48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
429 sections with “proposal”: the first 40
- FAR 3.104-4 Disclosure, protection, and marking of contractor bid or proposal information and source selection information.…provided for in this subsection, no person or other entity may disclose contractor bid or proposal information or source selection information to any person other than a person authorized, in accordance with applicable agency regulations or…
- FAR 15.201 Exchanges with industry before receipt of proposals.… interested parties, from the earliest identification of a requirement through receipt of proposals, are encouraged. Any exchange of information must be consistent with procurement integrity requirements (see 3.104). Interested parties incl…
- FAR 15.203 Requests for proposals.(a) Requests for proposals (RFPs) are used in negotiated acquisitions to communicate Government requirements to prospective contractors and to solicit proposals. RFPs for competitive acquisitions shall, at a minimum, describe the— (1) Gove…
- FAR 15.208 Submission, modification, revision, and withdrawal of proposals.(a) Offerors are responsible for submitting proposals, and any revisions, and modifications, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. Offerors may use any transmission me…
- FAR 15.305 Proposal evaluation.(a) Proposal evaluation is an assessment of the proposal and the offeror's ability to perform the prospective contract successfully. An agency shall evaluate competitive proposals and then assess their relative qualities solely on the facto…
- FAR 15.306 Exchanges with offerors after receipt of proposals.…nducting discussions, offerors may be given the opportunity to clarify certain aspects of proposals (e.g., the relevance of an offeror's past performance information and adverse past performance information to which the offeror has not prev…
- FAR 15.307 Proposal revisions.(a) If an offerors proposal is eliminated or otherwise removed from the competitive range, no further revisions to that offeror's proposal shall be accepted or considered. (b) The contracting officer may request or allow proposal revisions…
- FAR 15.404-1 Proposal analysis techniques.(a) General. The objective of proposal analysis is to ensure that the final agreed-to price is fair and reasonable. (1) The contracting officer is responsible for evaluating the reasonableness of the offered prices. The analytical techniqu…
- FAR 15.607 Criteria for acceptance and negotiation of an unsolicited proposal.(a) A favorable comprehensive evaluation of an unsolicited proposal does not, in itself, justify awarding a contract without providing for full and open competition. The agency point of contact shall return an unsolicited proposal to the of…
- FAR 49.107 Audit of prime contract settlement proposals and subcontract settlements.(a) The TCO shall refer each prime contractor settlement proposal valued at or above the threshold for obtaining certified cost or pricing data set forth in FAR 15.403-4(a)(1) to the appropriate audit agency for review and recommendations. …
- FAR 49.206-1 Submission of settlement proposals.… of the termination clause, the contractor should promptly submit to the TCO a settlement proposal for the amount claimed because of the termination. The final settlement proposal must be submitted within one year from the effective date of…
- FAR 49.206-2 Bases for settlement proposals.(a) Inventory basis. (1) Use of the inventory basis for settlement proposals is preferred. Under this basis, the contractor may propose only costs allocable to the terminated portion of the contract, and the settlement proposal must itemize…
- FAR 49.602-1 Termination settlement proposal forms.(a) Standard Form 1435, Settlement Proposal (Inventory Basis), shall be used to submit settlement proposals resulting from the termination of fixed-price contracts if the proposals are computed on an inventory basis (see 49.206-2(a)). (b) …
- FAR 52.214-23 Late submissions, modifications, revisions, and withdrawals of technical proposals under two-step sealed bidding.…wing provision: Late Submissions, Modifications, Revisions, and Withdrawals of Technical Proposals Under Two-Step Sealed Bidding (NOV 1999) (a) Bidders are responsible for submitting technical proposals, and any modifications or revisions…
- FAR 52.215-5 Facsimile Proposals.As prescribed in 15.209(e), insert the following provision: Facsimile Proposals (OCT 1997) (a) Definition. Facsimile proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposa…
- FAR 52.236-28 Preparation of Proposals—Construction.As prescribed in 36.520, insert the following provision: Preparation of Proposals—Construction (OCT 1997) (a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. T…
- DFARS 252.227-7016 Rights in Bid or Proposal Information.…-6(e)(1), 227.7104-4(b)(1), or 227.7203-6(b), use the following clause: Rights In Bid or Proposal Information (JAN 2025) (a) Definitions. (a) Definitions. As used in this clause— Computer software is defined in— (1) The 252.227-7014, R…
- FAR 6.401 Sealed bidding and competitive proposals.Sealed bidding and competitive proposals, as described in parts 14 and 15, are both acceptable procedures for use under subparts 6.1, 6.2; and, when appropriate, under subpart 6.3. (a) Sealed bids. (See part 14 for procedures.) Contracting…
- FAR 15.207 Handling proposals and information.(a) Upon receipt at the location specified in the solicitation, proposals and information received in response to a request for information (RFI) shall be marked with the date and time of receipt and shall be transmitted to the designated o…
- FAR 15.605 Content of unsolicited proposals.Unsolicited proposals should contain the following information to permit consideration in an objective and timely manner: (a) Basic information including— (1) Offeror's name and address and type of organization; e.g., profit, nonprofit, e…
