48 CFR · Federal Acquisition Regulation and Defense supplement
FAR and DFARS navigator
The codified text (eCFR, as of 2026-10-02). Under the Revolutionary FAR Overhaul ↗, agencies follow class deviations with new text for many parts while the formal rules go through the Federal Register: check the solicitation and your contract's clauses, which rule.
Ask the FAR
Try: · · ·
30 sections with “break out”
- DFARS 207.171-3 Policy.DoD policy is to break out components of weapons systems or other major end items under certain circumstances. (a) When it is anticipated that a prime contract will be awarded without adequate price competition, and the prime contractor is…
- DFARS 217.7506 Spare parts breakout program.…me 9, DoD Supply Chain Materiel Management Procedures: Materiel Programs, for spare parts breakout requirements.
- DFARS 207.171 Component breakout.
- FAR 15.408 Solicitation provisions and contract clauses.…nship between line item prices and the total contract price. You must attach cost-element breakdowns for each proposed line item, using the appropriate format prescribed in the “Formats for Submission of Line Item Summaries” section of this…
- DFARS 252.225-7040 Contractor Personnel Supporting U.S. Armed Forces Deployed Outside the United States.…ents' issuing authority; (B) Receive agreed upon wages on time; (C) Take lunch and work-breaks; (D) Elect to terminate employment at any time; (E) Identify grievances without fear of reprisal; (F) Have a copy of their employment contra…
- FAR 50.103-4 Facts and evidence.… of the following information: (1) A statement and evidence of the contractor's original breakdown of estimated costs, including contingency allowances, and profit. (2) A statement and evidence of the contractor's present estimate of tota…
- DFARS 215.407-4 Should-cost review.…ctor) team in a streamlined manner, if necessary. (F) Identification of opportunities to break out Government-furnished equipment versus prime contractor-furnished materials. (G) Identification of items or services contracted through thir…
- FAR 2.101 Definitions.… railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, canals, dredging, shoring, rehabilitation and reactivation of plants, scaffolding, drilling, blasting, excavating, clearing, and …
- FAR 31.205-13 Employee morale, health, welfare, food service, and dormitory costs and credits.…ervices are allowable only if the contractor's objective is to operate such services on a break-even basis. (ii) Losses sustained because food services or lodging accommodations are furnished without charge or at prices or rates which obvi…
- DFARS 207.171-1 Scope.(a) This section provides policy for breaking out components of end items for future acquisitions so that the Government can purchase the components directly from the manufacturer or supplier and furnish them to the end item manufacturer as…
- FAR 6.302-3 Industrial mobilization; engineering, developmental, or research capability; or expert services.…tion, contractors that are manufacturing critical items, where there would otherwise be a break in production; or (vi) Divide current production requirements among two or more contractors to provide for an adequate industrial mobilization …
- FAR 7.105 Contents of written acquisition plans.… cannot be obtained. (ii) Identify the major components or subsystems. Discuss component breakout plans relative to these major components or subsystems. Describe how competition will be sought, promoted, and sustained for these components…
- FAR 9.604 Limitations.…nment; (d) Pursue its policies on competitive contracting, subcontracting, and component breakout after initial production or at any other time; and (e) Hold the prime contractor fully responsible for contract performance, regardless of a…
- FAR 15.404-1 Proposal analysis techniques.…distorted through application of overhead and whether such items should be considered for breakout. The contracting officer should require such information in all other negotiated contracts when appropriate. (g) Unbalanced pricing. (1) Unb…
- FAR 15.404-4 Profit.…eded. (5) The contracting officer shall not require any prospective contractor to submit breakouts or supporting rationale for its profit or fee objective but may consider it, if it is submitted voluntarily. (6) If a change or modificatio…
- FAR 15.503 Notifications to unsuccessful offerors.…b)(1)(iv) of this section readily reveals the reason. In no event shall an offeror's cost breakdown, profit, overhead rates, trade secrets, manufacturing processes and techniques, or other confidential business information be disclosed to a…
- FAR 15.506 Postaward debriefing of offerors.…) Commercial and financial information that is privileged or confidential, including cost breakdowns, profit, indirect cost rates, and similar information; and (4) The names of individuals providing reference information about an offeror's…
- FAR 19.402 Small Business Administration procurement center representatives.…mall, and women-owned small eligible under the Women-Owned Small Business Program; (iii) Breakout of discrete components, items, and requirements for competitive acquisitions; and (iv) Ways to improve competition. (2) Reviewing proposed …
- FAR 19.705-7 Compliance with the subcontracting plan.…of the following, though not all inclusive, to be indicators of a good faith effort: (i) Breaking out work to be subcontracted into economically feasible units, as appropriate, to facilitate small business participation. (ii) Conducting m…
- FAR 25.601 Definitions.… railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. Recovery Act designated countr…
- FAR 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards.…ilings at http://www.sec.gov/answers/execomp.htm.) (e) The Contractor shall not split or break down first-tier subcontract awards to a value below the threshold specified in FAR 4.1403(a), on the date of subcontract award, to avoid the rep…
- FAR 52.248-2 Value Engineering—Architect-Engineer.…chitect-engineering contract the contractor shall— (1) Provide the Government with a fee breakdown schedule for the VE services (such as criteria review, task team review, and bid package review) included in the contract schedule; (2) Sub…
- DFARS 207.171-4 Procedures.Agencies shall follow the procedures at PGI 207.171-4 for component breakout.
