48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The FAR is the Federal Acquisition Regulation (Title 48, chapter 1 of the Code of Federal Regulations): the rules every federal agency follows when it buys goods and services, from market research and set-asides to contract clauses. It is not the aviation rules (the Federal Aviation Regulations, Title 14). The DFARS is the Defense Department's supplement to it. Every part and section is here, searchable, with a plain-English guide to each part and answers cited to the sections.
The codified text (eCFR, as of 2026-10-29). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule. Today's text against the overhaul, side by side.
Ask the FAR
Try: · · ·
56 sections with “withholding of payment”: the first 40
- FAR 52.232-9 Limitation on Withholding of Payments.…opment contract is contemplated that includes two or more terms authorizing the temporary withholding of amounts otherwise payable to the contractor for supplies delivered or services performed: Limitation on Withholding of Payments (APR 1…
- FAR 52.227-21 Technical Data Declaration, Revision, and Withholding of Payment—Major Systems.…bed in 27.409(j), insert the following clause: Technical Data Declaration, Revision, and Withholding of Payment—Major Systems (MAY 2014) (a) Scope of declaration. The Contractor shall provide, in accordance with 41 U.S.C. 2302(e)(7), the …
- DFARS 252.227-7030 Technical data—withholding of payment.…cribed at 227.7103-6(e)(2) or 227.7104-4(b)(6), use the following clause: Technical Data—Withholding of Payment (MAR 2000) (a) If technical data specified to be delivered under this contract, is not delivered within the time specified by …
- FAR 22.406-9 Withholding from or suspension of contract payments.(a) Withholding from contract payments. If the contracting officer believes a violation exists (see 22.406-8), or upon request of the Department of Labor, the contracting officer must withhold from payments due the contractor an amount equa…
- DFARS 222.406-9 Withholding from or suspension of contract payments.(a) Withholding from contract payments. The contracting officer shall contact the labor advisor for assistance when payments due a contractor are not available to satisfy that contractor's liability for Construction Wage Rate Requirements o…
- FAR 22.1022 Withholding of contract payments.Any violations of the clause at 52.222-41, Service Contract Labor Standards, as amended, renders the responsible contractor liable for the amount of any deductions, rebates, refunds, or underpayments (which includes nonpayment) of compensat…
- FAR 28.106-7 Withholding contract payments.…, the surety must agree to hold the Government harmless from any liability resulting from withholding the final payment. The contracting officer will authorize final payment upon agreement between the contractor and surety or upon a judicia…
- FAR 52.232-27 Prompt Payment for Construction Contracts.… to the ability of a subcontractor to furnish a performance bond and a payment bond; (2) Withholding permitted. Permit the Contractor or subcontractor to make a determination that part or all of the subcontractor's request for payment may …
- DFARS 227.7103-14 Conformity, acceptance, and warranty of technical data.… conform to the contractual requirements. (2) The clause at 252.227-7030, Technical Data—Withholding of Payment, provides for withholding up to 10 percent of the contract price pending correction or replacement of the nonconforming technic…
- FAR 29.204 Federal excise tax on specific foreign contract payments.…CFR 1.5000C-1 through 1.5000C-7 require acquiring agencies to collect this excise tax via withholding on applicable contract payments (see 29.402-3, 31.205-41(b)(8)). Agencies merely withhold the tax (section 5000C tax) for the Internal Rev…
- FAR 52.222-7 Withholding of Funds.As prescribed in 22.407(a), insert the following clause: Withholding of Funds (MAY 2014) The Contracting Officer shall, upon his or her own action or upon written request of an authorized representative of the Department of Labor, withhol…
- DFARS 242.7000 Contractor business system deficiencies.… withhold payments, the contracting officer shall ensure that the total amount of payment withholding under 252.242-7005 does not exceed 10 percent of progress payments, performance-based payments, and interim payments under cost-reimbursem…
- FAR 22.1905 Enforcement of Executive Order Minimum Wage Requirements.… violation. If the contractor does not remedy the violation, the Administrator may direct withholding of payments due on the contract or any other contract between the contractor and the Federal Government. Upon final decision and direction…
