281 sections with “Unit price”: the first 40
- FAR 52.215-14 Integrity of Unit Prices.As prescribed in 15.408(f)(1), insert the following clause: Integrity of Unit Prices (NOV 2021) (a) Any proposal submitted for the negotiation of prices for items of supplies shall distribute costs within contracts on a basis that ensures…
- FAR 52.216-2 Economic Price Adjustment—Standard Supplies.…nomic Price Adjustment—Standard Supplies (NOV 2021) (a) The Contractor warrants that the unit price stated in the Schedule for ____ [offeror insert Schedule line item number] is not in excess of the Contractor's applicable established pric…
- FAR 52.216-3 Economic Price Adjustment—Semistandard Supplies.…ractor further warrants that, as of the date of this contract, any difference between the unit prices stated in the contract for these line items and the Contractor's established prices for like quantities of the nearest commercial equivale…
- FAR 52.216-4 Economic Price Adjustment—Labor and Material.…uring contract performance, the rates of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase…
- FAR 52.222-32 Construction Wage Rate Requirements—Price Adjustment (Actual Method).… being requested. (c) The Contracting Officer will adjust the contract price or contract unit price labor rates to reflect the Contractor's actual increase or decrease in wages and fringe benefits to the extent that the increase is made to…
- DFARS 252.216-7000 Economic Price Adjustment—Basic Steel, Aluminum, Brass, Bronze, or Copper Mill Products.…ket price for a commercial product sold in substantial quantities to the general public. Unit price excludes any part of the price which reflects requirements for preservation, packaging, and packing beyond standard commercial practice. (…
- DFARS 252.216-7001 Economic Price Adjustment-Nonstandard Steel Items.…dar month, then that accounting period shall be used in lieu of month. (b) Each contract unit price shall be subject to revision, under the terms of this clause, to reflect changes in the cost of labor and steel. For purpose of this price …
- FAR 36.207 Pricing fixed-price construction contracts.…basis (when a lump sum is paid for the total work or defined parts of the work), (2) on a unit-price basis (when a unit price is paid for a specified quantity of work units), or (3) using a combination of the two methods. (b) Lump-sum pric…
- DFARS 252.216-7003 Economic price adjustment—wage rates or material prices controlled by a foreign government.… (1) For increases in established wage rates or material prices, the increase in contract unit price(s) shall be effective on the same date that the government named in paragraph (a) of this clause increased the applicable wage rate(s) or m…
- FAR 52.216-5 Price Redetermination—Prospective.…ert the following clause: Price Redetermination—Prospective (JAN 2022) (a) General. The unit prices and the total price stated in this contract shall be periodically redetermined in accordance with this clause, except that (1) the prices …
- FAR 52.222-31 Construction Wage Rate Requirements—Price Adjustment (Percentage Method).…d. (b) The Contracting Officer will adjust the portion of the contract price or contract unit price(s) containing the labor costs subject to the Construction Wage Rate Requirements statute to provide for an increase in wages and fringe ben…
- FAR 52.229-6 Taxes—Foreign Fixed-Price Contracts.…nt that this contract provides for furnishing supplies or performing services outside the United States and its outlying areas, this clause applies in lieu of any Federal, State, and local taxes clause of the contract. (b) Definitions. As …
- DFARS 252.223-7002 Safety Precautions for Ammunition and Explosives.As prescribed in 223.370-5, use the following clause: Safety Precautions for Ammunition and Explosives (NOV 2023) (a) Definition. Ammunition and explosives, as used in this clause— (1) Means liquid and solid propellants and explosives, p…
- DFARS 252.229-7006 Value Added Tax Exclusion (United Kingdom)As prescribed in 229.402-70(f), use the follow clause: Value Added Tax Exclusion (United Kingdom) (DEC 2011) The supplies or services identified in this contract are to be delivered at a price exclusive of value added tax under arrangemen…
- DFARS 252.229-7008 Relief from Import Duty (United Kingdom)As prescribed in 229.402-70(h), use the following clause: Relief from Import Duty (United Kingdom) (DEC 2011) Any import dutiable articles, components, or raw materials supplied to the United States Government under this contract shall be…
- DFARS 252.229-7009 Relief from customs duty and value added tax on fuel (passenger vehicles) (United Kingdom).…owing clause: Relief from Customs Duty and Value Added Tax on Fuel (Passenger Vehicles) (United Kingdom) (JUN 1997) (a) Pursuant to an agreement between the United States Government and Her Majesty's (HM) Customs and Excise, fuels and lub…
- DFARS 252.229-7010 Relief from customs duty on fuel (United Kingdom).…prescribed in 229.402-70(j), use the following clause: Relief from Customs Duty on Fuel (United Kingdom) (JUN 1997) (a) Pursuant to an agreement between the United States Government and Her Majesty's (HM) Customs and Excise, it is possibl…
- FAR 8.405-3 Blanket purchase agreements (BPAs).…the work; (B) The BPA provides only for firm-fixed priced orders for— (1) Products with unit prices established in the BPA; or (2) Services with prices established in the BPA for specific tasks to be performed; (C) Only one source is qu…
- FAR 15.404-1 Proposal analysis techniques.…ds/application of rough yardsticks (such as dollars per pound or per horsepower, or other units) to highlight significant inconsistencies that warrant additional pricing inquiry. (iv) Comparison with competitive published price lists, publ…
- FAR 15.408 Solicitation provisions and contract clauses.…tor Certified Cost or Pricing Data—Modifications, with its Alternate I. (f) Integrity of Unit Prices. (1) The contracting officer shall insert the clause at 52.215-14, Integrity of Unit Prices, in solicitations and contracts except for— (…