- DFARS 215.404-71-4 Facilities capital employed.…ract appropriate contract overhead allocation base data, by year, from the evaluated cost breakdown or prenegotiation cost objective and list against each overhead pool and direct-charging service center. (iii) Multiply each allocation bas…
- DFARS 218.170 Additional acquisition flexibilities.…iate work on a vessel. See 217.7103-4, 252.217-7010, and PGI 217.7103-4. (e) Spare parts breakout program. An urgent immediate buy need not be delayed if an evaluation of the additional information cannot be completed in time to meet the r…
- DFARS 225.7004-3 Exceptions.…ips. The restriction at 225.7004-2(c) does not apply to large medium-speed engines for icebreakers or special mission ships. (e) Star trackers. The restriction at 225.7004-2(e) does not apply to acquisition programs that have received Mile…
- DFARS 236.570 Additional provisions and clauses.…construction solicitations and contracts— (1) 252.236-7000, Modification Proposals-Price Breakdown; and (2) 252.236-7001, Contract Drawings and Specifications. (b) Use the following provisions and clauses in fixed-price construction cont…
- DFARS 237.7204 Format and clauses for educational service agreements.…nonresident status of each student (if applicable to the Contractor's school); and (v) A breakdown of charges for each student, including credit hours, tuition, application fee, and other fees. Provide a total for each student and a grand …
- DFARS 247.270-1 Definitions.…rom an agreed point of rest on a pier or lighter and its storage aboard a vessel; or (2) Breaking out and discharging of cargo from any space in the vessel to an agreed point of rest dockside or in a lighter.
- DFARS 252.217-7001 Surge option.…on exercise, submit to the Contracting Officer a cost or price proposal (including a cost breakdown) for the added or accelerated items. (2) Failure to agree on a cost or price in negotiations resulting from the exercise of this option sha…
FAR (chapter 1)
- Part 1 Federal Acquisition Regulations System 58 sections
- Part 2 Definitions of Words and Terms 3 sections
- Part 3 Improper Business Practices and Personal Conflicts of Interest 98 sections
- Part 4 Administrative and Information Matters 116 sections
- Part 5 Publicizing Contract Actions 34 sections
- Part 6 Competition Requirements 34 sections
- Part 7 Acquisition Planning 34 sections
- Part 8 Required Sources of Supplies and Services 67 sections
- Part 9 Contractor Qualifications 106 sections
- Part 10 Market Research 4 sections
- Part 11 Describing Agency Needs 33 sections
- Part 12 Acquisition of Commercial Products and Commercial Services 38 sections
- Part 13 Simplified Acquisition Procedures 49 sections
- Part 14 Sealed Bidding 82 sections
- Part 15 Contracting by Negotiation 81 sections
- Part 16 Types of Contracts 74 sections
- Part 17 Special Contracting Methods 50 sections
- Part 18 Emergency Acquisitions 34 sections
- Part 19 Small Business Programs 126 sections
- Part 22 Application of Labor Laws to Government Acquisitions 205 sections
- Part 23 Environment, Sustainable Acquisition, and Material Safety 38 sections
- Part 24 Protection of Privacy and Freedom of Information 10 sections
- Part 25 Foreign Acquisition 81 sections
- Part 26 Other Socioeconomic Programs 36 sections
- Part 27 Patents, Data, and Copyrights 59 sections
- Part 28 Bonds and Insurance 61 sections
- Part 29 Taxes 23 sections
- Part 30 Cost Accounting Standards Administration 30 sections
- Part 31 Contract Cost Principles and Procedures 87 sections
- Part 32 Contract Financing 175 sections
- Part 33 Protests, Disputes, and Appeals 23 sections
- Part 34 Major System Acquisition 20 sections
- Part 35 Research and Development Contracting 25 sections