- DFARS 252.244-7001 Contractor Purchasing System Administration.…in this clause, may result in disapproval of the system by the Contracting Officer and/or withholding of payments. (c) System criteria. The Contractor's purchasing system shall— (1) Have an adequate system description including policies, …
- FAR 32.804 Extent of assignee's protection.…omply with, the terms of the contract. (iv) Taxes or social security contributions. (v) Withholding or nonwithholding of taxes or social security contributions. (c) In some circumstances, a setoff may be appropriate even though the assig…
- FAR 52.229-12 Tax on Certain Foreign Procurements.…c)(1) If the Contractor is a foreign person and has only a partial or no exemption to the withholding, the Contractor shall include the Department of the Treasury Internal Revenue Service Form W-14, Certificate of Foreign Contracting Party …
- FAR 52.232-10 Payments Under Fixed-Price Architect-Engineer Contracts.…Contracting Officer or authorized representative. The Contracting Officer shall require a withholding from amounts due under paragraph (a) of this clause of up to 10 percent only if the Contracting Officer determines that such a withholding…
- DFARS 252.242-7005 Contractor business systems.…rial weaknesses, the final determination will include a notice to withhold payments. (e) Withholding payments. (1) If the Contracting Officer issues the final determination with a notice to withhold payments for material weaknesses in a c…
- FAR 22.406-10 Disposition of disputes concerning construction contract labor standards enforcement.… workers; (2) Hours of work; (3) Wage rates and payment; (4) Payment of overtime; (5) Withholding practices; and (6) The applicability of the labor standards requirements under varying circumstances. (b) Generally, these differences a…
- FAR 22.1309 Actions because of noncompliance.… Equal Opportunity for Veterans. These sanctions (see 41 CFR 60-300.66) may include— (a) Withholding progress payments; (b) Termination or suspension of the contract; or (c) Debarment of the contractor.
- FAR 22.1407 Actions because of noncompliance.…y for Workers with Disabilities. These sanctions (see 41 CFR 60-741.66) may include— (a) Withholding from payments otherwise due; (b) Termination or suspension of the contract; or (c) Debarment of the contractor.
- FAR 22.2109 Enforcement of Executive Order 13706 paid sick leave requirements.…anted, in accordance with the procedures in 29 CFR 13.43. (d) Remedies and sanctions—(1) Withholding or suspending payment. The contracting officer shall, upon his or her own action or upon written request of the Administrator of the Wage …
- FAR 32.111 Contract clauses for noncommercial purchases.…templated. (2) A clause, substantially the same as the clause at 52.232-9, Limitation on Withholding of Payments, in solicitations and contracts when a supply contract, research and development contract, service contract, time-and-material…
- FAR 32.606 Debt collection.…uested installment payments or deferment of collection, the payment office shall initiate withholding of principal, interest, penalties, and administrative charges. In the event the contract is assigned under the Assignment of Claims Act of…
- FAR 52.227-13 Patent Rights—Ownership by the Government.…o appropriate conditions to protect the confidentiality of the information involved. (g) Withholding of payment. (This paragraph does not apply to subcontracts.) (1) Any time before final payment under this contract, the Contracting Office…
- FAR 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation.… its implementing regulations at 26 CFR 1.5000C-1 through 1.5000C-7. (c) Exemptions from withholding under this provision are described at 26 CFR 1.5000C-1(d)(5) through (7). The Offeror would claim an exemption from the withholding by usi…
- DFARS 252.227-7038 Patent Rights—Ownership by the Contractor (Large Business).…o appropriate conditions to protect the confidentiality of the information involved. (k) Withholding of payment (this paragraph does not apply to subcontracts). (1) Any time before final payment under this contract, the Contracting Officer…
- DFARS 252.242-7006 Accounting System Administration.… maintain an acceptable accounting system, as defined in this clause, shall result in the withholding of payments if the contract includes the clause at 252.242-7005, Contractor Business Systems, and also may result in disapproval of the sy…
- DFARS 252.245-7003 Contractor Property Management System Administration.…in this clause, may result in disapproval of the system by the Contracting Officer and/or withholding of payments. (c) System criteria. The Contractor's property management system shall be in accordance with paragraphs (b) and (f) of the c…
