractor's plant upon instruction from, and authorization of, the contracting officer. (35) Perform traffic management services, including issuance and control …
  • FAR 52.246-18 Warranty of Supplies of a Complex Nature.
    …ontract (irrespective of the f.o.b. point or the point of acceptance) to the Contractor's plant and return. (6) All implied warranties of merchantability and fitness for a particular purpose are excluded from any obligation contained in th…
  • FAR 52.247-33 F.o.b. Origin, With Differentials.
    …nclude only the lowest cost to the Contractor for loading of shipment at the Contractor's plant or most favorable shipping point. The cost beyond that plant or point of bringing the supplies to the place of delivery and the cost of loading,…
  • DFARS 252.217-7009 Default.
    …ficer may deem appropriate, arrange for the completion of the work so terminated, at such plant or plants, including that of the Contractor, as may be designated by the Contracting Officer. (i) The Contractor shall continue the performance…
  • FAR 15.407-4 Should-cost review.
    …an range from a large-scale review examining the contractor's entire operation (including plant-wide overhead and selected major subcontractors) to a small-scale tailored review examining specific portions of a contractor's operation. (b) …
  • FAR 17.103 Definitions.
    …ns those costs which are generally incurred on a one-time basis and include such costs as plant or equipment relocation, plant rearrangement, special tooling and special test equipment, preproduction engineering, initial spoilage and rework…
  • FAR 47.305-3 F.o.b. origin solicitations.
    … Following are situations that might impose on the contractor a substantial cost above at plant or commercial shipping point prices because of Government-required routings: (i) The loading nature of the supplies; e.g., wheeled vehicles. (…
  • FAR 52.236-15 Schedules for Construction Contracts.
    …g and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work schedu…
  • FAR 52.247-57 Transportation Transit Privilege Credits.
    …truckload shipments of the supplies from offeror's original source, via offeror's transit plant or point, to the Government destination(s) including the carrier's transit privilege charge, less the applicable transit credit (i.e., the amoun…
  • FAR 15.407-2 Make-or-buy programs.
    …e contracting officer to evaluate the categorization or proposal. (v) Designation of the plant or division proposed to make each item or perform each work effort, and a statement as to whether the existing or proposed new facility is in or…
  • FAR 17.106-1 General.
    …r the multiyear requirements. Nonrecurring costs include such costs, where applicable, as plant or equipment relocation or rearrangement, special tooling and special test equipment, preproduction engineering, initial rework, initial spoilag…
  • FAR 19.704 Subcontracting plan requirements.
    …nt to a small business subcontractor (see 52.242-5). (b) Contractors may establish, on a plant or division-wide basis, a master subcontractingplan (see 19.701) that contains all the elements required by the clause at 52.219-9, Small Busine…
  • FAR 22.102-2 Administration.
    …ting contractors' labor requirements. These requirements may be to staff new or expanding plant facilities, including requirements for workers in all occupations and skills from local labor market areas or through the Federal-State employme…
  • FAR 22.402 Applicability.
    …quired, such as for installation of heavy generators or large refrigerator systems or for plant modification or rearrangement, the requirements of this subpart apply); or (ii) The construction work is so merged with nonconstruction work or…

Sections contractors look up most

FAR (chapter 1)

DFARS (chapter 2, Defense)

Understand the FAR fast: which parts to read first, in plain English

Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.

  1. Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
  2. The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
  3. Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
  4. Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
  5. Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
  6. Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.

Questions people ask

Is there an easy way to understand FAR rules without reading the whole thing?

Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.

  1. Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
  2. Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
  3. Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
  4. Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
  5. Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.

Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →

Is this the current FAR?

It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.

FAR rule changes →

Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.