- FAR 27.407 Rights to technical data in successful proposals.The clause at 52.227-23, Rights to Proposal Data (Technical), allows the Government to acquire unlimited rights to technical data in successful proposals. Pursuant to the clause, the prospective contractor is afforded the opportunity to spe…
- FAR 31.205-18 Independent research and development and bid and proposal costs.… the term development, defined in this subsection. Basic research, (See 2.101). Bid and proposal (B&P) costs means the costs incurred in preparing, submitting, and supporting bids and proposals (whether or not solicited) on potential Gove…
- FAR 52.204-22 Alternative Line Item Proposal.As prescribed in 4.1008, insert the following provision: Alternative Line Item Proposal (JAN 2017) (a) The Government recognizes that the line items established in this solicitation may not conform to the Offeror's practices. Failure to c…
- FAR 15.404-2 Data to support proposal analysis.…rovide— (i) Technical, audit, and special reports associated with the cost elements of a proposal, including subcontracts; (ii) Information on related pricing practices and history; (iii) Information to help contracting officers determin…
- FAR 49.304-2 Submission of settlement proposal (fee only).The contractor shall limit the settlement proposal to a proposed reduction in the amount of fee. The final settlement proposal shall be submitted to the TCO within one year from the effective date of termination, unless the period is extend…
- FAR 49.605 Request to settle subcontractor settlement proposals.Contractors requesting authority to settle subcontractor settlement proposals shall furnish applicable information from the list below and any additional information required by the contracting officer: (a) Name of contractor and address o…
- FAR 52.214-24 Multiple Technical Proposals.As prescribed in 14.201-6(s), insert the following provision: Multiple Technical Proposals (APR 1984) In the first step of this two-step acquisition, solicited sources are encouraged to submit multiple technical proposals presenting diffe…
- FAR 52.230-7 Proposal Disclosure—Cost Accounting Practice Changes.As prescribed in 30.201-3(c), insert the following provision: Proposal Disclosure—Cost Accounting Practice Changes (APR 2005) The offeror shall check “yes” below if the contract award will result in a required or unilateral change in cost…
- FAR 53.215-1 Solicitation and receipt of proposals.…ification of Contract. SF 30, prescribed in 53.243, may be used for amending requests for proposals and for amending requests for information, as specified in 15.210(b). (c) SF 33 (Rev. 9/97), Solicitation, Offer and Award. SF 33, prescrib…
- DFARS 252.236-7000 Modification proposals—price breakdown.As prescribed in 236.570(a), use the following clause: Modification Proposals—Price Breakdown (DEC 1991) (a) The Contractor shall furnish a price breakdown, itemized as required and within the time specified by the Contracting Officer, wi…
- FAR 49.108-6 Delay in settling subcontractor settlement proposals.…O may settle with the prime contractor. The TCO shall except the subcontractor settlement proposal from the settlement in whole or part and reserve the rights of the Government and the prime contractor with respect to the subcontractor prop…
- FAR 49.303-1 Submission of settlement proposal.The contractor shall submit a final settlement proposal covering unvouchered costs and any proposed fee to the TCO within 1 year from the effective date of termination, unless the period is extended by the TCO. The contractor shall use the …
- FAR 49.303-3 Audit of settlement proposal.The TCO shall submit the settlement proposal to the appropriate audit agency for review (see 49.107). However, if the settlement proposal is limited to an adjustment of fee, no referral to the audit agency is required.
- FAR 52.227-23 Rights to Proposal Data (Technical).As prescribed in 27.409(l), insert the following clause: Rights to Proposal Data (Technical) (JUN 1987) Except for data contained on pages ___, it is agreed that as a condition of award of this contract, and notwithstanding the conditions…
- DFARS 215.404-1 Proposal analysis techniques.(a) General. (i) Follow the procedures at PGI 215.404-1 for proposal analysis. (ii) For spare parts or support equipment, perform an analysis of— (A) Those line items where the proposed price exceeds by 25 percent or more the lowest price…
- DFARS 252.215-7009 Proposal Adequacy Checklist.As prescribed in 215.408(4), use the following provision: Proposal Adequacy Checklist (MAR 2023) The offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested infor…
- DFARS 252.215-7011 Requirements for Submission of Proposals to the Administrative Contracting Officer and Contract Auditor.…rescribed in 215.408(5)(ii), use the following provision: Requirements for Submission of Proposals to the Administrative Contracting Officer and Contract Auditor (JAN 2018) When the proposal is submitted, the Offeror shall also submit one…
- DFARS 252.215-7012 Requirements for Submission of Proposals via Electronic Media.…escribed in 215.408(5)(iii), use the following provision: Requirements for Submission of Proposals Via Electronic Media (JAN 2018) The Offeror shall submit the cost portion of the proposal via the following electronic media: [Insert media…
- FAR 18.111 Oral requests for proposals.Oral requests for proposals are authorized under certain conditions. (See 15.203(f).)
- FAR 49.109-6 Joint settlement of two or more settlement proposals.…ctor, the TCO or TCO's concerned may negotiate jointly two or more termination settlement proposals of the same contractor under different contracts, even though the contracts are with different contracting offices or agencies. In such case…
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.