- FAR 27.305-2 Administration by the Government.… deficient, the contracting officer should explain to the contractor its obligations. The withholding of payments provision (if any) of the patent rights clause may be invoked if the contractor fails to meet the obligations required by the …
- FAR 27.406-3 Major system acquisition.(a) The clause at 52.227-21, Technical Data Declaration, Revision, and Withholding of Payment—Major Systems, implements 41 U.S.C. 2302(e). When using the clause at 52.227-21, the section of the contract specifying data delivery requirements…
- FAR 27.409 Solicitation provisions and contract clauses…th 27.406-3(a), insert the clause at 52.227-21, Technical Data Declaration, Revision, and Withholding of Payment—Major Systems, in contracts for major systems acquisitions or for support of major systems acquisitions. This requirement inclu…
- FAR 33.104 Protests to GAO.…s that the agency intends to withhold from the protester and the reasons for the proposed withholding. Any objection to the scope of the agency's proposed disclosure or nondisclosure of the documents must be filed with the GAO and the other…
- FAR 52.216-10 Incentive Fee.…stimated cost initially negotiated, adjusted in accordance with paragraph (d) below. (c) Withholding of payment. (1) Normally, the Government shall pay the fee to the Contractor as specified in the Schedule. However, when the Contracting O…
- FAR 52.222-41 Service Contract Labor Standards.…A pay period under this statute may not be of any duration longer than semi-monthly. (k) Withholding of Payments and Termination of Contract. The Contracting Officer shall withhold or cause to be withheld from the Government Prime Contract…
- DFARS 227.7103-6 Contract clauses.…1) 252.227-7016, Rights in Bid or Proposal Information. (2) 252.227-7030, Technical Data—Withholding of Payment. (3) 252.227-7037, Validation of Asserted Restrictions on Technical Data (paragraph (e) of the clause contains information tha…
- DFARS 227.7104-4 Solicitation provisions and contract clauses.…mputer Software Previously Delivered to the Government. (6) 252.227-7030, Technical Data-Withholding of Payment. (7) 252.227-7037, Validation of Asserted Restrictions on Technical Data (paragraph (e) of the clause contains information tha…
- DFARS 246.870-2 Policy.…o so may result in disapproval of the purchasing system by the contracting officer and/or withholding of payments (see 252.244-7001, Contractor Purchasing System Administration). (2) System criteria. A counterfeit electronic part detection…
- DFARS 252.246-7007 Contractor Counterfeit Electronic Part Detection and Avoidance System.…use, may result in disapproval of the purchasing system by the Contracting Officer and/or withholding of payments and affect the allowability of costs of counterfeit electronic parts or suspect counterfeit electronic parts and the cost of r…
- FAR 16.307 Contract clauses.…t a cost-sharing contract is contemplated, and if the contracting officer determines that withholding of a portion of allowable costs is not required, the contracting officer shall use the clause with its Alternate I. (f)(1) The contractin…
Sections contractors look up most
- FAR 52.204-14 Service Contract Reporting Requirements
- FAR 52.203-6 Restrictions on Subcontractor Sales to the Government
- FAR 52.246-11 Higher-Level Contract Quality Requirement
- FAR 52.243-4 Changes
- FAR 52.225-2 Buy American Certificate
- FAR 52.212-2 Evaluation—Commercial Products and Commercial Services
- FAR 52.227-16 Additional Data Requirements
- FAR 52.216-22 Indefinite Quantity
- FAR 52.219-16 Liquidated Damages—Subcontracting Plan
- FAR 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
- FAR 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
- FAR 52.216-4 Economic Price Adjustment—Labor and Material
- FAR 52.209-3 First Article Approval—Contractor Testing
- FAR 15.209 Solicitation provisions and contract clauses
- FAR 15.404-3 Subcontract pricing considerations
- FAR 15.406-2 Certificate of current cost or pricing data
- FAR 31.201-3 Determining reasonableness
- FAR 31.205-20 Interest and other financial costs
- FAR 8.405-2 Ordering procedures for services requiring a statement of work
- FAR 35.017 Federally Funded Research and Development Centers
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Understand the FAR fast: which parts to read first, in plain English
Yes: start with the few parts that match what you are doing, read the plain-English guide to each, and ask questions in plain words instead of reading all 3,399 FAR sections. SpendQuery's FAR and DFARS navigator has every part and section, searchable, and Ask the FAR answers from the matching sections and cites each one.