- Part 36 Construction and Architect-engineer Contracts 81 sections
- Part 37 Service Contracting 46 sections
- Part 38 Federal Supply Schedule Contracting 3 sections
- Part 39 Acquisition of Information Technology 14 sections
- Part 40 Information Security and Supply Chain Security 12 sections
- Part 41 Acquisition of Utility Services 17 sections
- Part 42 Contract Administration and Audit Services 84 sections
- Part 43 Contract Modifications 14 sections
- Part 44 Subcontracting Policies and Procedures 24 sections
- Part 45 Government Property 33 sections
- Part 46 Quality Assurance 60 sections
- Part 47 Transportation 106 sections
- Part 48 Value Engineering 13 sections
- Part 49 Termination of Contracts 108 sections
- Part 50 Extraordinary Contractual Actions and the Safety Act 34 sections
- Part 51 Use of Government Sources by Contractors 15 sections
- Part 52 Solicitation Provisions and Contract Clauses 680 sections
- Part 53 Forms 61 sections
DFARS (chapter 2, Defense)
- Part 201 Federal Acquisition Regulations System 24 sections
- Part 202 Definitions of Words and Terms 1 sections
- Part 203 Improper Business Practices and Personal Conflicts of Interest 28 sections
- Part 204 Administrative and Information Matters 76 sections
- Part 205 Publicizing Contract Actions 11 sections
- Part 206 Competition Requirements 20 sections
- Part 207 Acquisition Planning 22 sections
- Part 208 Required Sources of Supplies and Services 31 sections
- Part 209 Contractor Qualifications 55 sections
- Part 210 Market Research 2 sections
- Part 211 Describing Agency Needs 22 sections
- Part 212 Acquisition of Commercial Products and Commercial Services 24 sections
- Part 213 Simplified Acquisition Procedures 23 sections
- Part 214 Sealed Bidding 14 sections
- Part 215 Contracting by Negotiation 66 sections
- Part 216 Types of Contracts 36 sections
- Part 217 Special Contracting Methods 64 sections
- Part 218 Emergency Acquisitions 7 sections
- Part 219 Small Business Programs 47 sections
- Part 222 Application of Labor Laws to Government Acquisitions 56 sections
- Part 223 Environment, Sustainable Acquisition, and Material Safety 34 sections
- Part 224 Protection of Privacy and Freedom of Information 2 sections
- Part 225 Foreign Acquisition 251 sections
- Part 226 Other Socioeconomic Programs 14 sections
- Part 227 Patents, Data, and Copyrights 99 sections
- Part 228 Bonds and Insurance 17 sections
- Part 229 Taxes 9 sections
- Part 230 Cost Accounting Standards Administration 2 sections
- Part 231 Contract Cost Principles and Procedures 13 sections
- Part 232 Contract Financing 74 sections
- Part 233 Protests, Disputes, and Appeals 8 sections
- Part 234 Major System Acquisition 13 sections
- Part 235 Research and Development Contracting 16 sections
- Part 236 Construction and Architect-engineer Contracts 25 sections
- Part 237 Service Contracting 67 sections
- Part 239 Acquisition of Information Technology 38 sections
- Part 241 Acquisition of Utility Services 8 sections
- Part 242 Contract Administration and Audit Services 40 sections
- Part 243 Contract Modifications 18 sections
- Part 244 Subcontracting Policies and Procedures 13 sections
- Part 245 Government Property 23 sections
- Part 246 Quality Assurance 39 sections
- Part 247 Transportation 27 sections
- Part 249 Termination of Contracts 14 sections
- Part 250 Extraordinary Contractual Actions and the Safety Act 16 sections
- Part 251 Use of Government Sources by Contractors 5 sections
- Part 252 Solicitation Provisions and Contract Clauses 405 sections
- Part 253 Forms 10 sections
- Part 270 Defense Contracting Programs 7 sections
Source: eCFR, 48 CFR chapters 1 and 2 (GPO GovInfo bulk data) ↗. Rule changes in progress: FAR, DFARS. Terms: glossary.