- FAR 16.505 Ordering.…rvices, line item number, subline item number (if applicable), description, quantity, and unit price or estimated cost and fee (as applicable). The corresponding line item number and subline item number from the base contract shall also be …
- FAR 22.404-12 Labor standards for contracts containing construction requirements and option provisions that extend the term of the contract.…the term of the contract: (1) The contracting officer may provide the offerors the opportunity to bid or propose separate prices for each option period. The contracting officer must not further adjust the contract price as a result of the …
- FAR 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts).…ch renewal option period, shall apply to this contract. (d) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect the Contractor's actual increase or decrease in applicable wages and f…
- FAR 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment.…sts for which adjustment is provided under this clause. (c) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect increases or decreases by the Contractor in wages and fringe benefits …
- FAR 52.229-7 Taxes—Fixed-Price Contracts With Foreign Governments.…ontracts under this contract, does not include any tax or duty that the Government of the United States and the Government of ____ [insert name of the foreign government] have agreed shall not apply to expenditures made by the United States…
- FAR 52.232-30 Installment Payments for Commercial Products and Commercial Services.…yment financing shall be paid to the Contractor when requested for each separately priced unit of supply (but not for services) of each line item in amounts approved by the Contracting Officer pursuant to this clause. (1) Number of install…
- DFARS 204.7103-1 Criteria for establishing.…tem appropriate even though one of the characteristics appears to be missing— (1) Single unit price. The item shall have a single unit price or a single total price, except— (i) If the item is not separately priced (NSP) but the price is …
- DFARS 204.7104-1 Criteria for establishing.…ii) Have collateral costs, such as packaging costs, but those costs are not a part of the unit price of the contract line item; (iv) Have different delivery dates or destinations or requisitions, or a combination of the three; or (v) Iden…
- DFARS 204.7106 Contract modifications.… the items ordered on the original line item or subline item and the resulting changes in unit price can be averaged to provide a new single unit price for the total quantity. If the changes in the specifications make the item significantly…
- DFARS 211.274-3 Policy for valuation.(a) It is DoD policy that contractors shall be required to identify the Government's unit acquisition cost for all deliverable end items to which item unique identification applies. (b) The Government's unit acquisition cost is— (1) For f…
- DFARS 252.204-7002 Payment for Contract Line or Subline Items Not Separately Priced.…ntract line or subline items identified as not separately priced (NSP), it means that the unit price for the NSP line or subline item is included in the unit price of another, related line or subline item. (b) The Contractor shall not invo…
- DFARS 252.211-7003 Item Unique Identification and Valuation.…ans a code that is uniquely assigned to an enterprise by an issuing agency. Government's unit acquisition cost means— (1) For fixed-price type line, subline, or exhibit line items, the unit price identified in the contract at the time of …
- DFARS 252.216-7007 Economic price adjustment—basic steel, aluminum, brass, bronze, or copper mill products-representation.…l Products—Representation (MAR 2012) (a) Definitions. The terms “established price” and “unit price,” as used in this provision, have the meaning given in the clause 252.216-7000, Economic Price Adjustment—Basic Steel, Aluminum, Brass, Bro…
- FAR 16.203-4 Contract clauses.…use an agency-prescribed clause instead of the clause at 52.216-2. (3) If the negotiated unit price reflects a net price after applying a trade discount from a catalog or list price, the contracting officer shall document in the contract f…
- FAR 17.106-3 Special procedures applicable to DoD, NASA, and the Coast Guard.… and that dual proposals are not necessary to meet the objectives in 17.105-2. (g) Level unit prices. Multiyear contract procedures provide for the amortization of certain costs over the entire contract quantity resulting in identical (lev…
- FAR 36.208 Concurrent performance of firm-fixed-price and other types of construction contracts.…not be permitted concurrently, at the same work site, with firm-fixed-price, lump sum, or unit price contracts except with the prior approval of the head of the contracting activity.
- FAR 49.603-2 Fixed-price contracts—partial termination.…n clearly as to (i) line item numbers, (ii) descriptions, (iii) quantity terminated, (iv) unit price of items, (v) total price of terminated items, and (vi) any other explanation necessary to avoid uncertainty or misunderstanding]. (2) The…
- FAR 52.216-6 Price Redetermination—Retroactive.…ert the following clause: Price Redetermination—Retroactive (JAN 2022) (a) General. The unit price and the total price stated in this contract shall be redetermined in accordance with this clause, but in no event shall the total amount pa…
- DFARS 236.570 Additional provisions and clauses.…d. (6) 252.236-7008, Contract Prices—Bidding Schedule, if the contract will contain only unit prices for some items. (c) Use the following provisions in solicitations for military construction contracts that are funded with military const…
- DFARS 252.225-7032 Waiver of United Kingdom Levies—Evaluation of offers.As prescribed in 225.1101(7), use the following provision: Waiver of United Kingdom Levies—Evaluation of Offers (APR 2003) (a) Offered prices for contracts or subcontracts with United Kingdom (U.K.) firms may contain commercial exploitati…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.