- Which FAR. The Federal Acquisition Regulation, the rules for government contracting, is Title 48 of the Code of Federal Regulations. The Federal Aviation Regulations, also called FAR, are Title 14 and aren't here.
- The parts a small business meets first. Part 2, Definitions of Words and Terms (3 sections); Part 19, Small Business Programs (126 sections); Part 13, Simplified Acquisition Procedures (49 sections); Part 15, Contracting by Negotiation (81 sections); Part 52, Solicitation Provisions and Contract Clauses (680 sections).
- Search, or open a part. Search every section by word at the top of this page, or open a part for its sections and its plain-English guide.
- Ask the FAR. Type a question in plain words in the Ask the FAR box above: the answer quotes and links the sections it comes from.
- Check deviations and rule changes. This is the codified eCFR text as of 2026-10-29. The FAR is being rewritten (the Revolutionary FAR Overhaul) and agencies apply class deviations before the formal rules are published, so check the note on each part and the FAR rule changes in progress before relying on a section in a contract.
- Terms and the official wording. The glossary explains contracting terms; for the final wording, acquisition.gov ↗ and the eCFR are the official sources.
Questions people ask
Is there an easy way to understand FAR rules without reading the whole thing?
Start with the five parts a small business meets first, read each part's plain-English guide, and ask questions in plain words: Ask the FAR answers from the matching sections and cites each one.
- Part 2, Definitions: what the terms mean (simplified acquisition threshold, commercial product).
- Part 19, Small Business Programs: set-asides, the rule of two, size, 8(a), HUBZone, WOSB and SDVOSB.
- Part 13, Simplified Acquisition Procedures: how buys up to the simplified acquisition threshold are made.
- Part 15, Contracting by Negotiation: proposals, evaluation, discussions and debriefings.
- Part 52, Solicitation Provisions and Contract Clauses: the clauses your contract will contain.
Part 2 → · Part 19 → · Part 13 → · Part 15 → · Part 52 → · Search the FAR, rules and executive orders together → · Guide: the FAR without reading all of it →
Is this the current FAR?
It is the codified text from the eCFR, refreshed monthly. The FAR is being rewritten (the Revolutionary FAR Overhaul): agencies apply class deviations with new text before the formal rules are published, so check the overhaul notice on each part and the rule changes in progress.
Browse by industry, rule and question
Federal contracts by industry, FY2026
- Other Electronic Component Manufacturing · NAICS 334419 · $1.20B
- Industrial Nonbuilding Structure Construction · NAICS 234930 · $1.19B
- Pharmacy Benefit Management and Other Third Party Administration of Insurance and Pension Funds · NAICS 524292 · $1.18B
- Telecommunications Resellers · NAICS 517310 · $1.17B
- Irradiation Apparatus Manufacturing · NAICS 334517 · $1.15B
- Environmental Consulting Services · NAICS 541620 · $1.14B
- All Other Support Services · NAICS 561990 · $1.12B
- Surgical and Medical Instrument Manufacturing · NAICS 339112 · $1.11B
- Advertising Agencies · NAICS 541810 · $1.09B
- Flight Training · NAICS 611512 · $1.05B
Spending questions, answered
- For each agency in 2025, show new money committed and money cancelled
- Which agency obligated the most money in fiscal year 2025?
- Who were the biggest federal contractors working in Puerto Rico in 2025?
- Humana's federal revenue trend
- Florida counties in FY2025 — federal spending and FEMA disaster aid side by side
- SNAP payment errors over time
- How much did California pay each county government in FY2025?
- What did Love Field spend in FY2026?
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.